(A19_067_2015_0670075_1268) INTEGRATED ADVANCED PLATFORM FOR DESIGN OF COMPLEX MACHINERY AND SYSTEMS (Q2167960)
Jump to navigation
Jump to search
Project in Italy financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | (A19_067_2015_0670075_1268) INTEGRATED ADVANCED PLATFORM FOR DESIGN OF COMPLEX MACHINERY AND SYSTEMS |
Project in Italy financed by DG Regio |
Statements
204,463.0 Euro
0 references
408,926.0 Euro
0 references
50.0 percent
0 references
1 July 2016
0 references
16 April 2019
0 references
9 August 2021
0 references
NUOVO PIGNONE TECNOLOGIE SRL
0 references
Q292633 (Deleted Item)
0 references
PROGETTARE SISTEMI DINAMICI MECCANICI COMPLESSI RICHIEDE L'INTEGRAZIONE DI VARIE DISCIPLINE INGEGNERISTICHE: FLUIDODINAMICA, TERMODINAMICA, MECCANICA CLASSICA, VIBRAZIONI E RUMORE, MATERIALI, RESISTENZA E PREDIZIONI DELLA VITA A FATICA, ANALISI ED ELABORAZIONE AVANZATA DI GROSSE MOLI DI DATI SPERIMENTALI ANCHE NON STRUTTURATI (BIG DATA) DERIVANTI DA BANCHI PROVA E DAL CAMPO. PERTANTO CONCORRONO ALLA FASE PROGETTUALE DIVERSI ATTORI INTERNI ED ESTERNI ALL'AZIENDA, CHE UTILIZZANO DIVERSI STRUMENTI E METODOLOGIE DI MODELLAZIONE E SIMULAZIONE ED INTERAGISCONO TRAMITE UNO SCAMBIO DI DATI ED INFORMAZIONI CHE PU? RISULTARE COMPLESSO E COSTITUIRE UN COLLO DI BOTTIGLIA SE NON GESTITO CON APPROCCIO INTEGRATO. I VARI STRUMENTI RICHIEDONO CONOSCENZE SPECIFICHE LATO UTENTE E POSSONO NECESSITARE RISORSE COMPUTAZIONALI E TEMPI DI CALCOLO CONSIDEREVOLI: QUESTO RENDE UN LORO IMPIEGO INTEGRATO DIFFICILE SIA NELLE FASI DI PROGETTO SVOLTE INTERNAMENTE ALLA AZIENDA CHE, A MAGGIOR RAGIONE, QUANDO SI INTEGRAN (Italian)
0 references
DESIGNING COMPLEX MECHANICAL DYNAMIC SYSTEMS REQUIRES THE INTEGRATION OF VARIOUS ENGINEERING DISCIPLINES: FLUID DYNAMIC, THERMODYNAMIC, MECHANICAL, VIBRATION AND NOISE, MATERIALS, FATIGUE PERFORMANCE AND CONDITION FOR THE FATIGUE, ANALYSIS AND ADVANCED PROCESSING OF LARGE PIECES OF EXPERIMENTAL DATA (BIG DATA) FROM TEST-BEDS AND FROM THE FIELD. THEREFORE, CONTRIBUTE TO THE DESIGN PHASE OF DIFFERENT ACTORS WITHIN AND OUTSIDE THE COMPANY, USING DIFFERENT MODELLING AND SIMULATION TOOLS AND METHODOLOGIES AND INTERACTING THROUGH AN EXCHANGE OF DATA AND INFORMATION THAT CAN BE USED? IT MUST BE COMPLEX AND CONSTITUTE A BOTTLE IF IT IS NOT MANAGED IN AN INTEGRATED MANNER. THE VARIOUS INSTRUMENTS REQUIRE SPECIFIC USER SIDE KNOWLEDGE AND MAY REQUIRE CONSIDERABLE COMPUTATIONAL RESOURCES AND COMPUTATION TIME: THIS MAKES IT DIFFICULT FOR THEM TO USE THEM IN BOTH PROJECT PHASES CARRIED OUT IN-HOUSE AND, A FORTIORI, WHEN INTEGN (English)
0 references
Identifiers
D56G15001380009
0 references