Intelligent network construction in Kujawsko-Pomorskie Voivodship (OD Bydgoszcz) through modernisation and reconstruction of lines and stations of SN and nn, automation of lines and stations as a result of remote control and power protection automation, including short-circuit current flow indicators (Q84757)

From EU Knowledge Graph
Revision as of 17:11, 24 May 2023 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project Q84757 in Poland
Language Label Description Also known as
English
Intelligent network construction in Kujawsko-Pomorskie Voivodship (OD Bydgoszcz) through modernisation and reconstruction of lines and stations of SN and nn, automation of lines and stations as a result of remote control and power protection automation, including short-circuit current flow indicators
Project Q84757 in Poland

    Statements

    0 references
    5,926,121.18 zloty
    0 references
    1,317,376.74 Euro
    13 January 2020
    0 references
    9,000,000.0 zloty
    0 references
    2,000,700.0 Euro
    13 January 2020
    0 references
    65.85 percent
    0 references
    2 January 2017
    0 references
    31 December 2022
    0 references
    ENEA OPERATOR SP. Z O.O.
    0 references
    0 references
    0 references

    53°11'31.78"N, 17°49'31.80"E
    0 references
    Projekt zakłada budowę sieci inteligentnej poprzez modernizację i przebudowę: 1) zasilania Gminy Dąbrowa Chełmińska realizowanego przez budowę nowego przejścia przez rzekę Wisłę z nawiązaniem do istniejących linii SN Kotomierz wyprowadzonej z GPZ Fordon p. 36 i linii SN Ostromecko wyprowadzonej z GPZ Fordon p.20 2) linii SN Sicienko wyprowadzonej z GPZ Osowa Góra p. 22 poprzez zwiększenie przekroju toru głównego linii SN wraz z zastosowaniem zdalnego sterowania i elektroenergetycznej automatyki zabezpieczeniowej, w tym wskaźników przepływu prądów zwarciowych oraz zabudową u odbiorców układów pomiarowych umożliwiających zarządzanie energią przez odbiorcę na terenie powiatu bydgoskiego w województwie kujawsko-pomorskim, w celu umożliwienia wprowadzenia zautomatyzowanej identyfikacji uszkodzeń wraz z pełną rekonfiguracją przywrócenia zasilania odbiorcom. (Polish)
    0 references
    The project involves the construction of an intelligent network through modernisation and reconstruction: 1) Power supply of Dąbrowa Chełmińska commune implemented by the construction of a new passage through the river Vistula with reference to the existing line SN Kotometer derived from the GPZ Fordon p. 36 and line SN Ostromecko derived from the GPZ Fordon p.20 2) line SN of the power supply of Sicienko led out from GPZ Osowa Góra p. 22 by increasing the cross-section of the main track of the SN line together with the use of remote control and electric power (English)
    14 October 2020
    0 references
    Le projet suppose la construction d’un réseau intelligent par la modernisation et la reconstruction: 1) power supply of the municipality of Dąbrowa Chełmińska implemented by the construction of a new passage through the Vistula River with reference to the existing line SN Kotomierz derived from GPZ Fordon p. 36 and line SN Ostromecko exited from GPZ Fordon p. 20 2) SN Sicienko line exited from GPZ Osowa Góra p. 22 by increasing the cross-section of the main track of the SN line together with the use of remote control and electrical security automation, including indicators of the flow of short-circuit currents, and the installation of measurement systems enabling energy management by the recipient in the area of the district of Bydgoszcz, in order to restore the power supply in order to restore the power supply in order to restore the power supply in order to restore the reservoir in order to restore the power of the reservoir in order to restore the power supply from the reservoir, in order to restore the power to the reservoir in order to restore the power in order to restore the power supply to the reservoir, in order to restore the power supply in order to restore the power supply in order to restore the power supply in order to restore the power from the reservoir, in order to restore the power supply from the reservoir, in order to restore the power supply from the area of the district of Dąbrowa Chełmińska, which is implemented by the construction of a new passage through the Vistula River with reference to the existing line of SN Kotomierz derived from GPZ Fordon p. 36 and the SN Ostromecko line derived from GPZ Fordon p. 20 2) SN Sicienko line taken from the GPZ Osowa Góra p. 22 by increasing the cross-section of the main line of the SN line together with the application of remote control and power automation of the protection, including indicators of the flow of short-circues currents, and the installation of measurement systems enabling energy management by the recipient in the area of the district by means of a complete identification of the reconditioning in order to restore the power in order to restore the power supply in order to restore the power supply in order to restore the power in order to restore the power in order to restore the power in order to restore the power in order to restore the power in order to restore the power from the reservoir in order to restore the power from the reservories, to enable the installation of the energy management by the consignee on the territory of the district by means of (French)
    30 November 2021
    0 references
    Das Projekt übernimmt den Bau eines Smart Grids durch Modernisierung und Umbau: 1) power supply of the municipality of Dąbrowa Chełmińska implemented by the construction of a new passage through the Vistula River with reference to the existing line SN Kotomierz derived from GPZ Fordon p. 36 and line SN Ostromecko exited from GPZ Fordon p. 20 2) SN Sicienko line exited from GPZ Osowa Góra p. 22 by increasing the cross-section of the main track of the SN line together with the use of remote control and electrical security automation, including indicators of the flow of short-circuit currents, and the installation of measurement systems enabling energy management by the recipient in the area of the district of Bydgoszcz, in order to restore the power supply in order to restore the power supply in order to restore the power supply in order to restore the reservoir in order to restore the power of the reservoir in order to restore the power supply from the reservoir, in order to restore the power to the reservoir in order to restore the power in order to restore the power supply to the reservoir, in order to restore the power supply in order to restore the power supply in order to restore the power supply in order to restore the power from the reservoir, in order to restore the power supply from the reservoir, in order to restore the power supply from the area of the district of Dąbrowa Chełmińska, which is implemented by the construction of a new passage through the Vistula River with reference to the existing line of SN Kotomierz derived from GPZ Fordon p. 36 and the SN Ostromecko line derived from GPZ Fordon p. 20 2) SN Sicienko line taken from the GPZ Osowa Góra p. 22 by increasing the cross-section of the main line of the SN line together with the application of remote control and power automation of the protection, including indicators of the flow of short-circues currents, and the installation of measurement systems enabling energy management by the recipient in the area of the district by means of a complete identification of the reconditioning in order to restore the power in order to restore the power supply in order to restore the power supply in order to restore the power in order to restore the power in order to restore the power in order to restore the power in order to restore the power in order to restore the power from the reservoir in order to restore the power from the reservories, to enable the installation of the energy management by the consignee on the territory of the district by means of (German)
    7 December 2021
    0 references
    Het project gaat uit van de aanleg van een slim netwerk door modernisering en wederopbouw: 1) power supply of the municipality of Dąbrowa Chełmińska implemented by the construction of a new passage through the Vistula River with reference to the existing line SN Kotomierz derived from GPZ Fordon p. 36 and line SN Ostromecko exited from GPZ Fordon p. 20 2) SN Sicienko line exited from GPZ Osowa Góra p. 22 by increasing the cross-section of the main track of the SN line together with the use of remote control and electrical security automation, including indicators of the flow of short-circuit currents, and the installation of measurement systems enabling energy management by the recipient in the area of the district of Bydgoszcz, in order to restore the power supply in order to restore the power supply in order to restore the power supply in order to restore the reservoir in order to restore the power of the reservoir in order to restore the power supply from the reservoir, in order to restore the power to the reservoir in order to restore the power in order to restore the power supply to the reservoir, in order to restore the power supply in order to restore the power supply in order to restore the power supply in order to restore the power from the reservoir, in order to restore the power supply from the reservoir, in order to restore the power supply from the area of the district of Dąbrowa Chełmińska, which is implemented by the construction of a new passage through the Vistula River with reference to the existing line of SN Kotomierz derived from GPZ Fordon p. 36 and the SN Ostromecko line derived from GPZ Fordon p. 20 2) SN Sicienko line taken from the GPZ Osowa Góra p. 22 by increasing the cross-section of the main line of the SN line together with the application of remote control and power automation of the protection, including indicators of the flow of short-circues currents, and the installation of measurement systems enabling energy management by the recipient in the area of the district by means of a complete identification of the reconditioning in order to restore the power in order to restore the power supply in order to restore the power supply in order to restore the power in order to restore the power in order to restore the power in order to restore the power in order to restore the power in order to restore the power from the reservoir in order to restore the power from the reservories, to enable the installation of the energy management by the consignee on the territory of the district by means of (Dutch)
    16 December 2021
    0 references
    Il progetto prevede la costruzione di una smart grid attraverso l'ammodernamento e la ricostruzione: 1) power supply of the municipality of Dąbrowa Chełmińska implemented by the construction of a new passage through the Vistula River with reference to the existing line SN Kotomierz derived from GPZ Fordon p. 36 and line SN Ostromecko exited from GPZ Fordon p. 20 2) SN Sicienko line exited from GPZ Osowa Góra p. 22 by increasing the cross-section of the main track of the SN line together with the use of remote control and electrical security automation, including indicators of the flow of short-circuit currents, and the installation of measurement systems enabling energy management by the recipient in the area of the district of Bydgoszcz, in order to restore the power supply in order to restore the power supply in order to restore the power supply in order to restore the reservoir in order to restore the power of the reservoir in order to restore the power supply from the reservoir, in order to restore the power to the reservoir in order to restore the power in order to restore the power supply to the reservoir, in order to restore the power supply in order to restore the power supply in order to restore the power supply in order to restore the power from the reservoir, in order to restore the power supply from the reservoir, in order to restore the power supply from the area of the district of Dąbrowa Chełmińska, which is implemented by the construction of a new passage through the Vistula River with reference to the existing line of SN Kotomierz derived from GPZ Fordon p. 36 and the SN Ostromecko line derived from GPZ Fordon p. 20 2) SN Sicienko line taken from the GPZ Osowa Góra p. 22 by increasing the cross-section of the main line of the SN line together with the application of remote control and power automation of the protection, including indicators of the flow of short-circues currents, and the installation of measurement systems enabling energy management by the recipient in the area of the district by means of a complete identification of the reconditioning in order to restore the power in order to restore the power supply in order to restore the power supply in order to restore the power in order to restore the power in order to restore the power in order to restore the power in order to restore the power in order to restore the power from the reservoir in order to restore the power from the reservories, to enable the installation of the energy management by the consignee on the territory of the district by means of (Italian)
    16 January 2022
    0 references
    El proyecto asume la construcción de una red inteligente a través de la modernización y reconstrucción: 1) power supply of the municipality of Dąbrowa Chełmińska implemented by the construction of a new passage through the Vistula River with reference to the existing line SN Kotomierz derived from GPZ Fordon p. 36 and line SN Ostromecko exited from GPZ Fordon p. 20 2) SN Sicienko line exited from GPZ Osowa Góra p. 22 by increasing the cross-section of the main track of the SN line together with the use of remote control and electrical security automation, including indicators of the flow of short-circuit currents, and the installation of measurement systems enabling energy management by the recipient in the area of the district of Bydgoszcz, in order to restore the power supply in order to restore the power supply in order to restore the power supply in order to restore the reservoir in order to restore the power of the reservoir in order to restore the power supply from the reservoir, in order to restore the power to the reservoir in order to restore the power in order to restore the power supply to the reservoir, in order to restore the power supply in order to restore the power supply in order to restore the power supply in order to restore the power from the reservoir, in order to restore the power supply from the reservoir, in order to restore the power supply from the area of the district of Dąbrowa Chełmińska, which is implemented by the construction of a new passage through the Vistula River with reference to the existing line of SN Kotomierz derived from GPZ Fordon p. 36 and the SN Ostromecko line derived from GPZ Fordon p. 20 2) SN Sicienko line taken from the GPZ Osowa Góra p. 22 by increasing the cross-section of the main line of the SN line together with the application of remote control and power automation of the protection, including indicators of the flow of short-circues currents, and the installation of measurement systems enabling energy management by the recipient in the area of the district by means of a complete identification of the reconditioning in order to restore the power in order to restore the power supply in order to restore the power supply in order to restore the power in order to restore the power in order to restore the power in order to restore the power in order to restore the power in order to restore the power from the reservoir in order to restore the power from the reservories, to enable the installation of the energy management by the consignee on the territory of the district by means of (Spanish)
    19 January 2022
    0 references
    Projekt eeldab aruka võrgu ehitamist moderniseerimise ja rekonstrueerimise kaudu: 1) power supply of the municipality of Dąbrowa Chełmińska implemented by the construction of a new passage through the Vistula River with reference to the existing line SN Kotomierz derived from GPZ Fordon p. 36 and line SN Ostromecko exited from GPZ Fordon p. 20 2) SN Sicienko line exited from GPZ Osowa Góra p. 22 by increasing the cross-section of the main track of the SN line together with the use of remote control and electrical security automation, including indicators of the flow of short-circuit currents, and the installation of measurement systems enabling energy management by the recipient in the area of the district of Bydgoszcz, in order to restore the power supply in order to restore the power supply in order to restore the power supply in order to restore the reservoir in order to restore the power of the reservoir in order to restore the power supply from the reservoir, in order to restore the power to the reservoir in order to restore the power in order to restore the power supply to the reservoir, in order to restore the power supply in order to restore the power supply in order to restore the power supply in order to restore the power from the reservoir, in order to restore the power supply from the reservoir, in order to restore the power supply from the area of the district of Dąbrowa Chełmińska, which is implemented by the construction of a new passage through the Vistula River with reference to the existing line of SN Kotomierz derived from GPZ Fordon p. 36 and the SN Ostromecko line derived from GPZ Fordon p. 20 2) SN Sicienko line taken from the GPZ Osowa Góra p. 22 by increasing the cross-section of the main line of the SN line together with the application of remote control and power automation of the protection, including indicators of the flow of short-circues currents, and the installation of measurement systems enabling energy management by the recipient in the area of the district by means of a complete identification of the reconditioning in order to restore the power in order to restore the power supply in order to restore the power supply in order to restore the power in order to restore the power in order to restore the power in order to restore the power in order to restore the power in order to restore the power from the reservoir in order to restore the power from the reservories, to enable the installation of the energy management by the consignee on the territory of the district by means of (Estonian)
    13 August 2022
    0 references
    Įgyvendinant projektą numatoma, kad modernizuojant ir rekonstruojant bus kuriamas pažangusis tinklas: 1) power supply of the municipality of Dąbrowa Chełmińska implemented by the construction of a new passage through the Vistula River with reference to the existing line SN Kotomierz derived from GPZ Fordon p. 36 and line SN Ostromecko exited from GPZ Fordon p. 20 2) SN Sicienko line exited from GPZ Osowa Góra p. 22 by increasing the cross-section of the main track of the SN line together with the use of remote control and electrical security automation, including indicators of the flow of short-circuit currents, and the installation of measurement systems enabling energy management by the recipient in the area of the district of Bydgoszcz, in order to restore the power supply in order to restore the power supply in order to restore the power supply in order to restore the reservoir in order to restore the power of the reservoir in order to restore the power supply from the reservoir, in order to restore the power to the reservoir in order to restore the power in order to restore the power supply to the reservoir, in order to restore the power supply in order to restore the power supply in order to restore the power supply in order to restore the power from the reservoir, in order to restore the power supply from the reservoir, in order to restore the power supply from the area of the district of Dąbrowa Chełmińska, which is implemented by the construction of a new passage through the Vistula River with reference to the existing line of SN Kotomierz derived from GPZ Fordon p. 36 and the SN Ostromecko line derived from GPZ Fordon p. 20 2) SN Sicienko line taken from the GPZ Osowa Góra p. 22 by increasing the cross-section of the main line of the SN line together with the application of remote control and power automation of the protection, including indicators of the flow of short-circues currents, and the installation of measurement systems enabling energy management by the recipient in the area of the district by means of a complete identification of the reconditioning in order to restore the power in order to restore the power supply in order to restore the power supply in order to restore the power in order to restore the power in order to restore the power in order to restore the power in order to restore the power in order to restore the power from the reservoir in order to restore the power from the reservories, to enable the installation of the energy management by the consignee on the territory of the district by means of (Lithuanian)
    13 August 2022
    0 references
    Projekt podrazumijeva izgradnju pametne mreže modernizacijom i rekonstrukcijom: 1) power supply of the municipality of Dąbrowa Chełmińska implemented by the construction of a new passage through the Vistula River with reference to the existing line SN Kotomierz derived from GPZ Fordon p. 36 and line SN Ostromecko exited from GPZ Fordon p. 20 2) SN Sicienko line exited from GPZ Osowa Góra p. 22 by increasing the cross-section of the main track of the SN line together with the use of remote control and electrical security automation, including indicators of the flow of short-circuit currents, and the installation of measurement systems enabling energy management by the recipient in the area of the district of Bydgoszcz, in order to restore the power supply in order to restore the power supply in order to restore the power supply in order to restore the reservoir in order to restore the power of the reservoir in order to restore the power supply from the reservoir, in order to restore the power to the reservoir in order to restore the power in order to restore the power supply to the reservoir, in order to restore the power supply in order to restore the power supply in order to restore the power supply in order to restore the power from the reservoir, in order to restore the power supply from the reservoir, in order to restore the power supply from the area of the district of Dąbrowa Chełmińska, which is implemented by the construction of a new passage through the Vistula River with reference to the existing line of SN Kotomierz derived from GPZ Fordon p. 36 and the SN Ostromecko line derived from GPZ Fordon p. 20 2) SN Sicienko line taken from the GPZ Osowa Góra p. 22 by increasing the cross-section of the main line of the SN line together with the application of remote control and power automation of the protection, including indicators of the flow of short-circues currents, and the installation of measurement systems enabling energy management by the recipient in the area of the district by means of a complete identification of the reconditioning in order to restore the power in order to restore the power supply in order to restore the power supply in order to restore the power in order to restore the power in order to restore the power in order to restore the power in order to restore the power in order to restore the power from the reservoir in order to restore the power from the reservories, to enable the installation of the energy management by the consignee on the territory of the district by means of (Croatian)
    13 August 2022
    0 references
    Το έργο προϋποθέτει την κατασκευή ενός έξυπνου δικτύου μέσω εκσυγχρονισμού και ανασυγκρότησης: 1) power supply of the municipality of Dąbrowa Chełmińska implemented by the construction of a new passage through the Vistula River with reference to the existing line SN Kotomierz derived from GPZ Fordon p. 36 and line SN Ostromecko exited from GPZ Fordon p. 20 2) SN Sicienko line exited from GPZ Osowa Góra p. 22 by increasing the cross-section of the main track of the SN line together with the use of remote control and electrical security automation, including indicators of the flow of short-circuit currents, and the installation of measurement systems enabling energy management by the recipient in the area of the district of Bydgoszcz, in order to restore the power supply in order to restore the power supply in order to restore the power supply in order to restore the reservoir in order to restore the power of the reservoir in order to restore the power supply from the reservoir, in order to restore the power to the reservoir in order to restore the power in order to restore the power supply to the reservoir, in order to restore the power supply in order to restore the power supply in order to restore the power supply in order to restore the power from the reservoir, in order to restore the power supply from the reservoir, in order to restore the power supply from the area of the district of Dąbrowa Chełmińska, which is implemented by the construction of a new passage through the Vistula River with reference to the existing line of SN Kotomierz derived from GPZ Fordon p. 36 and the SN Ostromecko line derived from GPZ Fordon p. 20 2) SN Sicienko line taken from the GPZ Osowa Góra p. 22 by increasing the cross-section of the main line of the SN line together with the application of remote control and power automation of the protection, including indicators of the flow of short-circues currents, and the installation of measurement systems enabling energy management by the recipient in the area of the district by means of a complete identification of the reconditioning in order to restore the power in order to restore the power supply in order to restore the power supply in order to restore the power in order to restore the power in order to restore the power in order to restore the power in order to restore the power in order to restore the power from the reservoir in order to restore the power from the reservories, to enable the installation of the energy management by the consignee on the territory of the district by means of (Greek)
    13 August 2022
    0 references
    Projekt predpokladá výstavbu inteligentnej siete prostredníctvom modernizácie a rekonštrukcie: 1) power supply of the municipality of Dąbrowa Chełmińska implemented by the construction of a new passage through the Vistula River with reference to the existing line SN Kotomierz derived from GPZ Fordon p. 36 and line SN Ostromecko exited from GPZ Fordon p. 20 2) SN Sicienko line exited from GPZ Osowa Góra p. 22 by increasing the cross-section of the main track of the SN line together with the use of remote control and electrical security automation, including indicators of the flow of short-circuit currents, and the installation of measurement systems enabling energy management by the recipient in the area of the district of Bydgoszcz, in order to restore the power supply in order to restore the power supply in order to restore the power supply in order to restore the reservoir in order to restore the power of the reservoir in order to restore the power supply from the reservoir, in order to restore the power to the reservoir in order to restore the power in order to restore the power supply to the reservoir, in order to restore the power supply in order to restore the power supply in order to restore the power supply in order to restore the power from the reservoir, in order to restore the power supply from the reservoir, in order to restore the power supply from the area of the district of Dąbrowa Chełmińska, which is implemented by the construction of a new passage through the Vistula River with reference to the existing line of SN Kotomierz derived from GPZ Fordon p. 36 and the SN Ostromecko line derived from GPZ Fordon p. 20 2) SN Sicienko line taken from the GPZ Osowa Góra p. 22 by increasing the cross-section of the main line of the SN line together with the application of remote control and power automation of the protection, including indicators of the flow of short-circues currents, and the installation of measurement systems enabling energy management by the recipient in the area of the district by means of a complete identification of the reconditioning in order to restore the power in order to restore the power supply in order to restore the power supply in order to restore the power in order to restore the power in order to restore the power in order to restore the power in order to restore the power in order to restore the power from the reservoir in order to restore the power from the reservories, to enable the installation of the energy management by the consignee on the territory of the district by means of (Slovak)
    13 August 2022
    0 references
    Hanke edellyttää älykkään verkon rakentamista nykyaikaistamisen ja jälleenrakentamisen avulla: 1) power supply of the municipality of Dąbrowa Chełmińska implemented by the construction of a new passage through the Vistula River with reference to the existing line SN Kotomierz derived from GPZ Fordon p. 36 and line SN Ostromecko exited from GPZ Fordon p. 20 2) SN Sicienko line exited from GPZ Osowa Góra p. 22 by increasing the cross-section of the main track of the SN line together with the use of remote control and electrical security automation, including indicators of the flow of short-circuit currents, and the installation of measurement systems enabling energy management by the recipient in the area of the district of Bydgoszcz, in order to restore the power supply in order to restore the power supply in order to restore the power supply in order to restore the reservoir in order to restore the power of the reservoir in order to restore the power supply from the reservoir, in order to restore the power to the reservoir in order to restore the power in order to restore the power supply to the reservoir, in order to restore the power supply in order to restore the power supply in order to restore the power supply in order to restore the power from the reservoir, in order to restore the power supply from the reservoir, in order to restore the power supply from the area of the district of Dąbrowa Chełmińska, which is implemented by the construction of a new passage through the Vistula River with reference to the existing line of SN Kotomierz derived from GPZ Fordon p. 36 and the SN Ostromecko line derived from GPZ Fordon p. 20 2) SN Sicienko line taken from the GPZ Osowa Góra p. 22 by increasing the cross-section of the main line of the SN line together with the application of remote control and power automation of the protection, including indicators of the flow of short-circues currents, and the installation of measurement systems enabling energy management by the recipient in the area of the district by means of a complete identification of the reconditioning in order to restore the power in order to restore the power supply in order to restore the power supply in order to restore the power in order to restore the power in order to restore the power in order to restore the power in order to restore the power in order to restore the power from the reservoir in order to restore the power from the reservories, to enable the installation of the energy management by the consignee on the territory of the district by means of (Finnish)
    13 August 2022
    0 references
    A projekt egy intelligens hálózat kiépítését feltételezi modernizáció és újjáépítés révén: 1) power supply of the municipality of Dąbrowa Chełmińska implemented by the construction of a new passage through the Vistula River with reference to the existing line SN Kotomierz derived from GPZ Fordon p. 36 and line SN Ostromecko exited from GPZ Fordon p. 20 2) SN Sicienko line exited from GPZ Osowa Góra p. 22 by increasing the cross-section of the main track of the SN line together with the use of remote control and electrical security automation, including indicators of the flow of short-circuit currents, and the installation of measurement systems enabling energy management by the recipient in the area of the district of Bydgoszcz, in order to restore the power supply in order to restore the power supply in order to restore the power supply in order to restore the reservoir in order to restore the power of the reservoir in order to restore the power supply from the reservoir, in order to restore the power to the reservoir in order to restore the power in order to restore the power supply to the reservoir, in order to restore the power supply in order to restore the power supply in order to restore the power supply in order to restore the power from the reservoir, in order to restore the power supply from the reservoir, in order to restore the power supply from the area of the district of Dąbrowa Chełmińska, which is implemented by the construction of a new passage through the Vistula River with reference to the existing line of SN Kotomierz derived from GPZ Fordon p. 36 and the SN Ostromecko line derived from GPZ Fordon p. 20 2) SN Sicienko line taken from the GPZ Osowa Góra p. 22 by increasing the cross-section of the main line of the SN line together with the application of remote control and power automation of the protection, including indicators of the flow of short-circues currents, and the installation of measurement systems enabling energy management by the recipient in the area of the district by means of a complete identification of the reconditioning in order to restore the power in order to restore the power supply in order to restore the power supply in order to restore the power in order to restore the power in order to restore the power in order to restore the power in order to restore the power in order to restore the power from the reservoir in order to restore the power from the reservories, to enable the installation of the energy management by the consignee on the territory of the district by means of (Hungarian)
    13 August 2022
    0 references
    Projekt předpokládá výstavbu inteligentní sítě prostřednictvím modernizace a rekonstrukce: 1) power supply of the municipality of Dąbrowa Chełmińska implemented by the construction of a new passage through the Vistula River with reference to the existing line SN Kotomierz derived from GPZ Fordon p. 36 and line SN Ostromecko exited from GPZ Fordon p. 20 2) SN Sicienko line exited from GPZ Osowa Góra p. 22 by increasing the cross-section of the main track of the SN line together with the use of remote control and electrical security automation, including indicators of the flow of short-circuit currents, and the installation of measurement systems enabling energy management by the recipient in the area of the district of Bydgoszcz, in order to restore the power supply in order to restore the power supply in order to restore the power supply in order to restore the reservoir in order to restore the power of the reservoir in order to restore the power supply from the reservoir, in order to restore the power to the reservoir in order to restore the power in order to restore the power supply to the reservoir, in order to restore the power supply in order to restore the power supply in order to restore the power supply in order to restore the power from the reservoir, in order to restore the power supply from the reservoir, in order to restore the power supply from the area of the district of Dąbrowa Chełmińska, which is implemented by the construction of a new passage through the Vistula River with reference to the existing line of SN Kotomierz derived from GPZ Fordon p. 36 and the SN Ostromecko line derived from GPZ Fordon p. 20 2) SN Sicienko line taken from the GPZ Osowa Góra p. 22 by increasing the cross-section of the main line of the SN line together with the application of remote control and power automation of the protection, including indicators of the flow of short-circues currents, and the installation of measurement systems enabling energy management by the recipient in the area of the district by means of a complete identification of the reconditioning in order to restore the power in order to restore the power supply in order to restore the power supply in order to restore the power in order to restore the power in order to restore the power in order to restore the power in order to restore the power in order to restore the power from the reservoir in order to restore the power from the reservories, to enable the installation of the energy management by the consignee on the territory of the district by means of (Czech)
    13 August 2022
    0 references
    Projekts paredz viedtīkla būvniecību, modernizējot un rekonstruējot: 1) power supply of the municipality of Dąbrowa Chełmińska implemented by the construction of a new passage through the Vistula River with reference to the existing line SN Kotomierz derived from GPZ Fordon p. 36 and line SN Ostromecko exited from GPZ Fordon p. 20 2) SN Sicienko line exited from GPZ Osowa Góra p. 22 by increasing the cross-section of the main track of the SN line together with the use of remote control and electrical security automation, including indicators of the flow of short-circuit currents, and the installation of measurement systems enabling energy management by the recipient in the area of the district of Bydgoszcz, in order to restore the power supply in order to restore the power supply in order to restore the power supply in order to restore the reservoir in order to restore the power of the reservoir in order to restore the power supply from the reservoir, in order to restore the power to the reservoir in order to restore the power in order to restore the power supply to the reservoir, in order to restore the power supply in order to restore the power supply in order to restore the power supply in order to restore the power from the reservoir, in order to restore the power supply from the reservoir, in order to restore the power supply from the area of the district of Dąbrowa Chełmińska, which is implemented by the construction of a new passage through the Vistula River with reference to the existing line of SN Kotomierz derived from GPZ Fordon p. 36 and the SN Ostromecko line derived from GPZ Fordon p. 20 2) SN Sicienko line taken from the GPZ Osowa Góra p. 22 by increasing the cross-section of the main line of the SN line together with the application of remote control and power automation of the protection, including indicators of the flow of short-circues currents, and the installation of measurement systems enabling energy management by the recipient in the area of the district by means of a complete identification of the reconditioning in order to restore the power in order to restore the power supply in order to restore the power supply in order to restore the power in order to restore the power in order to restore the power in order to restore the power in order to restore the power in order to restore the power from the reservoir in order to restore the power from the reservories, to enable the installation of the energy management by the consignee on the territory of the district by means of (Latvian)
    13 August 2022
    0 references
    Glactar leis sa tionscadal go dtógfar eangach chliste trí nuachóiriú agus atógáil: 1) power supply of the municipality of Dąbrowa Chełmińska implemented by the construction of a new passage through the Vistula River with reference to the existing line SN Kotomierz derived from GPZ Fordon p. 36 and line SN Ostromecko exited from GPZ Fordon p. 20 2) SN Sicienko line exited from GPZ Osowa Góra p. 22 by increasing the cross-section of the main track of the SN line together with the use of remote control and electrical security automation, including indicators of the flow of short-circuit currents, and the installation of measurement systems enabling energy management by the recipient in the area of the district of Bydgoszcz, in order to restore the power supply in order to restore the power supply in order to restore the power supply in order to restore the reservoir in order to restore the power of the reservoir in order to restore the power supply from the reservoir, in order to restore the power to the reservoir in order to restore the power in order to restore the power supply to the reservoir, in order to restore the power supply in order to restore the power supply in order to restore the power supply in order to restore the power from the reservoir, in order to restore the power supply from the reservoir, in order to restore the power supply from the area of the district of Dąbrowa Chełmińska, which is implemented by the construction of a new passage through the Vistula River with reference to the existing line of SN Kotomierz derived from GPZ Fordon p. 36 and the SN Ostromecko line derived from GPZ Fordon p. 20 2) SN Sicienko line taken from the GPZ Osowa Góra p. 22 by increasing the cross-section of the main line of the SN line together with the application of remote control and power automation of the protection, including indicators of the flow of short-circues currents, and the installation of measurement systems enabling energy management by the recipient in the area of the district by means of a complete identification of the reconditioning in order to restore the power in order to restore the power supply in order to restore the power supply in order to restore the power in order to restore the power in order to restore the power in order to restore the power in order to restore the power in order to restore the power from the reservoir in order to restore the power from the reservories, to enable the installation of the energy management by the consignee on the territory of the district by means of (Irish)
    13 August 2022
    0 references
    Projekt predvideva izgradnjo pametnega omrežja s posodobitvijo in obnovo: 1) power supply of the municipality of Dąbrowa Chełmińska implemented by the construction of a new passage through the Vistula River with reference to the existing line SN Kotomierz derived from GPZ Fordon p. 36 and line SN Ostromecko exited from GPZ Fordon p. 20 2) SN Sicienko line exited from GPZ Osowa Góra p. 22 by increasing the cross-section of the main track of the SN line together with the use of remote control and electrical security automation, including indicators of the flow of short-circuit currents, and the installation of measurement systems enabling energy management by the recipient in the area of the district of Bydgoszcz, in order to restore the power supply in order to restore the power supply in order to restore the power supply in order to restore the reservoir in order to restore the power of the reservoir in order to restore the power supply from the reservoir, in order to restore the power to the reservoir in order to restore the power in order to restore the power supply to the reservoir, in order to restore the power supply in order to restore the power supply in order to restore the power supply in order to restore the power from the reservoir, in order to restore the power supply from the reservoir, in order to restore the power supply from the area of the district of Dąbrowa Chełmińska, which is implemented by the construction of a new passage through the Vistula River with reference to the existing line of SN Kotomierz derived from GPZ Fordon p. 36 and the SN Ostromecko line derived from GPZ Fordon p. 20 2) SN Sicienko line taken from the GPZ Osowa Góra p. 22 by increasing the cross-section of the main line of the SN line together with the application of remote control and power automation of the protection, including indicators of the flow of short-circues currents, and the installation of measurement systems enabling energy management by the recipient in the area of the district by means of a complete identification of the reconditioning in order to restore the power in order to restore the power supply in order to restore the power supply in order to restore the power in order to restore the power in order to restore the power in order to restore the power in order to restore the power in order to restore the power from the reservoir in order to restore the power from the reservories, to enable the installation of the energy management by the consignee on the territory of the district by means of (Slovenian)
    13 August 2022
    0 references
    Проектът предполага изграждането на интелигентна мрежа чрез модернизация и реконструкция: 1) power supply of the municipality of Dąbrowa Chełmińska implemented by the construction of a new passage through the Vistula River with reference to the existing line SN Kotomierz derived from GPZ Fordon p. 36 and line SN Ostromecko exited from GPZ Fordon p. 20 2) SN Sicienko line exited from GPZ Osowa Góra p. 22 by increasing the cross-section of the main track of the SN line together with the use of remote control and electrical security automation, including indicators of the flow of short-circuit currents, and the installation of measurement systems enabling energy management by the recipient in the area of the district of Bydgoszcz, in order to restore the power supply in order to restore the power supply in order to restore the power supply in order to restore the reservoir in order to restore the power of the reservoir in order to restore the power supply from the reservoir, in order to restore the power to the reservoir in order to restore the power in order to restore the power supply to the reservoir, in order to restore the power supply in order to restore the power supply in order to restore the power supply in order to restore the power from the reservoir, in order to restore the power supply from the reservoir, in order to restore the power supply from the area of the district of Dąbrowa Chełmińska, which is implemented by the construction of a new passage through the Vistula River with reference to the existing line of SN Kotomierz derived from GPZ Fordon p. 36 and the SN Ostromecko line derived from GPZ Fordon p. 20 2) SN Sicienko line taken from the GPZ Osowa Góra p. 22 by increasing the cross-section of the main line of the SN line together with the application of remote control and power automation of the protection, including indicators of the flow of short-circues currents, and the installation of measurement systems enabling energy management by the recipient in the area of the district by means of a complete identification of the reconditioning in order to restore the power in order to restore the power supply in order to restore the power supply in order to restore the power in order to restore the power in order to restore the power in order to restore the power in order to restore the power in order to restore the power from the reservoir in order to restore the power from the reservories, to enable the installation of the energy management by the consignee on the territory of the district by means of (Bulgarian)
    13 August 2022
    0 references
    Il-proġett jassumi l-kostruzzjoni ta’ grilja intelliġenti permezz tal-modernizzazzjoni u r-rikostruzzjoni: 1) power supply of the municipality of Dąbrowa Chełmińska implemented by the construction of a new passage through the Vistula River with reference to the existing line SN Kotomierz derived from GPZ Fordon p. 36 and line SN Ostromecko exited from GPZ Fordon p. 20 2) SN Sicienko line exited from GPZ Osowa Góra p. 22 by increasing the cross-section of the main track of the SN line together with the use of remote control and electrical security automation, including indicators of the flow of short-circuit currents, and the installation of measurement systems enabling energy management by the recipient in the area of the district of Bydgoszcz, in order to restore the power supply in order to restore the power supply in order to restore the power supply in order to restore the reservoir in order to restore the power of the reservoir in order to restore the power supply from the reservoir, in order to restore the power to the reservoir in order to restore the power in order to restore the power supply to the reservoir, in order to restore the power supply in order to restore the power supply in order to restore the power supply in order to restore the power from the reservoir, in order to restore the power supply from the reservoir, in order to restore the power supply from the area of the district of Dąbrowa Chełmińska, which is implemented by the construction of a new passage through the Vistula River with reference to the existing line of SN Kotomierz derived from GPZ Fordon p. 36 and the SN Ostromecko line derived from GPZ Fordon p. 20 2) SN Sicienko line taken from the GPZ Osowa Góra p. 22 by increasing the cross-section of the main line of the SN line together with the application of remote control and power automation of the protection, including indicators of the flow of short-circues currents, and the installation of measurement systems enabling energy management by the recipient in the area of the district by means of a complete identification of the reconditioning in order to restore the power in order to restore the power supply in order to restore the power supply in order to restore the power in order to restore the power in order to restore the power in order to restore the power in order to restore the power in order to restore the power from the reservoir in order to restore the power from the reservories, to enable the installation of the energy management by the consignee on the territory of the district by means of (Maltese)
    13 August 2022
    0 references
    O projeto pressupõe a construção de uma rede inteligente através da modernização e reconstrução: 1) power supply of the municipality of Dąbrowa Chełmińska implemented by the construction of a new passage through the Vistula River with reference to the existing line SN Kotomierz derived from GPZ Fordon p. 36 and line SN Ostromecko exited from GPZ Fordon p. 20 2) SN Sicienko line exited from GPZ Osowa Góra p. 22 by increasing the cross-section of the main track of the SN line together with the use of remote control and electrical security automation, including indicators of the flow of short-circuit currents, and the installation of measurement systems enabling energy management by the recipient in the area of the district of Bydgoszcz, in order to restore the power supply in order to restore the power supply in order to restore the power supply in order to restore the reservoir in order to restore the power of the reservoir in order to restore the power supply from the reservoir, in order to restore the power to the reservoir in order to restore the power in order to restore the power supply to the reservoir, in order to restore the power supply in order to restore the power supply in order to restore the power supply in order to restore the power from the reservoir, in order to restore the power supply from the reservoir, in order to restore the power supply from the area of the district of Dąbrowa Chełmińska, which is implemented by the construction of a new passage through the Vistula River with reference to the existing line of SN Kotomierz derived from GPZ Fordon p. 36 and the SN Ostromecko line derived from GPZ Fordon p. 20 2) SN Sicienko line taken from the GPZ Osowa Góra p. 22 by increasing the cross-section of the main line of the SN line together with the application of remote control and power automation of the protection, including indicators of the flow of short-circues currents, and the installation of measurement systems enabling energy management by the recipient in the area of the district by means of a complete identification of the reconditioning in order to restore the power in order to restore the power supply in order to restore the power supply in order to restore the power in order to restore the power in order to restore the power in order to restore the power in order to restore the power in order to restore the power from the reservoir in order to restore the power from the reservories, to enable the installation of the energy management by the consignee on the territory of the district by means of (Portuguese)
    13 August 2022
    0 references
    Projektet forudsætter opførelsen af et intelligent net gennem modernisering og genopbygning: 1) power supply of the municipality of Dąbrowa Chełmińska implemented by the construction of a new passage through the Vistula River with reference to the existing line SN Kotomierz derived from GPZ Fordon p. 36 and line SN Ostromecko exited from GPZ Fordon p. 20 2) SN Sicienko line exited from GPZ Osowa Góra p. 22 by increasing the cross-section of the main track of the SN line together with the use of remote control and electrical security automation, including indicators of the flow of short-circuit currents, and the installation of measurement systems enabling energy management by the recipient in the area of the district of Bydgoszcz, in order to restore the power supply in order to restore the power supply in order to restore the power supply in order to restore the reservoir in order to restore the power of the reservoir in order to restore the power supply from the reservoir, in order to restore the power to the reservoir in order to restore the power in order to restore the power supply to the reservoir, in order to restore the power supply in order to restore the power supply in order to restore the power supply in order to restore the power from the reservoir, in order to restore the power supply from the reservoir, in order to restore the power supply from the area of the district of Dąbrowa Chełmińska, which is implemented by the construction of a new passage through the Vistula River with reference to the existing line of SN Kotomierz derived from GPZ Fordon p. 36 and the SN Ostromecko line derived from GPZ Fordon p. 20 2) SN Sicienko line taken from the GPZ Osowa Góra p. 22 by increasing the cross-section of the main line of the SN line together with the application of remote control and power automation of the protection, including indicators of the flow of short-circues currents, and the installation of measurement systems enabling energy management by the recipient in the area of the district by means of a complete identification of the reconditioning in order to restore the power in order to restore the power supply in order to restore the power supply in order to restore the power in order to restore the power in order to restore the power in order to restore the power in order to restore the power in order to restore the power from the reservoir in order to restore the power from the reservories, to enable the installation of the energy management by the consignee on the territory of the district by means of (Danish)
    13 August 2022
    0 references
    Proiectul presupune construirea unei rețele inteligente prin modernizare și reconstrucție: 1) power supply of the municipality of Dąbrowa Chełmińska implemented by the construction of a new passage through the Vistula River with reference to the existing line SN Kotomierz derived from GPZ Fordon p. 36 and line SN Ostromecko exited from GPZ Fordon p. 20 2) SN Sicienko line exited from GPZ Osowa Góra p. 22 by increasing the cross-section of the main track of the SN line together with the use of remote control and electrical security automation, including indicators of the flow of short-circuit currents, and the installation of measurement systems enabling energy management by the recipient in the area of the district of Bydgoszcz, in order to restore the power supply in order to restore the power supply in order to restore the power supply in order to restore the reservoir in order to restore the power of the reservoir in order to restore the power supply from the reservoir, in order to restore the power to the reservoir in order to restore the power in order to restore the power supply to the reservoir, in order to restore the power supply in order to restore the power supply in order to restore the power supply in order to restore the power from the reservoir, in order to restore the power supply from the reservoir, in order to restore the power supply from the area of the district of Dąbrowa Chełmińska, which is implemented by the construction of a new passage through the Vistula River with reference to the existing line of SN Kotomierz derived from GPZ Fordon p. 36 and the SN Ostromecko line derived from GPZ Fordon p. 20 2) SN Sicienko line taken from the GPZ Osowa Góra p. 22 by increasing the cross-section of the main line of the SN line together with the application of remote control and power automation of the protection, including indicators of the flow of short-circues currents, and the installation of measurement systems enabling energy management by the recipient in the area of the district by means of a complete identification of the reconditioning in order to restore the power in order to restore the power supply in order to restore the power supply in order to restore the power in order to restore the power in order to restore the power in order to restore the power in order to restore the power in order to restore the power from the reservoir in order to restore the power from the reservories, to enable the installation of the energy management by the consignee on the territory of the district by means of (Romanian)
    13 August 2022
    0 references
    Projektet förutsätter byggandet av ett smart nät genom modernisering och återuppbyggnad: 1) power supply of the municipality of Dąbrowa Chełmińska implemented by the construction of a new passage through the Vistula River with reference to the existing line SN Kotomierz derived from GPZ Fordon p. 36 and line SN Ostromecko exited from GPZ Fordon p. 20 2) SN Sicienko line exited from GPZ Osowa Góra p. 22 by increasing the cross-section of the main track of the SN line together with the use of remote control and electrical security automation, including indicators of the flow of short-circuit currents, and the installation of measurement systems enabling energy management by the recipient in the area of the district of Bydgoszcz, in order to restore the power supply in order to restore the power supply in order to restore the power supply in order to restore the reservoir in order to restore the power of the reservoir in order to restore the power supply from the reservoir, in order to restore the power to the reservoir in order to restore the power in order to restore the power supply to the reservoir, in order to restore the power supply in order to restore the power supply in order to restore the power supply in order to restore the power from the reservoir, in order to restore the power supply from the reservoir, in order to restore the power supply from the area of the district of Dąbrowa Chełmińska, which is implemented by the construction of a new passage through the Vistula River with reference to the existing line of SN Kotomierz derived from GPZ Fordon p. 36 and the SN Ostromecko line derived from GPZ Fordon p. 20 2) SN Sicienko line taken from the GPZ Osowa Góra p. 22 by increasing the cross-section of the main line of the SN line together with the application of remote control and power automation of the protection, including indicators of the flow of short-circues currents, and the installation of measurement systems enabling energy management by the recipient in the area of the district by means of a complete identification of the reconditioning in order to restore the power in order to restore the power supply in order to restore the power supply in order to restore the power in order to restore the power in order to restore the power in order to restore the power in order to restore the power in order to restore the power from the reservoir in order to restore the power from the reservories, to enable the installation of the energy management by the consignee on the territory of the district by means of (Swedish)
    13 August 2022
    0 references
    WOJ.: KUJAWSKO-POMORSKIE, POW.: bydgoski
    0 references
    24 May 2023
    0 references

    Identifiers

    POIS.01.04.01-00-0009/17
    0 references