Reconstruction and extension of the building at ul. The Czechs in Limanowa for the purpose of a culture House with a performing living room (Q112806)
Jump to navigation
Jump to search
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Reconstruction and extension of the building at ul. The Czechs in Limanowa for the purpose of a culture House with a performing living room |
Project in Poland financed by DG Regio |
Statements
1,817,488.26 zloty
0 references
12,681,004.57 zloty
0 references
43.35 percent
0 references
3 April 2017
0 references
31 March 2020
0 references
MIASTO LIMANOWA
0 references
W ramach projektu zaprojektowano przebudowę i rozbudowę sali widowiskowej poprzez powiększenie widowni do 439 miejsc. Powiększenie sceny wraz z rozbudową zaplecza scenicznego w postaci garderób, magazynów i niezbędnego zaplecza technicznego. Rozbudowę foyer wraz z punktem szatniowo-kasowym i węzłem sanitarnym. Zaprojektowano dostosowanie obiektu dla potrzeb osób niepełnosprawnych. Zaprojektowano również termomodernizację budynku i przebudowę elewacji wraz z wymianą stolarki okiennej i drzwiowej. Bryłę sali widowiskowej wyodrębniono wizualnie poprzez zastosowanie ażurowych elementów elewacji. Zaprojektowano nową strefę wejściową do budynku. W zakresie zagospodarowania działki przewidziano wykonanie utwardzenia terenu (dojścia i dojazdy). Dodatkowe wyjaśnienia: Zakres rzeczowy projektu obejmują działania inwestycyjne: 1.1 Prace rozbiórkowe i demontażowe 1.2 Stan surowy zamknięty budynku - część dobudowana i roboty adaptacyjne w części istniejącej 1.3 Roboty wykończeniowe wewnętrzne 1.4 Roboty wykończeniowe zewnętrzne 1.5 Roboty instalacyjne 1.6 Instalacja elektryczna 1.7 Instalacja teletechniczna 1.8 Plac przy budynku 1.9 Wyposażenie Sali Widowiskowej 1.10 Adaptacja części komercyjnej na szatnie oraz toalety oraz działania związane z pozostałymi kosztami: 2.1 Nadzór inwestorski 2.2 Nadzór autorski 2.3 Certyfikat energetyczny 2.4 Promocja projektu (Polish)
0 references
As part of the project, the refurbishment and expansion of the performing room were designed by increasing the audience of the audience to 439. Enlargement of the stage with the extension of stage facilities in the form of a suit, warehouse and necessary technical support. The development of the foyer with a cash and health point. The object is designed to adapt the object to the needs of persons with disabilities. The renovation of the building and the conversion of the façade along with the replacement of window and door frames are also designed. The performing hall has been separated visually by use of the façade elements. The new entrance area to the building is designed. In the area of land use, provision is made for paving the way for a site (access to and access to the site). Further clarifications: The scope of the project includes investment activities: 1.1 Demolition and dismantling works 1.2 The state of the raw closed part of the building — the renovated part and the fit-out works for part of the existing 1.3 Works with completion of 1.4 external works 1.5 Works 1.7 works (installation works installation works 1.6 installation installation. Teletechnical 1.8 Plac at Building 1.9 Equipment Skali Widvik 1.10 Adaptation of commercial parts to changing rooms and toilets, and other costs related to the other costs: 2.1 Investor’s supervision 2.2 Self-oversight 2.3 Certificate Energy Certificate 2.4 Design Promotion (English)
0 references
Identifiers
RPMP.06.01.03-12-0380/16
0 references