Development of an innovative system of automatic visual control of AOI 4.0 using artificial intelligence used for testing electronic components in the automotive sector (Q80156)

From EU Knowledge Graph
Revision as of 10:47, 26 March 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Development of an innovative system of automatic visual control of AOI 4.0 using artificial intelligence used for testing electronic components in the automotive sector
Project in Poland financed by DG Regio

    Statements

    0 references
    8,689,998.34 zloty
    0 references
    2,085,599.6016 Euro
    13 January 2020
    0 references
    15,445,009.5 zloty
    0 references
    3,706,802.28 Euro
    13 January 2020
    0 references
    56.26 percent
    0 references
    1 February 2017
    0 references
    31 August 2019
    0 references
    "FITECH" SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
    0 references

    49°47'27.6"N, 20°22'45.8"E
    0 references
    Przedmiot projektu to przeprowadzenie badań przemysłowych i prac rozwojowych ukierunkowanych na opracowanie innowacyjnego w skali świata systemu automatycznej kontroli wizualnej AOI 4.0 z wykorzystaniem sztucznej inteligencji (dalej:tester AOI 4.0) (innowacja produktowa wg def. Oslo Manual),który znajdzie zastosowanie w zautomatyzowanych procesach kontroli właściwości i struktury podzespołów elektronicznych na płytkach PCB,dedykowanych sektorowi motoryzacyjnemu, realizowanych w trybie on-line i możliwych do zastosowania w obecnie funkcjonujących liniach produkcyjnych. Nowatorska koncepcja (m.in.zastosowanie sztucznej inteligencji i mechanizmów Internet of Things, zmiany konstrukcyjne) przyniesie szereg korzyści dla użytkowników końcowych (np.zwiększona skuteczność wykrywanych wad do 99%,eliminacja fałszywych błędów do 5%,skrócony czas przygotowania programu testującego dla konkretnego pakietu PCBA o 2,5h,optymalizacja czasu testu pakietu PCBA,możliwość dwustronnego testowania PCBA). Testery AOI 4.0 będą wysoce innowacyjnymi systemami kontroli wizyjnej posiadającymi dużą przydatność użytkową dla grupy docelowej z sektora automotive(wartość dodana). Przedmiot projektu wpisuje się w KIS 17 i I obszar tematyczny programu INNOMOTO.Projekt będzie realizowany przy współudziale podwykonawców(podpisano umowy warunkowe o współpracy z Instytutem Odlewnictwa w Krakowie,Instytutem Metalurgii i Inżynierii Materiałowej PAN,Akademią Górniczo-Hutniczą w Krakowie).Cel projektu zostanie osiągnięty poprzez przeprowadzenie badań przemysłowych (2 etapy) i prac rozwojowych (2 etapy).Wdrożenie wyników prac B+R nastąpi w ciągu 3 lat od zakończenia projektu na terytorium RP-wdrożenie we własnej działalności gosp. Fitech. Efekt podjętych działań to rozszerzenie oferty Spółki o nowe produkty posiadające istotne prze (Polish)
    0 references
    The object of the project is to carry out industrial research and development activities aimed at developing an internationally innovative system of automatic visual inspection of AOI 4.0 using artificial intelligence (dalej:tester AOI 4.0) (product innovation by def. Oslo Manual), which will apply in automated processes to control the properties and structure of electronic components on PCB plates, dedicated to the automotive sector, which are implemented online and can be used in existing production lines.The innovative concept (including the use of artificial intelligence and the Internet of Things, structural changes) will bring a number of benefits to the end users (e.g. increased efficiency of the detected defects to 99 %, elimination of false errors to 5 %, the shortened preparation of the testing programme for the specific PCBBA package by 2,5h, optimisation of the duration of the PCBBA test package, the possibility of a double testing of the PCBA).The AOI 4.0 will be highly innovative video surveillance systems with a high value for use for the autologous target group (value added).The subject of the project is part of the INNOMOTO.Thematic Area of Kis 17 and I. the project will be carried out with the involvement of subcontractors (conditional agreements have been signed with the Institute for foundries, the Institute of Metallurgy and Engineering of the Polish Academy of Materials, the Institute of Metallurgy and Engineering in Kraków).The objective of the project will be achieved through the conduct of industrial research (2 stages) and development (2 stages).Implementation of the R & D results will take place within 3 years of the end of the project within the RP-deployment.Fitech.The effect of the measures taken is to extend the company’s offer to new products which are essential to it. (English)
    0 references

    Identifiers

    POIR.01.02.00-00-0226/16
    0 references