Thermal modernisation of the building keeper of the TSO in Koniecko (Q127651)

From EU Knowledge Graph
Revision as of 14:51, 26 March 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Thermal modernisation of the building keeper of the TSO in Koniecko
Project in Poland financed by DG Regio

    Statements

    0 references
    405,215.5 zloty
    0 references
    97,251.72 Euro
    13 January 2020
    0 references
    482,447.2 zloty
    0 references
    115,787.328 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    31 January 2018
    0 references
    30 June 2020
    0 references
    OCHOTNICZA STRAŻ POŻARNA W KONIEMŁOTACH
    0 references
    Głównym celem proj. jest zwiększona efektywność energ. budynków użyteczności publicznej. Inwestycja wpisuje się w cel szczegółowy Działania 3.3 Poprawa efekty. Energ. z wykorzysta. odnawialnych źródeł energii w sektorze publ. i mieszk., Osi prioryt.3. Efektywna i zielona energia, gdzie przewidziano możliwość dofinan. przedsięwzięć mających na celu zwiększenie efekty. Energ. budynków użyteczności publicznej. Projekt realizowany będzie w okresie: I 2018 do VI 2020. Prace związane z projektem będą polegały m.in. na: modernizacji inst. CO; ociepleniu stropu; wymianie okien, wymianie drzwi zewnętrznych, ociepleniu ścian zewnęt. oraz ścian zewnęt. przy gruncie, wymianie oświetlenia, instalacji PV. Właścicielem obiektu, w którym zostaną przeprowadzone prace termomodernizacyjne jest OSP Koniemłoty. Efektywność dofinan. projektu wynosi 5387,33zł/MWh/rok. Stopień poprawy efektywności energetycznej wynosi 83,57%. Efekt ekologiczny 98,88%. Oszczędność energii ciepła o 83,38% z wykorzystaniem OZE. Ograniczenie emisji CO2 do powietrza 53,11MgCo2/rok. Jest to budynek użyteczności publicznej pełniący funkcje społeczne i ratownicze. Efekt energ. wynosi 27,98kWh/m2. Proj. posiada dokum. tech. oraz wymagane decyzje admin. Proj. realizowany będzie na obszarze PR. Wskaźniki: Ilość zaoszczędzonej energii elektr.:3,37MWh/rok; Il. zaoszczędzonej energii cieplnej:293,18GJ/rok; Zmniejszenie zużycia energii końcowej w wyniku realizacji projektów: 355,56GJ/rok; Szacowany roczny spadek emisji gazów cieplarnianych:53,11 tony równoważnika CO2/rok; Liczba zmodernizo. Energ. budynków: 1szt; Powierz. użytkowa budynków poddanych termomoder.:562,9m2; Zmniejszenie rocznego zużycia energii pierwotnej w budynkach publicznych: 211525 kWh/rok; Liczba zmoder. źródeł ciepła:1szt. L. wybud. jedn. wytwarzania energii elektr. z OZE 1szt. OSP Koniemłoty dokona audytu energ. ex-post w terminie 14 m-cy od zak. inwestycji.FNPV/C=630395,60;FRR/C=10,52%. Nabywane środki trwałe będą nowe. (Polish)
    0 references
    The main objective of the project is to increase the energy efficiency of buildings of general interest. The investment is part of the specific objective of Measure 3.3. Energy from renewable energy sources in the pul sector and in the population., Osi priorit.3. Efficient and green energy with the possibility of financing projects to increase the impact. Buildings of general interest. The project will be implemented in the following period: And 2018 to VI 2020. The project’s work will include, but not be limited to: the fight against crime. CO; warming up the ceiling; the exchange of windows, the replacement of external doors, the warming of the internal wall and the interior walls on the ground, the replacement of lighting, the installation of PV. The owner of the facility where thermal modernisation works are to be carried out shall be the TSO. Project efficiency of 5387,33PLN/MWh/year. The energy efficiency improvement rate is 83.57 %. Green effect 98.88 %. Heat energy savings of 83.38 % using RES. Reduction of CO2 emissions to air 53,11MgCo2/rok. It is a public building that performs social and rescue functions. The energy output is 27.98 kWh/m². Technical and required adoption decisions. This will be done in the field of PR. Indicators: Amount of electricity saved: 3.37 MWh/year; Saved energy cieplnej:293,18GJ/rok; Reducing final energy consumption as a result of the implementation of projects: 355,56GJ/year; Estimated annual decrease in gas emissions cieplarnianych:53,11 tonnes CO2/rok equivalent; Modernised number. Buildings: 1szt; Construction of buildings, which have been subjected to Thermomodem, 562.9 m²; Reduction of annual primary energy consumption in public buildings: 211 525 kWh/year; The number of sources ciepła:1szt. L. new generation of electricity from renewable energy sources, from renewable energy sources, from renewable energy sources, from renewable energy sources, from renewable energy sources, from renewable energy sources, from renewable energy sources, from renewable energy sources, from renewable The TSOs to perform an energy audit shall perform an energy audit within 14 months of the investment. FNPV/C = 630395,60; FRR/C = 10.52 %. The acquired assets will be new. (English)
    0 references

    Identifiers

    RPSW.03.03.00-26-0046/17
    0 references