Deep energy renovation of the Castle of Kłków Castle (Q95426)

From EU Knowledge Graph
Revision as of 02:09, 7 June 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Deep energy renovation of the Castle of Kłków Castle
Project in Poland financed by DG Regio

    Statements

    0 references
    507,350.27 zloty
    0 references
    121,764.0648 Euro
    13 January 2020
    0 references
    1,162,680.8 zloty
    0 references
    279,043.392 Euro
    13 January 2020
    0 references
    55.02 percent
    0 references
    1 December 2015
    0 references
    31 December 2016
    0 references
    ZAMEK KLICZKÓW SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
    0 references
    Spółka powstała w celu odrestaurowania, zdewastowanego w okresie powojennym, kompleksu pałacowo-parkowego w Kliczkowie. Budynek Zamku został odrestaurowany w latach dziewięćdziesiątych XXw., park częściowo w latach 2013-2015r. W tym samym czasie przywrócono świetność również części zabudowań folwarcznych, otwierając w nich obiekt hotelarsko-gastronomiczno-konferencyjny Folwark Książęcy. Budynek Zamku posiada kubaturę 32604,63 m3 oraz powierzchnię netto 7926,25 m2. Zastosowane w czasie jego odbudowy technologie są obecnie przestarzałe. Diagnoza energetyczna stanu istniejącego wskazała, że ścian zewnętrznych ze względów konserwatorskich nie można docieplić, dach w części nie jest izolowany, system grzewczy składa się z czterech kotłów na ekogroszek o mocy 300 kW każdy (nie posiadają automatyki, niska sprawność z powodu braku możliwości pracy w kaskadzie), w ramach systemu cwu zasobniki ciepłej wody nie spełniają wymogów izolacyjnych. Te ustalenia były podstawą podjęcia decyzji o realizacji inwestycji. W ramach przedmiotowego projektu zostaną przeprowadzone przedsięwzięcia, których celem będzie podniesienie efektywności energetycznej Firmy. Planowane do realizacji przedsięwzięcia to: - modernizacja systemu ciepłej wody użytkowej. Przeprowadzony Audyt energetyczny wskazał, że istniejące zasobniki ciepłej wody nie spełniają standardów izolacyjnych i powodują znaczne straty energii. - modernizacja przegrody strop zewnętrzny. Część poddasza nie jest izolowana, co jest przyczyną większego zużycia energii cieplnej. Niniejszy projekt ma na celu dokonanie wyeliminowania tej wady. - modernizacja systemu grzewczego i oświetlenia LED. W ramach tego zadania przewidziano modernizację wentylacji w pomieszczeniach basenu i jego zaplecza, kuchni, Sali Teatralnej, co ma skutkować odzyskiwaniem znacznej części ciepła. Ponadto zostanie zmodernizowana kotłowania w celu zainstalowania systemów wraz z automatyką znacznie podnoszących sprawność instalacji. (Polish)
    0 references
    The company was set up for restoration, devastated during the post-war period, by a complex palace/steam complex in Klitkowo. The building was restored in the 1990s in the 1990s, part of the park between 2013 and 2015. At the same time, parts of the following were also restored, opening the premises of the Folwark Principe’s hospitality area. The Zamku building has a cubic capacity of 32 604.63 m³ and a net area of 7 926.25 m². The technology used at the time of its rebuilding is now outdated. The energy diagnosis of the existing state indicated that external walls could not be supplied insulation, the roof of the casing is not insulated, the heating system is made up of four boilers on ecopeas of 300 kW each (not in automation, low efficiency due to the lack of work capacity in the cascade), within the CWU system, the hot water tanks do not meet the insulation requirements. Those findings were the basis for the decision to implement the investment. In the context of this project, projects will be carried out to improve the energy efficiency of the Company. The projects planned for the implementation of the project are as follows: — modernisation of the hot water system. The Energy Audit pointed out that the existing hot water storage tanks do not meet insulation standards and cause significant energy losses. Renovation of the ceiling barrier. The lot is not isolated, which leads to higher heat consumption. The purpose of this project is to eliminate this defect. — modernisation of the heating system and LED lighting. This task provides for the modernisation of ventilation in the area of the swimming pool and its hinterland, the kitchen, the Sali Theatre, which will result in the recovery of a substantial part of the heat. In addition, the boiler will be modernised in order to install systems with automation which significantly increase the efficiency of the installation. (English)
    0 references

    Identifiers

    RPDS.03.02.00-02-0011/16
    0 references