Construction of PV installations and associated infrastructure in the project partners’ enterprises. (Q118553)

From EU Knowledge Graph
Revision as of 08:51, 10 March 2020 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The project aims at generating energy from renewable sources in order to increase the production of electricity from renewable sources and thus to reduce the greenhouse gas emissions to the atmosphere. The detailed objectives of the project are set out in Part 2.1 of the Feasibility Study. The project aims to build new infrastructure on the basis of existing buildings and land owned by the project partners’ companies. However, the project concer...)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of PV installations and associated infrastructure in the project partners’ enterprises.
Project in Poland financed by DG Regio

    Statements

    0 references
    646,955.39 zloty
    0 references
    155,269.2936 Euro
    13 January 2020
    0 references
    936,182.52 zloty
    0 references
    224,683.80479999998 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 October 2017
    0 references
    31 May 2019
    0 references
    ZAKŁAD PRODUKCJI MASZYN I URZĄDZEŃ RSM SPÓŁKA Z OGRANICZONA ODPOWIEDZIALNOŚCIĄ
    0 references
    Celem projektu jest wytwarzanie energii ze źródeł odnawialnych Ogólnym celem projektu jest zwiększenie produkcji energii elektrycznej ze źródeł odnawialnych a przez to zmniejszenie emisji gazów cieplarnianych do atmosfery. Szczegółowe cele projektu zostały przedstawione w części 2.1 Studium Wykonalności. Przedmiotem projektu jest budowa nowej infrastruktury jednak w oparciu o istniejące budynki i grunty należące do firm partnerów projektu. Projekt dotyczy budowy nowej infrastruktury jednak w oparciu o istniejące nieruchomości będących w posiadaniu firm partnerów projektu. Nieruchomości te są położone w gminach Mielec, Tuszyn Narodowy i Kolbuszowa. Przedmiotem projektu jest montaż systemów składających się z modułów polikrystalicznych do produkcji energii elektrycznej (o łącznej mocy zainstalowanej 0,19 MW). W skład planowanej instalacji wchodzi łącznie 697 szt. modułów paneli fotowoltaicznych o mocy pojedynczego panelu 280 W, wraz z konstrukcją wsporczą, całym niezbędnym osprzętem i okablowaniem. Łącznie powstanie sześć instalacji dla pięciu podmiotów. Instalacje zostaną przyłączone do istniejącej sieci energetycznej. Podstawowe elementy planowanej instalacji to: - Moduły fotowoltaiczne, falowniki, systemy montażowe – dachowe i gruntowe, okablowanie, rozdzielnice elektryczne, obudowy hermetyczne, system monitoringu. Łączna moc zainstalowana stanowi sumę moce każdej instalacji, która stanowi z kolei iloczyn liczby paneli i mocy pojedynczego panelu. RSM - Liczba modułów (140x 285W= 39,9 kWp). Miel MET - Liczba modułów (123 x 325W = 39,97kWp). Piekarnia Konieczny - Liczba modułów (134 x 285 W= 38,19kWp). Hoke - Liczba modułów (70 x 285 W= 19,95 kWp). Karkut: Instalacja nr 1 - Liczba modułów (116 x 325 W= 37,70 kWp), Instalacja nr 2 - Liczba modułów (61 x 325 W= 19,82 kWp). Wszystkie z instalacji są mikroinstalacjami. Zostaną przyłączone do sieci energ. w ramach już istniejących dla danej nieruchomości przyłączy. Zakończenie realizacji planowane jest na 31.05. (Polish)
    0 references
    The project aims at generating energy from renewable sources in order to increase the production of electricity from renewable sources and thus to reduce the greenhouse gas emissions to the atmosphere. The detailed objectives of the project are set out in Part 2.1 of the Feasibility Study. The project aims to build new infrastructure on the basis of existing buildings and land owned by the project partners’ companies. However, the project concerns the construction of new infrastructure on the basis of existing properties owned by the project partners’ companies. These properties are located in the municipalities of Mielec, National Horns and Kolbusov. The object of the project is the installation of systems consisting of polycrystalline modules for the production of electricity (with a total installed capacity of 0.19 MW). The planned installation consists of a total of 697 modules of solar panels with a single panel power of 280 W, including the support structure, all necessary fittings and wiring. A total of six installations will be created for five entities. The installations will be connected to the existing electricity grid. The basic elements of the planned installation are as follows: — Modular photovoltaics, inverters, installation systems — roof and ground, wiring, switchgear, hermetic housing, monitoring system. The total installed capacity is the sum of the capacity of each installation, which in turn is the product of the number of panels and the power of the single panel. RSM — Number of modules (140x 285W = 39,9 kWp). MET Month — Number of modules (123 x 325W = 39,97kWp). Baker’s bakery — Number of modules (134 x 285 W = 38,19kWp). Hoke — Number of modules (70 x 285 W = 19,95 kWp). Karkut: Installation No 1 — Number of modules (116 x 325 W = 37,70 kWp), Installation No 2 — Number of modules (61 x 325 W = 19,82 kWp). All plants are micro-installations. They will be connected to the energy network. Implementation is planned to be completed at 31.05. (English)
    0 references

    Identifiers

    RPPK.03.01.00-18-0381/17
    0 references