Analysis of run-off ratios including proposals for possible flood protection measures at the Třeboň basin district (Q58214)

From EU Knowledge Graph
Revision as of 01:52, 26 March 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Analysis of run-off ratios including proposals for possible flood protection measures at the Třeboň basin district
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    844,421.53 Czech koruna
    0 references
    33,776.8612 Euro
    10 January 2020
    0 references
    993,437.1 Czech koruna
    0 references
    39,737.484 Euro
    10 January 2020
    0 references
    85.0 percent
    0 references
    16 June 2017
    0 references
    26 July 2018
    0 references
    31 December 2019
    0 references
    Městská část Praha-Čakovice
    0 references
    0 references

    50°9'18.40"N, 14°31'41.84"E
    0 references
    19600
    0 references
    V rámci projektu bude pořízena studie odtokových poměrů včetně návrhů možných protipovodňových opatření v oblastech s potenciálním povodňovým rizikem v povodí Třeboradického potoka jako podklad pro následnou realizaci. (Czech)
    0 references
    The project will produce a study of the run-off ratios, including proposals for possible flood protection measures in areas with potential flood risk in the Třeboň basin, as a basis for subsequent implementation. (English)
    0 references

    Identifiers

    CZ.05.1.24/0.0/0.0/16_035/0002155
    0 references