Construction of architectural and construction premises No 6 and 12 in Gniezno, including the management of the site (Q137124)

From EU Knowledge Graph
Revision as of 18:53, 26 March 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of architectural and construction premises No 6 and 12 in Gniezno, including the management of the site
Project in Poland financed by DG Regio

    Statements

    0 references
    987,850.42 zloty
    0 references
    237,084.10080000001 Euro
    13 January 2020
    0 references
    1,994,992.16 zloty
    0 references
    478,798.1184 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    25 May 2016
    0 references
    28 October 2016
    0 references
    MIASTO GNIEZNO
    0 references
    Przedmiotem projektu jest przebud. i cz. doposażenie istniejących obiektów, c. utworzenia nowych miejsc w przedszkolach dla dz. 3-4letnich:1. Przebud. oraz zmiana sposobu użytkowania parteru bud, zlokal. przy ul. Wiosennej 7 (Przedszkole nr 6). Obecnie cz. parteru jest wykorzystywana jako pom. mieszkalne. Obecnie w przedszkolu funkcjonują 4 oddziały. W wyniku realizacji projektu powstanie 1 nowy oddziału (dla 15 dzieci). Dla jego utworzenia konieczna jest adaptacja pomieszczeń mieszkalnych oraz przebudowa funkcjonującego na parterze oddziału (dostosowanie do przepisów higieniczno-sanitarnych, ppoż., dostosowanie do os. niepełnosprawnych).2. Zmiana sposobu użytkowania parteru budynku pokoszarowego zlokal. w Gnieźnie- ul. Pocztowa 11 (budynek Gimnazjum nr 2), c. utworzenia 3 nowych oddz. w Przedszkolu nr 12. Z uwagi na fakt, iż funkcjonowanie Przedszkola nr 12 w obecnej lokalizacji (ul. Kościuszki) jest niemożliwe- mieści się ono w budynku, który cz. jest użytkowany jako żłobek. W związku z powiększ. pow. żłobka oraz rosnącymi potrzebami zw. z powstaniem nowych oddziałów dla dzieci w wieku przedszkolnym, konieczna jest zmiana dotychczasowej lokalizacji przedszkola oraz przystosowanie pomieszczeń w gimnazjum do nowej funkcji. Projekt obejmuje 7 oddziałów- w tym 3 nowe dla 3 i 4 latków (łącznie dla 75 nowych dzieci). W bud. P nr 6 powstaną nowe pomieszcz.: sala, szatnia, toalety. W nowej lokalizacji P nr 12 powstanie 7 sal wraz z węzłami sanit., węzeł sanit. dla pracowników, pomieszcz. socjalne, oraz rozdziału posiłków, winda dla posiłków oraz zmywalnia (studium s.3-5)Zakres rzeczowy obejmuje zagospod. t. dla celów placu zabaw wokół budynku (P12) oraz wyposażenie (urządzenia placu zabaw; patrz studium s.52; tab. 5.1.1. wniosku -Opis kategorii- zagospodarowanie terenu)L. wspartych obiektów infrastruktury przedszkolnej - 2; Potencjał objętej wsparciem infrastruktury- 279 dzieci.L. os. korz. z wspartych ob -270Projekt jest komplementarny i zintegr. z dział 8.1.1 (EFS) (Polish)
    0 references
    The subject of the project is a re-fitting of existing facilities, c. the creation of new places in nursery schools for the Dz. 3-4 years: 1. Transfer and change in use of the ground floor budget, located at ul. Spring 7 (School No 6). Currently part of the ground floor is used as a residential unit. There are currently 4 units in the kindergarten. As a result of the project, there will be 1 new branches (for 15 children). For its creation, it is necessary to adapt the living quarters and to rebuild the ground floor of the branch (adaptation to hygiene/health rules, watering., adaptation to the disability).2. Changing the use of the ground floor of a residential building site in Gniezno — ul. PO 11 (Gimpozioum building No 2), c. creation of 3 new 12. Due to the fact that the operation of the Pre-School No. 12 in the current location (ul. Kościuszki) is impossible — it is located in a building which is part of the building and is used as a nursery. Due to the expansion of the crèche and the growing needs in connection with the emergence of new branches for pre-school children, there is a need to change the current location of the nursery school and to adapt the school’s premises to the new function. The project includes 7 affiliates, including 3 new ones for 3 and 4 year olds (including 75 new children). In the budget. P no 6 will create new spaces: room, cloakroom, toilets. The new location P No 12 will create 7 rooms, together with the hubs of the site., Ksanit. for employees, social housing, and meal separation, meals for meals and for the dishwasher (p. 3-5). the material scope includes runs for the playground of the building (P12) and the equipment (playground equipment; see the study on p. 52; 5.1.1th proposal — Description of category — land management) of L. supported pre-school infrastructure — 2; Infrastructure supported capacity — 279 children.L. os. with supported b-270Project is complementary and integrated in Heading 8.1.1 (ESF) (English)
    0 references

    Identifiers

    RPWP.09.03.01-30-0047/16
    0 references