Replacing the coal-fired boiler by a 139.9 kW heat pump team. (Q137672)

From EU Knowledge Graph
Revision as of 10:05, 11 March 2020 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The project involves the replacement of the existing coal-fired boiler with a power of 160 kW by three units of heat pumps for central heating and the preparation of hot water in the buildings of the WEROL sp. z o.o., located in Chwilram 26, 78-600 Walcz. The project includes lower heat source technology. Currently, plants are heated by conventional energy sources, environmental technologies and high fuel costs have affected the applicants’ depl...)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Replacing the coal-fired boiler by a 139.9 kW heat pump team.
Project in Poland financed by DG Regio

    Statements

    0 references
    565,522.4 zloty
    0 references
    135,725.376 Euro
    13 January 2020
    0 references
    1,046,730.0 zloty
    0 references
    251,215.19999999998 Euro
    13 January 2020
    0 references
    80.0 percent
    0 references
    2 November 2018
    0 references
    31 March 2019
    0 references
    PRZEDSIĘBIORSTWO ROLNE "WEROL" SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
    0 references
    Przedsięwzięcie obejmuje zastąpienie istniejącej kotłowni węglowej o mocy 160 kW przez trzy zespoły pomp ciepła na potrzeby centralnego ogrzewania i przygotowania ciepłej wody użytkowej w budynkach przedsiębiorstwa rolnego WEROL sp. z o.o. Obiekt zlokalizowany jest na terenie miejscowości Chwiram 26, 78-600 Wałcz. Projekt obejmuje technologię dolnego źródła ciepła. Obecnie obiekty przedsiębiorstwa ogrzewane są dzięki konwencjonalnym źródłom energii,środowiskowe oraz wysokie koszty paliwa odbiły się na wnioskodawcy wdrożenie odnawialnych źródeł energii. Dla zapewnienia pozyskiwania energii z gruntu za-projektowano 32 odwierty (kolektory pionowe) o głębokości 100mb każdy. Głębokość projektowanych otworów wynika z budowy geologicznej rejonu usytuowania odwiertów. Energia cieplna pozyskiwana będzie z gruntu przez pionowe wymienniki. W celu ograniczenia liczby przewodów transportujących czynnik grzewczy do budynku zaprojektowano 2 studnie zbiorcze dolnego źródła ciepła. W związku z powyższym energia doprowadzana do budynku transportowana będzie jednym przewodem zbiorczym zasilającym oraz jednym przewodem zbiorczym powrotnym (Polish)
    0 references
    The project involves the replacement of the existing coal-fired boiler with a power of 160 kW by three units of heat pumps for central heating and the preparation of hot water in the buildings of the WEROL sp. z o.o., located in Chwilram 26, 78-600 Walcz. The project includes lower heat source technology. Currently, plants are heated by conventional energy sources, environmental technologies and high fuel costs have affected the applicants’ deployment of renewable energy sources. To ensure energy from the ground, 32 wells (vertical collectors) of 100mb depth were projected. The depth of the projected holes is due to the geological structure of the wells. The heat from the ground will be taken from the ground by the vertical plane. To limit the number of cables transporting the heating factor to the building, 2 units of a lower heat generator are designed for the building. In the light of the above, the energy supplied to the building will be accompanied by a single supply line and a single line for return. (English)
    0 references

    Identifiers

    RPZP.02.09.00-32-A001/17
    0 references