Construction of WSS infrastructure in the separate area served by Water Supply and Sewerage EOOD, Vidin (Q3832241)

From EU Knowledge Graph
Revision as of 21:13, 19 June 2023 by Admin (talk | contribs) (BatchIngestion)
Jump to navigation Jump to search
Project Q3832241 in Bulgaria
Language Label Description Also known as
English
Construction of WSS infrastructure in the separate area served by Water Supply and Sewerage EOOD, Vidin
Project Q3832241 in Bulgaria

    Statements

    0 references
    15,246,929.81 Bulgarian lev
    0 references
    7,775,934.2 Euro
    0 references
    19,722,445.83 Bulgarian lev
    0 references
    10,058,447.37 Euro
    0 references
    77.31 percent
    0 references
    5 September 2019
    0 references
    5 March 2024
    0 references
    "Водоснабдяване и канализация ЕООД" Видин
    0 references
    0 references
    0 references

    42°42'41.76"N, 23°17'31.56"E
    0 references
    Общо, за Агломерация Видин, се предвиждат следните мерки:-по компонент Водоснабдяване:•подмяна на съществуващия довеждащ водопровод ф900мм стомана с PVC_O тръби с диаметър Ф630mm, L = 10, 372 km с PN 12,5 atm;•подмяна на съществуващите две етернитови тръби ф536 mm и на съществуващите две стоманени тръби ф630 mm с ф500mm PVC_O тръби с PN 12,5 atm и обща дължина L = 4,149 km; L обща=14,521km.-по компонент Събиране на отпадъчни води се предвижда:•реконструкция на част от Главен Колектор II с яйцевиден профил 1520/2400 mm и 1120/2150 mm. Той ще бъде подменен с канал от GRP с ф1800mm с дължина L = 1,356km и участък с РР тръби 2xф1000mm с L =94m при преминаване под ж.п. линията; L обща=1,450 km.-по компонент Пречистване на отпадъчни води не са предвидени инвестиционни мерки. ПСОВ е в процес на изграждане. (Bulgarian)
    0 references
    In total, for the Vidin agglomeration, the following measures are foreseen:-by component Water supply: •replacement of the existing lead pipe ph900 mm with PVC_O pipes with diameter F630mm, L = 10.372 km with PN 12.5 atm;•replacement of the existing two etherite pipes f536 mm and of the existing two steel pipes f630 mm by f500 mm PVC_O pipes with PN 12.5 atm and total length L = 4.149 km; L total=14.521 km.-by component Wastewater collection is foreseen: •Reconstruction of a part of Master Collector II with an egg profile of 1520/2400 mm and 1120/2150 mm. It will be replaced by a GRP channel with f1800 mm with length L = 1.356 km and PP section 2x1000 mm with L =94 m when crossing the line; L total = 1.450 km.- by component Wastewater treatment no investment measures are foreseen. The WWTP is under construction. (English)
    2 December 2021
    0 references
    Au total, pour l’agglomération de Vidin, les mesures suivantes sont prévues:-par composant Approvisionnement en eau: • remplacement du tuyau de plomb existant ph900 mm par des tuyaux PVC_O de diamètre F630mm, L = 10,372 km par PN 12,5 atm;• remplacement des deux tuyaux en éthrite existants f536 mm et des deux tubes en acier f630 mm par f500 mm PVC_O avec PN 12,5 atm et longueur totale L = 4,149 km; L=14,521 km.-par composant La collecte des eaux usées est prévue: •Reconstruction d’une partie du Maître collecteur II avec un profil d’œuf de 1520/2400 mm et 1120/2150 mm. Il sera remplacé par un chenal GRP avec f1800 mm avec une longueur L = 1,356 km et une section PP 2x1000 mm avec L =94 m lors du franchissement de la ligne; L total = 1,450 km.- par composante Traitement des eaux usées Aucune mesure d’investissement n’est prévue. La station d’épuration est en cours de construction. (French)
    3 December 2021
    0 references
    Insgesamt sind für den Ballungsraum Vidin folgende Maßnahmen vorgesehen:-für Komponenten Wasserversorgung: • Ersatz des vorhandenen Bleirohres ph900 mm mit PVC_O-Rohren mit einem Durchmesser F630mm, L = 10,372 km mit PN 12,5 atm; • Ersatz der bestehenden zwei Etheritrohre f536 mm und der bestehenden zwei Stahlrohre f630 mm durch f500 mm PVC_O Rohre mit PN 12,5 atm und Gesamtlänge L = 4,49 km; L insgesamt=14,521 km.-für Komponenten Abwassersammlung ist vorgesehen: •Rekonstruktion eines Teils des Meistersammels II mit einem Eiprofil von 1520/2400 mm und 1120/2150 mm. Er wird durch einen GFK-Kanal mit f1800 mm mit Länge L = 1,356 km und PP-Abschnitt 2x1000 mm mit L =94 m beim Überqueren der Strecke ersetzt; L insgesamt = 1,450 km.- nach Komponenten Abwasserbehandlung sind keine Investitionsmaßnahmen vorgesehen. Das WWTP befindet sich im Aufbau. (German)
    4 December 2021
    0 references
    In totaal zijn voor de agglomeratie Vidin de volgende maatregelen gepland:-per component Watervoorziening: •vervanging van de bestaande loodpijp ph900 mm door PVC_O-buizen met een diameter F630mm, L = 10,372 km met PN 12,5 atm;•vervanging van de bestaande twee etherietbuizen f536 mm en van de bestaande twee stalen buizen f630 mm door f500 mm PVC_O-buizen met PN 12,5 atm en totale lengte L = 4,149 km; L totaal=14,521 km.-per component Afvalwaterinzameling is gepland: •Herbouw van een deel van Master Collector II met een eiprofiel van 1520/2400 mm en 1120/2150 mm. Het wordt vervangen door een GRP-kanaal met f1800 mm met lengte L = 1,356 km en PP-sectie 2x1000 mm met L = 94 m bij het overschrijden van de lijn; L totaal = 1,450 km.- per component Afvalwaterzuivering zijn geen investeringsmaatregelen voorzien. De RWZI is in aanbouw. (Dutch)
    10 December 2021
    0 references
    In totale, per l'agglomerato di Vidin, sono previste le seguenti misure:-per componente di approvvigionamento idrico: •sostituzione del tubo di piombo esistente ph900 mm con tubi in PVC_O con diametro F630mm, L = 10,372 km con PN 12,5 atm;• sostituzione dei due tubi di eterite esistenti f536 mm e dei due tubi in acciaio esistenti f630 mm per f500 mm con tubi PVC_O PN 12,5 atm e lunghezza totale L = 4,149 km; L totale=14,521 km.-per componente La raccolta delle acque reflue è prevista: •Ricostruzione di una parte di Master Collector II con un profilo uovo di 1520/2400 mm e 1120/2150 mm. Sarà sostituito da un canale GRP con f1800 mm con lunghezza L = 1,356 km e PP sezione 2x1000 mm con L =94 m all'atto dell'attraversamento della linea; L totale = 1,450 km.- per componente trattamento delle acque reflue non sono previste misure di investimento. Il WWTP è in costruzione. (Italian)
    13 January 2022
    0 references
    En total, para la aglomeración de Vidin, se prevén las siguientes medidas: -por componente Suministro de agua: • Sustitución del tubo de plomo existente ph900 mm por tubos PVC_O con diámetro F630mm, L = 10,372 km con PN 12,5 atm;•sustitución de los dos tubos de eterita existentes f536 mm y de los dos tubos de acero existentes f630 mm por f500 mm PVC_O con PN 12,5 atm y longitud total L = 4,49 km; L total=14,521 km.-por componente Se prevé la recogida de aguas residuales: •Reconstrucción de una parte del Master Collector II con un perfil de huevo de 1520/2400 mm y 1120/2150 mm. Se sustituirá por un canal GRP con f1800 mm con longitud L = 1,356 km y sección PP 2x1000 mm con L = 94 m al cruzar la línea; L total = 1,450 km.- por componente Tratamiento de aguas residuales no se prevén medidas de inversión. La EDAR está en construcción. (Spanish)
    14 January 2022
    0 references
    I alt forudses følgende foranstaltninger for byområdet Vidin:-for hver komponent Vandforsyning: •udskiftning af det eksisterende blyrør ph900 mm med PVC_O-rør med diameter F630 mm, L = 10,372 km med PN 12,5 atm • udskiftning af de eksisterende to etheritrør f536 mm og af de eksisterende to stålrør f630 mm med f500 mm PVC_O-rør med PN 12,5 atm og samlet længde L = 4,149 km; L i alt=14,521 km.-for hver komponent spildevandsopsamling er planlagt: •Genopbygning af en del af Master Collector II med en ægprofil på 1520/2400 mm og 1120/2150 mm. Den erstattes af en GRP-kanal med f1800 mm med længde L = 1,356 km og PP sektion 2x1000 mm med L =94 m ved passage af linjen L i alt = 1,450 km.- pr. komponent spildevandsrensning er ikke planlagt nogen investeringsforanstaltninger. Rensningsanlægget er under opførelse. (Danish)
    19 July 2022
    0 references
    Συνολικά, για τον οικισμό Vidin, προβλέπονται τα ακόλουθα μέτρα:-ανά συνιστώσα παροχή νερού: •αντικατάσταση του υπάρχοντος μολύβδινου σωλήνα ph900 mm με σωλήνες PVC_O διαμέτρου F630mm, L = 10,372 km με PN 12,5 atm·•αντικατάσταση των υφιστάμενων δύο αιθεριτικών σωλήνων f536 mm και των υφιστάμενων δύο χαλύβδινων σωλήνων f630 mm από σωλήνες PVC_O f500 mm με PN 12,5 atm και συνολικό μήκος L = 4,149 km· L total=14,521 km.-ανά συνιστώσα Η συλλογή λυμάτων προβλέπεται: •Ανακατασκευή τμήματος του κύριου συλλέκτη ΙΙ με προφίλ αυγών 1520/2400 mm και 1120/2150 mm. Θα αντικατασταθεί από κανάλι GRP με f1800 mm μήκους L = 1,356 km και τμήμα PP 2x1000 mm με L =94 m κατά τη διέλευση της γραμμής· L σύνολο = 1,450 km.- ανά συνιστώσα Επεξεργασία λυμάτων δεν προβλέπονται επενδυτικά μέτρα. Το WWTP είναι υπό κατασκευή. (Greek)
    19 July 2022
    0 references
    Ukupno, za aglomeraciju Vidin predviđene su sljedeće mjere: – po komponentama Opskrba vodom: •zamjena postojeće olovne cijevi ph900 mm PVC-O cijevi promjera F630mm, L = 10,372 km s PN 12,5 atm;• zamjena postojećih dviju eteritnih cijevi f536 mm i postojećih dviju čeličnih cijevi f630 mm f500 mm PVC_O cijevi s PN 12,5 atm i ukupne duljine L = 4,49 km; L ukupno = 14,521 km.-po komponenti je predviđeno prikupljanje otpadnih voda: •Rekonstrukcija dijela glavnog kolektora II s profilom jajašca 1520/2400 mm i 1120/2150 mm. Zamijenit će se GRP kanalom s f1800 mm duljine L = 1,356 km i PP presjekom 2x1000 mm s L = 94 m pri prelasku pruge; L ukupno = 1,450 km.- Pročišćavanje otpadnih voda po sastavnim dijelovima nisu predviđene mjere ulaganja. WWTP je u izgradnji. (Croatian)
    19 July 2022
    0 references
    În total, pentru aglomerarea Vidin, sunt prevăzute următoarele măsuri: •înlocuirea țevii de plumb existente ph900 mm cu țevi PVC_O cu diametrul F630mm, L = 10,372 km cu PN 12,5 atm;•înlocuirea celor două țevi etrite existente f536 mm și a celor două țevi de oțel existente f630 mm cu f500 mm țevi PVC_O cu PN 12,5 atm și lungimea totală L = 4,149 km; L total=14,521 km. – cu componentă de colectare a apelor uzate este prevăzută: • Reconstrucția unei părți a Master Collector II cu un profil de ou de 1520/2400 mm și 1120/2150 mm. Acesta va fi înlocuit cu un canal GRP cu f1800 mm cu lungime L = 1,356 km și PP secțiune 2x1000 mm cu L = 94 m la trecerea liniei; L total = 1,450 km.- pe componente de tratare a apelor uzate nu sunt prevăzute măsuri de investiții. WWTP este în construcție. (Romanian)
    19 July 2022
    0 references
    V prípade aglomerácie Vidin sa celkovo predpokladajú tieto opatrenia: – podľa zložky Dodávka vody: •výmena existujúcej olovenej rúrky ph900 mm rúrkami z PVC_O s priemerom F630 mm, L = 10,372 km s PN 12,5 atm;•výmena existujúcich dvoch éteritových rúr f536 mm a existujúcich dvoch oceľových rúr f630 mm f500 mm PVC_O rúrok s PN 12,5 atm a celkovou dĺžkou L = 4,149 km; L spolu = 14,521 km podľa jednotlivých zložiek sa predpokladá zber odpadových vôd: •Rekonštrukcia časti Master Collector II s vaječným profilom 1520/2400 mm a 1120/2150 mm. Nahradí sa kanálom GRP s dĺžkou f1800 mm s dĺžkou L = 1,356 km a PP úsekom 2x1000 mm s L = 94 m pri prekročení línie; L spolu = 1,450 km.- podľa zložiek čistenie odpadových vôd sa nepredpokladajú žiadne investičné opatrenia. ČOV je vo výstavbe. (Slovak)
    19 July 2022
    0 references
    B’kollox, għall-agglomerazzjoni ta’ Vidin, huma previsti l-miżuri li ġejjin:-skont il-komponent Provvista tal-ilma: •is-sostituzzjoni tal-pajp taċ-ċomb eżistenti ph900 mm b’pajpijiet PVC_O b’dijametru F630mm, L = 10.372 km b’PN 12.5 atm;•sostituzzjoni taż-żewġ pajpijiet eżistenti tal-eterit f536 mm u taż-żewġ pajpijiet eżistenti tal-azzar f630 mm b’pajpijiet f500 mm PVC_O b’PN 12.5 atm u tul totali L = 4.149 km; L total ta’=14.521 km.-skont il-komponent Il-ġbir tal-ilma mormi huwa previst: •Ir-rikostruzzjoni ta’ parti mill-Kolletturi tal-Master II bi profil tal-bajd ta’ 1520/2400 mm u 1120/2150 mm. Din se tiġi sostitwita minn kanal GRP b’f1800 mm b’tul L = 1.356 km u PP sezzjoni 2x1000 mm b’L = 94 m meta taqsam il-linja; L total = 1.450 km.- skont il-komponent It-trattament tal-ilma mormi ma huma previsti l-ebda miżuri ta’ investiment. Id-WWTP qed tinbena. (Maltese)
    19 July 2022
    0 references
    No total, para a aglomeração de Vidin, estão previstas as seguintes medidas:-por componente de abastecimento de água: •substituição do tubo de chumbo existente ph900 mm por tubos de PVC_O com diâmetro F630mm, L = 10,372 km com PN 12,5 atm;•substituição dos dois tubos de eterite existentes f536 mm e dos dois tubos de aço existentes f630 mm por tubos de PVC_O f500 mm com PN 12,5 atm e comprimento total L = 4,149 km; L total=14 521 km.-por componente A recolha de águas residuais está prevista: •Reconstrução de uma parte do coletor principal II com um perfil de ovo de 1520/2400 mm e 1120/2150 mm. Será substituído por um canal GRP com f1800 mm com comprimento L = 1,356 km e secção PP 2x1000 mm com L = 94 m ao atravessar a linha; L total = 1,450 km.- por componente Tratamento de águas residuais não estão previstas medidas de investimento. A ETAR está em construção. (Portuguese)
    19 July 2022
    0 references
    Vidinin taajaman osalta suunnitellaan yhteensä seuraavia toimenpiteitä: vesihuollon osa-alueittain: •nykyisen lyijyputken ph900 mm korvaaminen PVC_O-putkilla, joiden halkaisija on F630 mm, L = 10,372 km ja PN 12,5 atm; • nykyisten kahden eetiittiputken f536 mm ja nykyisten kahden teräsputken f630 mm korvaaminen f500 mm PVC_O-putkilla, joiden PN 12,5 atm ja kokonaispituus L = 4,149 km; L yhteensä = 14,521 km. – Osakohtaisesti Jäteveden keräys on suunniteltu: •Kunnostetaan osa Master Collector II:sta, jonka munaprofiili on 1520/2400 mm ja 1120/2150 mm. Se korvataan GRP-kanavalla, jonka pituus on f1800 mm ja pituus L = 1,356 km ja PP-osa 2x1000 mm, L = 94 m ylitettäessä linjaa; L yhteensä = 1 450 km.- osa-alueittain jäteveden käsittely ei ole suunnitteilla investointitoimenpiteitä. Jätevedenpuhdistamo on rakenteilla. (Finnish)
    19 July 2022
    0 references
    W odniesieniu do aglomeracji Vidin przewiduje się łącznie następujące środki: – w podziale na komponenty Zaopatrzenie w wodę: • wymiana istniejącej rury ołowiowej ph900 mm rur PVC_O o średnicy F630mm, L = 10,372 km z PN 12,5 atm;• wymiana istniejących dwóch rur eterytowych f536 mm i dwóch istniejących rur stalowych f630 mm na f500 mm PVC_O o PN 12,5 atm i długości całkowitej L = 4,149 km; L Total=14,521 km.--w podziale na komponent Przewiduje się odprowadzanie ścieków: • Przebudowa części Master Collector II o profilu jaj 1520/2400 mm i 1120/2150 mm. Zostanie zastąpiony kanałem GRP o długości f1800 mm o długości L = 1,356 km i odcinku PP 2x1000 mm przy przekraczaniu linii L =94 m; L ogółem = 1,450 km.- według komponentów Oczyszczanie ścieków nie przewiduje działań inwestycyjnych. Oczyszczalnia ścieków jest w budowie. (Polish)
    19 July 2022
    0 references
    Za aglomeracijo Vidin so predvideni naslednji ukrepi: po komponenti oskrba z vodo: •nadomestitev obstoječe svinčene cevi ph900 mm s PVC_O cevi s premerom F630mm, L = 10,372 km s PN 12,5 atm;•zamenjava obstoječih dveh eteritnih cevi f536 mm in obstoječih dveh jeklenih cevi f630 mm s f500 mm PVC_O cevi s PN 12,5 atm in skupno dolžino L = 4,149 km; L skupaj = 14 521 km.-po komponenti zbiranje odpadne vode je predvideno: •Obnova dela Master Collector II s profilom jajc 1520/2400 mm in 1120/2150 mm. Nadomeščen bo z GRP kanalom s f1800 mm z dolžino L = 1,356 km in PP odsekom 2x1000 mm z L = 94 m pri prečkanju črte; L skupaj = 1,450 km.- po komponenti Čiščenje odpadne vode ni predvidenih naložbenih ukrepov. Čistilna naprava je v gradnji. (Slovenian)
    19 July 2022
    0 references
    Celkem se pro aglomeraci Vidin předpokládají tato opatření:-podle složky Dodávky vody: •výměna stávajících olověných trubek ph900 mm za trubky PVC_O o průměru F630mm, L = 10,372 km s PN 12,5 atm; • výměna stávajících dvou etheritových trubek f536 mm a stávajících dvou ocelových trubek f630 mm f500 mm PVC_O trubek s PN 12,5 atm a celkovou délkou L = 4,149 km; L celkem=14,521 km-odběr odpadních vod se předpokládá: •Rekonstrukce části Master Collector II s profilem vajec 1520/2400 mm a 1120/2150 mm. Bude nahrazena GRP kanálem f1800 mm o délce L = 1,356 km a PP úsekem 2x1000 mm s L = 94 m při překračování čáry; L celkem = 1,450 km.- podle složek Čištění odpadních vod se nepředpokládají žádná investiční opatření. ČOV je ve výstavbě. (Czech)
    19 July 2022
    0 references
    Iš viso Vidino aglomeracijoje numatytos šios priemonės:-pagal sudedamąją dalį Vandens tiekimas: • esamo švino vamzdžio ph900 mm pakeitimas PVC_O vamzdžiais, kurių skersmuo F630mm, L = 10,372 km su PN 12,5 atm;•esamų dviejų eterinių vamzdžių f536 mm ir esamų dviejų plieninių vamzdžių f630 mm pakeitimas f500 mm PVC_O vamzdžiais su PN 12,5 atm ir bendras ilgis L = 4,149 km; L iš viso=14,521 km pagal komponentus numatytas nuotekų surinkimas: •„Master Collector II“ dalies, kurios kiaušinio profilis yra 1520/2400 mm ir 1120/2150 mm, rekonstrukcija. Per liniją kertamas GRP kanalas su f1800 mm ilgio L = 1,356 km ir PP skyrius 2x1000 mm su L = 94 m; L iš viso = 1 450 km.- pagal komponentą Nuotekų valymas nenumatytos jokios investicinės priemonės. Statomas WWTP. (Lithuanian)
    19 July 2022
    0 references
    Kopumā Vidinas aglomerācijā ir paredzēti šādi pasākumi:-pa komponentiem Ūdensapgāde: • esošās svina caurules ph900 mm aizstāšana ar PVC_O caurulēm, kuru diametrs ir F630mm, L = 10,372 km ar PN 12,5 atm;•esošo divu ēterīta cauruļu f536 mm un esošo divu tērauda cauruļu f630 mm ar f500 mm PVC_O caurulēm ar PN 12,5 atm un kopējo garumu L = 4,149 km aizstāšana; L kopā = 14 521 km — pa komponentiem notekūdeņu savākšana ir paredzēta: •Galvenā kolekcionāra II daļas rekonstrukcija ar olu profilu 1520/2400 mm un 1120/2150 mm. To aizstās ar GRP kanālu ar f1800 mm garumu L = 1,356 km un PP sekciju 2x1000 mm ar L =94 m, šķērsojot līniju; L kopā = 1,450 km.- pa komponentiem Notekūdeņu attīrīšanai nav paredzēti ieguldījumu pasākumi. Notekūdeņu attīrīšanas iekārta tiek būvēta. (Latvian)
    19 July 2022
    0 references
    A Vidin agglomerációra vonatkozóan összesen a következő intézkedések vannak előirányozva: – komponensenként Vízellátás: •a meglévő ph900 mm-es, F630 mm átmérőjű PVC_O csövek cseréje, L = 10,372 km, PN 12,5 atm; •a meglévő két éterit cső f536 mm és a meglévő két f630 mm-es acélcső cseréje f500 mm PVC_O csövekkel, amelyek PN 12,5 atm és teljes hossza L = 4,149 km; L összesen = 14 521 km. – komponensenként Szennyvízgyűjtés: •A Master Collector II egy részének átalakítása 1520/2400 mm és 1120/2150 mm-es tojásprofillal. A vonal átlépésekor egy f1800 mm hosszú, L = 1,356 km hosszúságú GRP-csatorna és 2x1000 mm PP szakasz, L =94 m; L összesen = 1,450 km.- komponensenként Szennyvízkezelés nincs előirányozva beruházási intézkedésre. A szennyvíztisztító telep építése folyamatban van. (Hungarian)
    19 July 2022
    0 references
    Ar an iomlán, maidir leis an gceirtleán Vidin, foráiltear do na bearta seo a leanas:-ar chomhchuid soláthar uisce: •athsholáthar an ph900 mm píopa luaidhe atá ann cheana féin le píopaí PVC_O le trastomhas F630mm, L = 10.372 km le PN 12.5 atm;• athsholáthar an dá phíopa éitearacha atá ann cheana féin f536 mm agus an dá phíopa cruach atá ann cheana féin f630 mm le f500 mm PVC_O píopaí le PN 12.5 atm agus fad iomlán L = 4.149 km; L iomlán=14.521 km.-de réir comhpháirte Tá sé beartaithe fuíolluisce a bhailiú: •Atógáil cuid de Mháistir-Bhailitheoir II le próifíl uibhe 1520/2400 mm agus 1120/2150 mm. Cuirfear cainéal GRP ina ionad le f1800 mm le fad L = 1.356 km agus alt PP 2x1000 mm le L =94 m agus an líne á trasnú; L iomlán = 1.450 km.- cóireáil fuíolluisce de réir comhpháirte nach bhforáiltear d’aon bhearta infheistíochta. Tá an WWTP á thógáil. (Irish)
    19 July 2022
    0 references
    För tätorten Vidin planeras totalt följande åtgärder:-per komponent vattenförsörjning: •byte av det befintliga blyröret ph900 mm med PVC_O-rör med diametern F630mm, L = 10,372 km med PN 12,5 atm,•ersättning av de befintliga två eteritrören f536 mm och av de befintliga två stålrören f630 mm med f500 mm PVC_O-rör med PN 12,5 atm och total längd L = 4,149 km. L totalt=14,521 km.-per komponent Avloppsvattenuppsamling planeras: • Återuppbyggnad av en del av Master Collector II med en äggprofil på 1520/2400 mm och 1120/2150 mm. Den kommer att ersättas av en GRP-kanal med f1800 mm med längd L = 1,356 km och PP-avsnitt 2x1000 mm med L =94 m när linjen korsas. L totalt = 1,450 km.- per komponent för rening av avloppsvatten planeras inga investeringsåtgärder. Avloppsreningsverket är under uppbyggnad. (Swedish)
    19 July 2022
    0 references
    Kokku on Vidini linnastu jaoks ette nähtud järgmised meetmed: •olemasoleva pliitoru ph900 mm asendamine PVC_O torudega, mille läbimõõt on F630mm, L = 10,372 km PN 12,5 atm;• olemasoleva kahe eeterliku toru f536 mm ja kahe olemasoleva terastoru f630 mm f630 mm asendamine f500 mm PVC_O torudega, mille PN 12,5 atm ja kogupikkus L = 4,49 km; L kokku=14,521 km.-osade kaupa reovee kogumine on ette nähtud: • Master Collector II osa, mille munaprofiil on 1520/2400 mm ja 1120/2150 mm, rekonstrueerimine. See asendatakse GRP kanaliga, mille pikkus on L = 1,356 mm, ja PP lõiguga 2x1000 mm ja L = 94 m joone ületamisel; L kokku = 1 450 km- komponentide kaupa reovee puhastamine ei ole investeerimismeetmeid ette nähtud. Reoveepuhasti on ehitamisel. (Estonian)
    19 July 2022
    0 references
    гр.Видин
    0 references
    0 references

    Identifiers

    BG16M1OP002-1.016-0006
    0 references