Increasing the use of renewable energy sources as an opportunity to improve the quality of the environment in the commune of Zalesie — Task 1 (Q104666)

From EU Knowledge Graph
Revision as of 09:22, 9 March 2020 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The main objective of the project is to increase the use of RES for improving the quality of the environment and to improve the standard of living of the inhabitants of the municipality. The beneficiary is the Gmina Zalesie and its inhabitants are the target population. Within this framework, only 158 units of solar flat solar collectors for the preparation of hot water will be installed on private buildings with a total rated output of 0.56 MW,...)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Increasing the use of renewable energy sources as an opportunity to improve the quality of the environment in the commune of Zalesie — Task 1
Project in Poland financed by DG Regio

    Statements

    0 references
    1,248,820.0 zloty
    0 references
    299,716.8 Euro
    13 January 2020
    0 references
    1,716,008.46 zloty
    0 references
    411,842.0304 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    3 April 2017
    0 references
    30 June 2018
    0 references
    GMINA ZALESIE
    0 references
    Głównym celem proj. jest zwiększenie stosowania OZE wpływające na poprawę jakości środowiska natur. oraz podniesienie poziomu życia mieszkańców gminy. Beneficjentem proj. jest Gmina Zalesie, a grupę docelową stanowią jej mieszkańcy. W jego ramach zainstalowanych zostanie wyłącznie na budynkach prywatnych 158 szt. zestawów kolektorów słonecznych płaskich do przygotowywania c.w.u. o łącznej mocy znamionowej 0,56 MW, w tym 120 szt. 2-panelowych (79 szt. na dachu i 41 szt. na elewacji), 32 szt. 3-panelowych (24 szt. na dachu i 8 szt. na elewacji) i 6 szt. 4-panelowych (3 szt. na dachu i 3 szt. na elewacji) oraz 34 szt. zestawów powietrznych pomp ciepła kompaktowych zintegrowanych z zasobnikami wody o łącznej mocy znamionowej 0,08 MW (27 szt. z zasobnikiem poj. 200 dm3 oraz 7 szt. z zasobnikiem o poj. 300 dm3). Proj. przyczyni się do zastępowania istniejącej energii z surowców kopalnych produkcją z OZE. Zastosowane rozwiąż. mają na celu wyrównanie kosztu kWh wyprodukowanego z alternatywnych i z tradycyjnych źródeł surowców kopalnych. Wpłynie na realizację celów określonych w POP dla strefy lubelskiej w zakresie poprawy jakości powietrza m.in. poprzez realizacje działań zmierzających do obniżenia emisji z ogrzewania indywid. oraz realizację działań promoc. i eduk. wpływ. na podniesienie świadomości ekolog. mieszk. Instalacje wyposaż. będą w rejestratory danych, które w oparciu o TIK umożliw. pomiar, obsługę monitoring wykorzystywania energii; pozwolą śledzić parametry pracy i ilość wyprod. energii. Platforma intern. umożliwi dokonywanie transakcji on-line (skargi, wnioski, usterki) i będzie posiadała moduł e-learningowy (w celu prom. rozwiązań czystej energii, w tym lokalizowania ośrodków czystej energii na obszarach peryferyjnych) oraz kalkulator oszacowujący wpływ funkcj. gospodarstw domowych na zjawisko globalnego ocieplenia. Celem platformy będzie również stworzenie sytemu zarządzania i monitorowania danych dotyczących energii wyprodukowanej przez inst. OZE. (Polish)
    0 references
    The main objective of the project is to increase the use of RES for improving the quality of the environment and to improve the standard of living of the inhabitants of the municipality. The beneficiary is the Gmina Zalesie and its inhabitants are the target population. Within this framework, only 158 units of solar flat solar collectors for the preparation of hot water will be installed on private buildings with a total rated output of 0.56 MW, of which 120 are. 2-panel (79 on the roof and 41 units on the façade), 32. 3-panel (24 on the roof and 8 units on the façade) and 6 units 4-panel (3 units on the roof and 3 units on the façade) and 34 units of compact heat pumps integrated with water reservoirs with a total rated output of 0.08 MW (27 units with a storage tank). 200 dm³ and 7 units with a holding reserve. 300 dm³). In order to contribute to the replacement of existing fossil energy from renewable raw materials, RES production will contribute. The objective is to align the cost of kWh produced from alternative and traditional fossil raw materials. It will contribute to achieving the objectives of the POP for the Lubelskie zone in terms of improving air quality, inter alia by implementing measures to lower emissions from heating in the area of district heating and by implementing actions aimed at raising awareness of the eco system. The equipment will be equipped with data recorders based on ICT enabling measurement, handling of energy use; keep track of the parameters of the work and quantity of energy production. The platform will enable online transactions (complaints, applications, faults), and it will have an e-learning module (to promote clean energy solutions, including the localisation of clean energy centres in peripheral areas) and the calculator estimating the contribution of households to global warming. The platform will also aim to set up a system to manage and monitor the energy produced by the platform. RES. (English)
    0 references

    Identifiers

    RPLU.04.01.00-06-0045/16
    0 references