“Modernisation of Odrzański locks on the section in the management of Gliwice Gliwice – adaptation to the third class of the waterway” Phase II (Q85875)

From EU Knowledge Graph
Revision as of 09:10, 15 January 2024 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project Q85875 in Poland
Language Label Description Also known as
English
“Modernisation of Odrzański locks on the section in the management of Gliwice Gliwice – adaptation to the third class of the waterway” Phase II
Project Q85875 in Poland

    Statements

    0 references
    41,408,723.51 zloty
    0 references
    9,205,159.24 Euro
    13 January 2020
    0 references
    48,716,145.49 zloty
    0 references
    10,829,599.14 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 January 2016
    0 references
    31 December 2020
    0 references
    PAŃSTWOWE GOSPODARSTWO WODNE WODY POLSKIE
    0 references
    0 references

    50°18'4.0"N, 18°39'44.3"E
    0 references

    50°23'29.8"N, 18°36'39.2"E
    0 references

    50°21'34.9"N, 18°24'29.9"E
    0 references
    Projekt polega na wykoniu kompleksowych prac budowlanych prowadzących do modernizacji dwóch śluz na Kanale Gliwickim - Łabędy i Dzierżno. Wykonanie prac pozwoli na skrócenie okresu śluzowania na śluzie Łabędy o 7 minut, a na śkuzie Dzierżno o 10 minut. (Polish)
    0 references
    The project consists of the completion of complex construction works leading to the modernisation of two locks on the Gliwice Canal – the Elbe and Dzierżno. The completion of the works will reduce the locking period at the Swan mucus by 7 minutes, and on Śkuza Dzierżno by 10 minutes. (English)
    14 October 2020
    0 references
    Le projet consiste en l’achèvement de travaux de construction complexes menant à la modernisation de deux écluses sur le canal de Gliwice — Łabęda et Dzierżno. L’exécution des travaux permettra de raccourcir la période de verrouillage sur l’écluse de l’Elbe de 7 minutes, et sur la pression Dzierżno de 10 minutes. (French)
    30 November 2021
    0 references
    Das Projekt besteht aus der Fertigstellung komplexer Bauarbeiten, die zur Modernisierung zweier Schleusen am Gliwice-Kanal – Łabęda und Dzierżno – führen. Die Ausführung der Arbeiten ermöglicht es, die Verriegelungszeit auf der Elbeschleuse um 7 Minuten und auf der Squeeze Dzierżno um 10 Minuten zu verkürzen. (German)
    7 December 2021
    0 references
    Het project bestaat uit de voltooiing van complexe bouwwerken die leiden tot de modernisering van twee sluizen op het Gliwicekanaal — Łabęda en Dzierżno. De uitvoering van de werken maakt het mogelijk om de vergrendelingsperiode op het Elbe-slot met 7 minuten te verkorten en op de knijp Dzierżno met 10 minuten. (Dutch)
    16 December 2021
    0 references
    Il progetto consiste nel completamento di complessi lavori di costruzione che portano alla modernizzazione di due chiuse sul canale Gliwice — Łabęda e Dzierżno. L'esecuzione dei lavori permetterà di accorciare il periodo di chiusura sulla serratura dell'Elba di 7 minuti, e sulla spremuta Dzierżno di 10 minuti. (Italian)
    16 January 2022
    0 references
    El proyecto consiste en la finalización de obras de construcción complejas que conducen a la modernización de dos esclusas en el Canal de Gliwice — Łabęda y Dzierżno. La ejecución de las obras permitirá acortar el período de bloqueo en la cerradura del Elba en 7 minutos, y en la compresión Dzierżno en 10 minutos. (Spanish)
    19 January 2022
    0 references
    Projektet består i færdiggørelse af komplekse byggearbejder, der fører til modernisering af to sluser på Gliwice-kanalen — Łabęda og Dzierżno. Udførelsen af arbejderne vil gøre det muligt at forkorte låsetiden på Elben-låsen med 7 minutter, og på klemmen Dzierżno med 10 minutter. (Danish)
    26 July 2022
    0 references
    Το έργο συνίσταται στην ολοκλήρωση σύνθετων κατασκευαστικών εργασιών που οδήγησαν στον εκσυγχρονισμό δύο κλειδαριών στο κανάλι Gliwice — Łabęda και Dzierżno. Η εκτέλεση των εργασιών θα επιτρέψει τη συντόμευση της περιόδου κλειδώματος στην κλειδαριά του Έλβα κατά 7 λεπτά και στη συμπίεση κατά 10 λεπτά. (Greek)
    26 July 2022
    0 references
    Projekt se sastoji od završetka složenih građevinskih radova koji su doveli do modernizacije dviju brava na kanalu Gliwice – Łabęda i Dzierżno. Izvođenje radova omogućit će skratiti razdoblje zaključavanja na Elbe bravu za 7 minuta, a na stiskanje Dzierżno za 10 minuta. (Croatian)
    26 July 2022
    0 references
    Proiectul constă în finalizarea lucrărilor complexe de construcție care au condus la modernizarea a două ecluze pe canalul Gliwice – Łabęda și Dzierżno. Executarea lucrărilor va permite scurtarea perioadei de blocare pe încuietoarea Elba cu 7 minute, iar pe Dzierżno cu 10 minute. (Romanian)
    26 July 2022
    0 references
    Projekt pozostáva z dokončenia komplexných stavebných prác vedúcich k modernizácii dvoch plavebných komôr na kanáli Gliwice – Łabęda a Dzierżno. Vykonanie prác umožní skrátiť uzamykaciu dobu na zámku Labe o 7 minút a na stlačení Dzierżno o 10 minút. (Slovak)
    26 July 2022
    0 references
    Il-proġett jikkonsisti fit-tlestija ta’ xogħlijiet kumplessi ta’ kostruzzjoni li jwasslu għall-modernizzazzjoni ta’ żewġ serraturi fil-Kanal ta’ Gliwice — Łabęda u Dzierżno. L-eżekuzzjoni tax-xogħlijiet se tippermetti li jitqassar il-perjodu ta ‘qfil fuq il-lock Elbe b’7 minuti, u fuq il-kompressjoni Dzierżno b’10 minuti. (Maltese)
    26 July 2022
    0 references
    O projeto consiste na conclusão de obras complexas que conduziram à modernização de duas eclusas no Canal de Gliwice — Łabęda e Dzierżno. A execução das obras permitirá encurtar o período de bloqueio na fechadura do Elba em 7 minutos, e no aperto Dzierżno em 10 minutos. (Portuguese)
    26 July 2022
    0 references
    Hanke koostuu monimutkaisten rakennustöiden loppuun saattamisesta, jotka johtavat Gliwicen kanavan kahden lukon – Łabędan ja Dzierżnon – nykyaikaistamiseen. Töiden suorittamisella voidaan lyhentää lukitusaikaa Elbe-lukituksessa 7 minuuttia ja puristaa Dzierżno kymmenellä minuutilla. (Finnish)
    26 July 2022
    0 references
    Projekt obsega dokončanje kompleksnih gradbenih del, ki so privedle do posodobitve dveh zapornic na kanalu Gliwice – Łabęda in Dzierżno. Izvedba del bo omogočila skrajšanje obdobja zaklepanja na ključavnici Labe za 7 minut, na stisku Dzierżno pa za 10 minut. (Slovenian)
    26 July 2022
    0 references
    Projekt spočívá v dokončení komplexních stavebních prací vedoucích k modernizaci dvou zámků na kanálu Gliwice – Łabęda a Dzierżno. Provedení prací umožní zkrátit dobu zamykání na Labském zámku o 7 minut a na stisknutí Dzierżna o 10 minut. (Czech)
    26 July 2022
    0 references
    Projektą sudaro sudėtingi statybos darbai, kuriais modernizuojamos dvi Gliwice kanalo spynos – Łabęda ir Dzierżno. Darbų vykdymas leis sutrumpinti Elbės spynos fiksavimo laikotarpį 7 min., o „Dzierżno“ – 10 minučių. (Lithuanian)
    26 July 2022
    0 references
    Projekts ietver sarežģītu būvdarbu pabeigšanu, lai modernizētu divas slūžas Glivices kanālā — Łabęda un Dzierżno. Darbu izpilde ļaus saīsināt bloķēšanas laiku uz Elbas slēdzenes par 7 minūtēm, un uz saspiest Dzierżno par 10 minūtēm. (Latvian)
    26 July 2022
    0 references
    Проектът се състои в завършване на комплексни строителни работи, водещи до модернизация на две ключалки на канала Gliwice — Łabęda и Dzierżno. Изпълнението на работите ще позволи да се съкрати периодът на заключване на ключалката Elbe с 7 минути, а на стискането Dzierżno с 10 минути. (Bulgarian)
    26 July 2022
    0 references
    A projekt a Gliwice-csatorna két zsilipjének – Łabęda és Dzierżno – modernizálásához vezető komplex építési munkálatok befejezéséből áll. A munkálatok végrehajtása lehetővé teszi az Elba zár zárolási idejének lerövidítését 7 perccel, a Dzierżno szorításnál pedig 10 perccel. (Hungarian)
    26 July 2022
    0 references
    Is éard atá sa tionscadal ná oibreacha tógála casta a chríochnú as a dtiocfaidh nuachóiriú dhá ghlais ar Chanáil Gliwice — Łabęda agus Dzierżno. Ligfidh cur i gcrích na n-oibreacha an tréimhse glasála ar ghlas Elbe a ghiorrú faoi 7 nóiméad, agus ar an Dzierżno squeeze faoi 10 nóiméad. (Irish)
    26 July 2022
    0 references
    Projektet består av slutförandet av komplexa byggnadsarbeten som leder till modernisering av två slussar på Gliwicekanalen – Łabęda och Dzierżno. Genomförandet av arbetena kommer att göra det möjligt att förkorta låstiden på Elbe-låset med 7 minuter och på pressa Dzierżno med 10 minuter. (Swedish)
    26 July 2022
    0 references
    Projekt hõlmab keerukate ehitustööde lõpuleviimist, mis viivad Gliwice kanali kahe luku – Łabęda ja Dzierżno – moderniseerimiseni. Tööde teostamine võimaldab lühendada Elbe lukustusaega 7 minuti võrra ja suruda Dzierżno 10 minuti võrra. (Estonian)
    26 July 2022
    0 references
    WOJ.: ŚLĄSKIE, POW.: Gliwice
    0 references
    WOJ.: ŚLĄSKIE, POW.: gliwicki
    0 references
    13 December 2023
    0 references

    Identifiers

    POIS.03.02.00-00-0001/16
    0 references