The purchase and installation of a 40 kW photovoltaic installation at the company PPHU Llimeba RYSZARD MAJEWSKI AND TOMASZ Szerel SPOLKA JAWNA (Q131752)

From EU Knowledge Graph
Revision as of 10:56, 7 June 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
The purchase and installation of a 40 kW photovoltaic installation at the company PPHU Llimeba RYSZARD MAJEWSKI AND TOMASZ Szerel SPOLKA JAWNA
Project in Poland financed by DG Regio

    Statements

    0 references
    207,400.0 zloty
    0 references
    49,776.0 Euro
    13 January 2020
    0 references
    300,120.0 zloty
    0 references
    72,028.8 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    23 March 2016
    0 references
    12 June 2017
    0 references
    "PPHU LIMBA RYSZARD MAJEWSKI I TOMASZ SZEREL" SPÓŁKA JAWNA
    0 references

    54°2'20.8"N, 22°29'37.7"E
    0 references
    Planowana inwestycja polegać będzie na zakupie i montażu instalacji fotowoltaicznej zlokalizowanej na działce nr 137/3 w miejscowości Kukowo na dachu budynku produkcyjnego. Moc instalacji wynosić będzie 39,90 kW. Do realizacji przedmiotowej inwestycji nie są wymagane pozwolenie na budowę, ani uzyskanie decyzji środowiskowej. Uzyskana energia będzie wykorzystywana na potrzeby własne przedsiębiorstwa a nadwyżka energii sprzedawana będzie do ogólnopolskiego operatora energii elektrycznej. Realizacja projektu jest uzasadniona zarówno ekonomicznie, środowiskowo, społecznie i gospodarczo oraz przyczyni się do osiągania założonych przez Unię Europejską wytycznych. Celem głównym projektu jest zwiększenie udziału odnawialnych źródeł energii w ogólnym bilansie energetycznym w województwie warmińsko-mazurskim poprzez zakup i montaż instalacji fotowoltaicznej o mocy 39,90 kW na dachu budynku produkcyjnego przez firmę PPHU LIMBA RYSZARD MAJEWSKI I TOMASZ SZEREL SPÓŁKA JAWNA w miejscowości Kukowo do IX 2017r. Etapy realizacji: 1. Etap przygotowań –wybór wykonawcy zgodnie z zasadą konkurencyjności 2. Etap Wdrożenia- zakup i montaż: a) paneli fotowoltaicznych b) inwerterów c) układ pomiarowy d) instalacja odgromowa e) połączenia wyrównawcze f) instalacja przeciwprzepięciowa g) ochrona od porażeń Projekt jest zgodny ze Strategią rozwoju społeczno-gospodarczego województwa warmińsko- mazurskiego do roku 2025 oraz wpisuje się w SZOOP RPO WiM 2014-2020 gdyż przyczynia się do realizacji zaplanowanych ww. dokumentach celów, wskaźników i rezultatów, jest zgodny z możliwymi do dofinansowania formami wsparcia oraz typem beneficjentów . Projekt realizuje cel Działania 4.1 zwiększony udział odnawialnych źródeł energii w ogólnym bilansie energetycznym regionu poprzez zakup i montaż instalacji fotowoltaicznej o mocy 39,90 kW. (Polish)
    0 references
    The planned investment will consist of the purchase and installation of a photovoltaic installation located on plot No 137/3 in Kukowo on the roof of the building. The capacity of the installation will be 39.90 kW. The implementation of the investment in question is not required to obtain a building permit or to obtain an environmental decision. The resulting energy will be used for the company’s own needs and surplus energy will be sold to the Polish electricity operator. The implementation of the project is both economically, environmentally, socially and economically justified and will contribute to the implementation of the guidelines set by the European Union. The main purpose of the project is to increase the share of renewable energy sources in the total energy balance in Warmińsko-Mazurskie Province by the purchase and installation of a 39.90 kW photovoltaic installation on the roof of a production building by PPHU Llimeba RYSZARD MAJEWSKI AND TOMASZ Szerel SPOLKA JAWNA, in Kukowo to IX 2017. Implementation steps: 1. Preparation phase — selection of the contractor in accordance with the competitiveness principle 2. Implementation phase — purchase and assembly: (a) (a) (a) (a) (c) (c) (c) (c) (c) (d) balancing equipment (e) balancing equipment (f) balancing equipment (g) the protection against the prescriptions of the project is in line with the socio-economic development strategy for Warmińsko-Mazurskie Province until 2025 and is in line with the strategy for the socio-economic development of ROP WM 2014-2020, as it contributes to the achievement of the planned documents, indicators and results, is compatible with the forms of support and the type of beneficiaries envisaged. The project meets the objective of Measure 4.1 to increase the share of renewable energy sources in the overall energy balance of the region through the purchase and installation of a 39.90 kW photovoltaic power plant. (English)
    0 references

    Identifiers

    RPWM.04.01.00-28-0083/16
    0 references