OPTIMISATION OF LOGISTICS IN THE PROCESS OF POWER SUPPLY (Q2075084)

From EU Knowledge Graph
Revision as of 17:35, 8 April 2023 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project Q2075084 in Italy
Language Label Description Also known as
English
OPTIMISATION OF LOGISTICS IN THE PROCESS OF POWER SUPPLY
Project Q2075084 in Italy

    Statements

    0 references
    24,000.0 Euro
    0 references
    48,000.0 Euro
    0 references
    50.0 percent
    0 references
    5 June 2018
    0 references
    26 November 2018
    0 references
    1 April 2019
    0 references
    DISTILLERIE BONOLLO UMBERTO S.P.A.
    0 references
    0 references

    45°14'1.46"N, 11°52'26.44"E
    0 references
    IL PROGETTO HA L'OBIETTIVO SPECIFICO DI APPLICARE UN NUOVO METODO DI GESTIONE DELLA LOGISTICA E DELLA MOVIMENTAZIONE *individuo*, INTRODUCENDO ATTREZZATURE/MEZZI ISPIRATI AL MODELLO INDUSTRIA 4.0, INTEGRANDOLI CON SOFTWARE GESTIONALI AVANZATI AZIENDALI. (Italian)
    0 references
    The following project has been carried out by the project: a new management method for the management of the LOGISTICS AND MOVIMENTARE *, individual *, INTRODUCENDO ATTREZZATURE/MEZZI based on the MODEL INDUSTRY 4.0, integrating them with SOSTONALI AVANZATI HOLDINGS. (English)
    0 references
    Le PROJET SANS L’OBJECTIF SPÉCIFIQUE DE L’APPLICATION UNE NOUVELLE MÉTHODE DE GESTION DE LA LOGISTIQUE ET DE LA MOVING *individuelle*, présentant les ÉQUIPEMENTS/METIES ISPIRÉES AU MODÈLE 4.0 de l’INDUSTRIE, en les intégrant avec le ZIP ADVANCED MANAGEMENT SOFTWARE. (French)
    16 December 2021
    0 references
    Het PROJECT HAS DE SPECIFISCHE OBJECTIE VAN TOEPASSING EEN NIEUWE METHOD VAN MANAGEMENT VAN LOGISTICS EN MOVING *individueel*, introduceert KLANTEN/METIES ISPIRATED AAN INDUSTRY MODEL 4.0, integreren met ZIP ADVANCED MANAGEMENT SOFTWARE. (Dutch)
    23 December 2021
    0 references
    Das PROJEKT HAS DIE SPEZIFISCHE OBJECTIVE OF APPLICATION A NEW METHOD OF MANAGEMENT OF LOGISTICS AND MOVING *individuell*, Einführung von EQUIPMENTS/METIES ISPIRATED TO INDUSTRY MODEL 4.0, integriert sie mit ZIP ADVANCED MANAGEMENT SOFTWARE. (German)
    24 December 2021
    0 references
    El PROYECTO HASTA EL OBJETIVO ESPECÍFICO DE APLICACIÓN UN NUEVO MÉTODO DE GESTIÓN DE LOGISTICAS Y MOVIMIENTO *individual*, presentando EQUIPMENTOS/METOS ISPIRADOS EN EL MODELO INDUSTRIO 4.0, integrándolos con ZIP ADVANCED MANAGEMENT SOFTWARE. (Spanish)
    25 January 2022
    0 references
    Følgende projekt er blevet gennemført af projektet: en ny ledelsesmetode til styring af LOGISTIK OG MOVIMENTARE *, individuel *, Introducendo ATTREZZATURE/MEZZI baseret på MODEL INDUSTRY 4.0, integrere dem med SOSTONALI AVANZATI HOLDINGS. (Danish)
    5 July 2022
    0 references
    Στο πλαίσιο του έργου υλοποιήθηκε το ακόλουθο έργο: μια νέα μέθοδος διαχείρισης για τη διαχείριση των LOGISTICS AND MOVIMENTARE *, individual *, Introducendo ATTREZZATURE/MEZZI με βάση το MODEL INDUSTRY 4.0, ενσωματώνοντάς τα με SOSTONALI AVANZATI HOLDINGS. (Greek)
    5 July 2022
    0 references
    U okviru projekta proveden je sljedeći projekt: nova metoda upravljanja za upravljanje LOGISTICS and MOVIMENTARE *, individualni *, Uvod ATTREZZATURE/MEZZI baziran na MODEL INDUSTRY 4.0, integrirajući ih sa SOSTONALI AVANZATI HOLDINGS. (Croatian)
    5 July 2022
    0 references
    Proiectul a derulat următorul proiect: o noua metoda de management pentru managementul LOGISTICII ȘI MOVIMENTARE *, individual *, Introducendo ATTREZZATURE/MEZZI bazat pe MODEL INDUSTRY 4.0, integrându-le cu SOSTONALI AVANZATI HOLDINGS. (Romanian)
    5 July 2022
    0 references
    V rámci projektu sa realizoval tento projekt: nová metóda riadenia LOGISTICS A MOVIMENTARE *, individuálne *, Introducendo ATTREZZATURE/MEZZI založená na MODEL INDUSTRY 4.0, ktorá ich integruje so SOSTONALI AVANZATI HOLDINGS. (Slovak)
    5 July 2022
    0 references
    Il-proġett li ġej twettaq mill-proġett: metodu ġdid ta’ ġestjoni għall-ġestjoni tal-LOGISTICS U MOVIMENTARE *, individwali *, Introducendo ATTREZZATURA/MEZZI ibbażat fuq l-INDUSTRIJA 4.0, li jintegrahom mal-HOLDINGS SOSTONALI AVANZATI. (Maltese)
    5 July 2022
    0 references
    O projeto realizou o seguinte projeto: um novo método de gestão para a gestão do LOGÍSTICA E MOVIMENTARE *, individual *, Introducendo ATTREZZATURE/MEZZI com base no MODEL INDUSTRY 4.0, integrando-os com SOSTONALI AVANZATI HOLDINGS. (Portuguese)
    5 July 2022
    0 references
    Hankkeessa on toteutettu seuraava hanke: uusi hallintomenetelmä LOGISTICS- JA MOVIMENTARE *, individual *, Introducendo ATTREZZATURE/MEZZI -järjestelmien hallinnoimiseksi MODEL INDUSTRY 4.0:n pohjalta ja integroimalla ne SOSTONALI AVANZATI HOLDINGS -järjestelmään. (Finnish)
    5 July 2022
    0 references
    W ramach projektu zrealizowano następujący projekt: nowa metoda zarządzania LOGISTICS I MOVIMENTARE *, indywidualna *, Wprowadzenie ATTREZZATURE/MEZZI w oparciu o MODEL INDUSTRY 4.0, integrując je z SOSTONALI AVANZATI HOLDINGS. (Polish)
    5 July 2022
    0 references
    Projekt je izvedel naslednji projekt: nova metoda upravljanja LOGISTICS IN MOVIMENTARE *, individualna *, Predstavitev ATTREZZATURE/MEZZI, ki temelji na MODEL INDUSTRY 4.0 in jih integrira v SOSTONALI AVANZATI HOLDINGS. (Slovenian)
    5 July 2022
    0 references
    Projekt realizoval tento projekt: nová metoda řízení pro řízení LOGISTICS AND MOVIMENTARE *, individuální *, Introducendo ATTREZZATURE/MEZZI na základě MODEL INDUSTRY 4.0, integrující je se SOSTONALI AVANZATI HOLDINGS. (Czech)
    5 July 2022
    0 references
    Šiuo projektu buvo įgyvendintas šis projektas: naujas valdymo metodas LOGISTICS IR MOVIMENTARE *, individualus *, Introducendo ATTREZZATURE/MEZZI, pagrįstas MODEL INDUSTRY 4.0, integruojant juos su SOSTONALI AVANZATI HOLDINGS. (Lithuanian)
    5 July 2022
    0 references
    Projekta ietvaros ir īstenots šāds projekts: jauna vadības metode LOGISTICS UN MOVIMENTARE vadībai *, indivīds *, Introducendo ATTREZZATURE/MEZZI, pamatojoties uz MODEL INDUSTRY 4.0, integrējot tos ar SOSTONALI AVANZATI HOLDINGS. (Latvian)
    5 July 2022
    0 references
    Проектът е реализиран по следния проект: нов метод за управление на LOGISTICS AND MOVIMENTARE *, индивидуален *, Introducendo ATTREZZATURE/MEZZI на базата на MODEL INDUSTRY 4.0, интегрирайки ги със SOSTONALI AVANZATI HOLDINGS. (Bulgarian)
    5 July 2022
    0 references
    A projekt a következő projektet hajtotta végre: új irányítási módszer a LOGISTICS ÉS MOVIMENTARE *, egyéni *, Introducendo ATTREZZATURE/MEZZI kezelésére a MODEL INDUSTRY 4.0 alapján, integrálva azokat a SOSTONALI AVANZATI HOLDINGS-be. (Hungarian)
    5 July 2022
    0 references
    Tá an tionscadal seo a leanas curtha i gcrích ag an tionscadal: modh bainistíochta nua chun bainistiú na LOGISTICS AND MOVIMENTARE *, aonair *, attrezzature INTRODUCENDO/Mezzi bunaithe ar an 4.0 MODEL INDUSTRY, a chomhtháthú iad le SOSTONALI Avanzati HOLDINGS. (Irish)
    5 July 2022
    0 references
    Följande projekt har genomförts av projektet: en ny förvaltningsmetod för förvaltningen av LOGISTICS OCH MOVIMENTARE *, individ *, Introducendo ATTREZZATURE/MEZZI baserad på MODEL INDUSTRY 4.0, integrera dem med SOSTONALI AVANZATI HOLDINGS. (Swedish)
    5 July 2022
    0 references
    Projekti raames viidi ellu järgmine projekt: uus juhtimismeetod LOGISTICS JA MOVIMENTARE *, individual *, Introducendo ATTREZZATURE/MEZZI haldamiseks, mis põhineb MODEL INDUSTRY 4.0-l, integreerides need SOSTONALI AVANZATI HOLDINGSidega. (Estonian)
    5 July 2022
    0 references
    CONSELVE
    0 references
    8 April 2023
    0 references

    Identifiers

    B18H18001030009
    0 references