SORAL — System for the assessment of technical status and risk of failure of an SN line based on offline diagnostic tests (Q80172)

From EU Knowledge Graph
Revision as of 23:35, 6 June 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
SORAL — System for the assessment of technical status and risk of failure of an SN line based on offline diagnostic tests
Project in Poland financed by DG Regio

    Statements

    0 references
    2,859,999.48 zloty
    0 references
    686,399.8752 Euro
    13 January 2020
    0 references
    4,452,266.67 zloty
    0 references
    1,068,544.0008 Euro
    13 January 2020
    0 references
    64.24 percent
    0 references
    1 June 2018
    0 references
    28 February 2022
    0 references
    ENERGA-OPERATOR SA
    0 references

    52°14'1.3"N, 21°4'17.0"E
    0 references

    54°11'56.0"N, 19°26'28.0"E
    0 references
    Linie kablowe SN są kluczowym elementem sieci dystrybucyjnej. Wiedza o stanie technicznym tej sieci jest bardzo ograniczona i głównie oparta jest o analizę awaryjności. Taki system oceny jest mało efektywny. Projekt obejmuje opracowanie efektywnego narzędzia oceny stanu izolacji i ryzyka awarii linii kablowych SN. W tym celu wykorzystana zostanie zintegrowana wiedza z pomiarów diagnostycznych, danych technicznych i eksploatacyjnych oraz wyniki prac badawczych. Na całym świecie trwają prace badawczo-rozwojowe w celu zdefiniowania kryteriów oceny opartych o diagnostykę, jak dotąd brak jest standardów. Projekt niniejszy jest więc innowacyjnym przedsięwzięciem. W części badań przemysłowych opracowany zostanie Health Index dla elementów linii kablowych. W badaniach tych wykorzystane zostaną dotychczasowe doświadczenia uzyskane z pomiarów wyładowań niezupełnych w obszarze miasta Elbląga (najdłuższa historia pomiarów w Polsce) oraz wyniki pracy doktorskiej oparte o pomiary w latach 2003-2009. Zaplanowano wykonanie pomiarów poszerzających okres badań o kolejne lata do 2020r. W ramach prac rozwojowych, w oparciu o Health Indeks, zostanie wykonany prototyp systemu informatycznego do oceny ryzyka wystąpienia awarii w liniach kablowych. Zostanie on zweryfikowany i skalibrowany podczas przeprowadzanych testów w obszarze pilotażowym. Głównym rezultatem projektu będzie prototyp innowacyjnego narzędzia informatycznego SORAL pozwalającego na ocenę stanu linii kablowych oraz zarządzanie nimi w oparciu o predictive maitanance. Rezultaty projektu w postaci prototypowego rozwiązania informatycznego SORAL będą w pierwszej kolejności wdrożone i wykorzystane biznesowo w ENERGA-OPERATOR SA (EOP). Numer_referencyjny_programu_pomocowego: SA.41471(2015/X) Przeznaczenie_pomocy_publicznej: art. 25 rozporządzenia KE nr 651/2014 z dnia 17 czerwca 2014 r. uznające niektóre rodzaje pomocy za zgodne z rynkiem wewnętrznym w stosowaniu art. 107 i 108 Traktatu (Dz. Urz. UE L 187/1 z 26.06.2014). (Polish)
    0 references
    The SN cable lines are a key element of the distribution network.The knowledge of the technical state of this network is very limited and is mainly based on the failure analysis.This evaluation system is not efficient.The project shall include the development of an effective assessment tool for the isolation and risk of breakdown of the NS cable lines.To this end, integrated knowledge of diagnostic measurements, technical and operating data and results of research will be used.Research and development (R & D) is ongoing worldwide in order to define the evaluation criteria for diagnosis, so far there are no standards.The project is thus an innovative project.A Health Index for cable pieces will be developed in part of the industrial research.These studies will make use of the experience gained so far from the measurement of non-complete landings in the area of the city of Elbląg (the longest history of measurements in Poland) and the results of a doctoral thesis based on the 2003-2009 period.It is planned to carry out measures extending the testing period by to 2020.As part of the development work, based on the Health Index, a prototype IT system will be used to assess the risk of failure along the cable lines.It will be verified and calibrated during the tests carried out in the pilot area.The main output of the project will be the prototype of the SORAL’s innovative IT tool to assess and manage cable status based on the Predictive maitance.The results of the project in the form of a prototype IT solution of SORAL will be implemented first and used by the business of ENERGA-OPERATOR SA (EPP).Reference_reference_programme_aids:SA.41471 (2015/X) _public:Article 25 of Commission Regulation (EC) No 651/2014 of 17 June 2014 declaring certain categories of aid compatible with the internal market in the application of Article 107 and 108 of the Treaty (OJ(OJ LEU L 187/1, 26.06.2014). (English)
    0 references

    Identifiers

    POIR.01.02.00-00-0250/17
    0 references