Regeneration and management of green areas in the city of Resko (Q85768)

From EU Knowledge Graph
Revision as of 14:42, 22 June 2020 by DG Regio (talk | contribs) (‎Removed claims)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Regeneration and management of green areas in the city of Resko
Project in Poland financed by DG Regio

    Statements

    0 references
    3,468,438.4 zloty
    0 references
    832,425.2159999999 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 January 2014
    0 references
    31 March 2019
    0 references
    GMINA RESKO
    0 references
    0 references
    0 references

    53°46'24.2"N, 15°24'20.2"E
    0 references
    Realizacja wnioskowanego projektu przewiduje prace związane z przekształceniem zaniedbanych i w większości nieurządznych terenów na funkcjonalne tereny zieleni miejskiej. Wnioskodawcą, Beneficjentem dotacji, oraz właścicielem oraz późniejszym operatorem terenów zieleni będących przedmiotem projektu będzie Gmina Resko.Projekt obejmować będzie prace na 4 terenach zlokalizowanych w mieście Resko: 1. „NAD REGĄ” – pow. całk. 29 028 m2, z czego 10 640 m2 nie pełni obecnie funkcji terenu zieleni – planuje się wykonanie nasadzeń, montaż elementów małej architektury, budowę alejek i oświetlenia, oczyszczenie zbiornika wodnego i wykonanie piaszczystej plaży, umocnienie skarpy. Koszt: 609 135,02 zł brutto 2. „PRZY STADIONIE” - pow. całk. 10 157 m2 – planuje się wykonanie nasadzeń, montaż elementów małej architektury, budowę alejek, placu zabaw i oświetlenia. Koszt: 542 380,04 zł brutto 3. „PRZY DOMU KULTURY” - pow. całk. 10 739 m2, z czego 10 111 m2 nie pełni obecnie funkcji terenu zieleni – planuje się wykonanie nasadzeń, montaż elementów małej architektury, budowę alejek, placu zabaw, sceny z widownią oraz oświetlenia, wykonanie robót ziemnych. Koszt: 592 126,15 zł brutto 4. „ZA WAŁEM” - pow. całk. 16 712 m2, z czego 15 867 m2 nie pełni obecnie funkcji terenu zieleni – planuje się wykonanie nasadzeń, montaż elementów małej architektury, budowę alejek, placu zabaw i oświetlenia. Koszt: 1 009 325,84 zł brutto (Polish)
    0 references
    The implementation of the proposed project provides for work linked to the transformation of neglected areas and most of the derelict sites on the functional green spaces of the city.The applicant, the grant beneficiary and the owner and the subsequent operator of the green landscape forming the subject of the project will be the Municipality of Reska.This project will comprise the work on 4 sites located in the town of Resko:1.‘NAD REGION’ — Liver.29 028 m², of which 10 640 m² are currently not part of the green landscape, are plantings, the installation of elements of small architecture, the construction of the pipes and lighting, the cleaning of the water reservoir and a sandy beach, the consolidation of the turbot.Cost:PLN 609 135,02 gross 2.‘Bands’ — integral.10 157 m² are intended to be planted, the installation of elements of small architecture, the construction of the Alevis, the playground and the lighting.Cost:PLN 542 380,04 gross 3.“IN THE KULTURY OF THE KULTURY” — integral.10 739 m², of which 10 111 m² are currently not part of the green landscape, it is planned to carry out the planting, fitting of the elements of a small architecture, the construction of the Alevis, the playground, the scene with the audience and the lighting, the execution of the earthworks.Cost:PLN 592 126,15 gross 4.‘A shaft’ — integral.16 712 m², of which 15 867 m² are currently not part of the green landscape, are plantings, the installation of elements of a small architecture, the construction of the Alevis, the playground and the lighting.Cost:PLN 1 009 325,84 gross (English)
    0 references

    Identifiers

    POIS.02.05.00-00-0148/16
    0 references