Construction of a selective municipal waste collection centre in Długosiodło. (Q109262)

From EU Knowledge Graph
Revision as of 22:49, 6 June 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of a selective municipal waste collection centre in Długosiodło.
Project in Poland financed by DG Regio

    Statements

    0 references
    416,034.52 zloty
    0 references
    99,848.2848 Euro
    13 January 2020
    0 references
    888,184.19 zloty
    0 references
    213,164.2056 Euro
    13 January 2020
    0 references
    65.14 percent
    0 references
    7 April 2017
    0 references
    30 June 2019
    0 references
    GMINA DŁUGOSIODŁO
    0 references

    52°45'34.6"N, 21°35'34.4"E
    0 references
    Projekt dotyczy budowy Punktu Selektywnej Zbiórki Odpadów Komunalnych (PSZOK) w miejscowości Długosiodło dla mieszkańców gm. Długosiodło. Przedsięwzięcie obejmuje projekt, roboty budowlane, nadzór, zakup wyposażenia PSZOK a także działania promocyjne związane z projektem. W PSZOK zbieranych będzie 16 frakcji odp. (zgodnych z Katalogiem odpadów - zał. do Regulaminu konkursu): papier, tworzywa sztuczne, szkło, opakowania wielomateriałowe, zmieszane odp. opakowaniowe, przeterminowane leki, chemikalia oraz zanieczyszczone opakowania, zużyte baterie i akumulatory, zużyty sprzęt elektr. i elektron., meble i inne odp. wielkogabarytowe, odp. budowlane i rozbiórkowe, zużyte opony, odp. zielone, odzież i tekstylia inne niż biodegradowalne, popioły, inne odp. nie wymienione wyżej. W PSZOK będzie funkcjonował punkt napraw oraz punkt przyjmowania rzeczy używanych niestanowiących odp., celem ponownego użycia. Planowana jest też promocyjna akcja edukacyjna dot. selektywnego zbierania odp.. Projekt obejmuje 100% mieszkańców gm. Długosiodło. Zostaną utworzone dwa miejsca pracy. PSZOK otwarty będzie min. 8 godz., 5 dni w tygodniu, w tym sobota, min. do godz.19:00. W ramach projektu przewiduje się: wykonanie prac związanych z zagospodarowaniem terenu (utwardzenie, organizacja spływu wody, nasadzenia zieleni, wiata pod kontenery otwarte), zakup i ustawienie pojemników i kontenerów na odp., oświetlenie terenu, ogrodzenie, oznakowanie poziome placu, tablice informacyjne i edukacyjne. Dzięki realizacji projektu poprawie ulegnie system gospodarki odpadami w gminie, a gm. Długosiodło wywiąże się z obowiązku utworzenia PSZOK zawartego w ustawie o utrzymaniu czystości i porządku w gminach. Planowana inwestycja została wpisana do Planu inwestycyjnego dla województwa mazowieckiego w ramach Planu gospodarki odpadami dla województwa mazowieckiego 2022 i będzie realizowana we wschodnim regionie gospodarki odpadami komunalnymi, gdzie nie uwzględniono komponentu dot. termicznego przekształcania odp. (Polish)
    0 references
    The project relates to the construction of the selective municipal waste collection centre (PSZOK) in the municipality of Długosiło for the inhabitants of the Long Term Residents. The project includes a project, construction works, supervision, the purchase of PSZOK equipment and the promotional activities associated with the project. In the PSZOK the 16 fractions will be collected. (in accordance with the Waste Catalogue, as set out in the Annex to the Rules of Procedure): paper, plastic, glass, composite packaging, packaging, out-dated medicines, chemicals and contaminated packaging, waste batteries and accumulators, waste electrical and electrical appliances, furniture and other bulky products, construction and demolition, used tyres, green, clothing and textiles other than biodegradable, ashes, other items not mentioned above. The PSZOK will operate a point of repair and the point of acceptance of second-hand goods that do not do so., for re-use. A promotional campaign for separate collection is also planned. The project covers 100 % of the inhabitants of the Long Term Residents. Two jobs will be created. The PSZOK will be open at least 8 hours, 5 days a week, including Saturday, 19: 00. The project provides for: development of site management (paving, organisation of water runoff, planting of green trees, shelters for open containers), purchase and setting of containers and containers for odp, land lighting, fencing, road markings, signs and educational signs. With the implementation of the project, the waste management system in the municipality will be improved and, inter alia, it will honour the obligation to establish the PSZOK contained in the Act on the maintenance of cleanliness and order in the municipalities. The planned investment has been included in the investment plan for the Mazowieckie region in the framework of the Waste Management Plan for Mazowieckie Province 2022 and will be carried out in the Eastern Region of Municipal Waste Management where the thermal transformation component has not been taken into account. (English)
    0 references

    Identifiers

    RPMA.05.02.00-14-8789/17
    0 references