URGENT WORK TO SECURE, RESTORE AND CONSOLIDATE AS A RESULT OF BANK FAILURES AND MOVEMENTS IN THE 16 SP IN THE MUNICIPALITY OF TORRACA — URGENT CIVIL PROTECTION ASSISTANCE — BENEFICIARY PROVINCE OF SALERNO (Q2023227)

From EU Knowledge Graph
Revision as of 04:21, 24 March 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Italy financed by DG Regio
Language Label Description Also known as
English
URGENT WORK TO SECURE, RESTORE AND CONSOLIDATE AS A RESULT OF BANK FAILURES AND MOVEMENTS IN THE 16 SP IN THE MUNICIPALITY OF TORRACA — URGENT CIVIL PROTECTION ASSISTANCE — BENEFICIARY PROVINCE OF SALERNO
Project in Italy financed by DG Regio

    Statements

    0 references
    375,000.0 Euro
    0 references
    500,000.0 Euro
    0 references
    75.0 percent
    0 references
    1 June 2014
    0 references
    10 August 2018
    0 references
    PROVINCIA DI SALERNO
    0 references
    0 references

    40°6'45.11"N, 15°38'6.86"E
    0 references
    IL PROGETTO PREVEDE LA REALIZZAZIONE DI N. 2 PALIFICATE IN PALI TRIVELLATI F 800 IN CEMENTO ARMATO, INTERASSE 100 CM E PROFONDITà COMPLESSIVA DI 16 METRI, CON CORDOLO SOMMITALE DI CORONAMENTO 120X100 CM. NELLO SPECIFICO LE OPERE STRUTTURALI SI SVILUPPERANNO RISPETTIVAMENTE: INTERVENTO 1 PER 130,00 METRI LINEARI E INTERVENTO 2 PER 30,00 METRI LINEARI. LA SEZIONE STRADALE RIPRISTINATA SARà COMPOSTA DA DUE CORSIE (UNA PER CIASCUN SENSO DI MARCIA) CON SISTEMA DI RACCOLTA DELLE ACQUE METEORICHE MEDIANTE ZANELLA IN CLS SUL CIGLIO STRADALE FINO AL RAGGIUNGIMENTO DELL'EQUILIBRIO ORIGINARIO DI RUSCELLAMENTO SUPERFICIALE. LUNGO IL MARGINE PROSPICIENTE L'AREA DI INTERVENTO SARà ISTALLATO IDONEO GUARD-RAIL TIPO H2 BORDO LATERALE. (Italian)
    0 references
    THE PROJECT INVOLVES THE CONSTRUCTION OF 2 N. 800 ON POLES WITH 100 CM OF REINFORCED CONCRETE, A DISTANCE BETWEEN 120 CM AND A TOTAL OF 16 METRES, WITH A TOTAL OF X100 CM CORM. SPECIFICALLY, STRUCTURAL WORKS WILL DEVELOP: INTERVENTION 1 PER 130,00 LINEAR METRES AND INTERVENTION 2 PER 30,00 LINEAR METRES. THE REHABILITATED ROAD SECTION WILL CONSIST OF TWO LANES (ONE FOR EACH DIRECTION), WITH A RAINWATER COLLECTION SYSTEM VIA ZANELLA ON THE ROAD TO THE ROAD TO THE SURFACE OF THE ROAD TO THE ORIGINAL SURFACE RUN-OFF BALANCE. THE AREA OF INTERVENTION WILL BE PLACED ON THE SIDE OF THE SIDE OF THE SIDE OF THE SIDE H2 SIDE. (English)
    0 references

    Identifiers

    H19J13000730006
    0 references