Reconstruction and extension of the wastewater treatment plant in the collector together with technical and accompanying infrastructure (Q112693)

From EU Knowledge Graph
Revision as of 12:03, 9 March 2020 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The implementation shall consist of the following tasks: 1. The upgrade and extension of the waste water treatment plant in Borku.Existing water treatment plant will be upgraded to a mechanical and biological sewage treatment plant based on activated sludge, SBR type with intermittent filling and emptying of reactors, buffer tank and aerobic stabilisation of sediments in a segregated KSO chamber, and drainage and hygienic sediment conditioning,...)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Reconstruction and extension of the wastewater treatment plant in the collector together with technical and accompanying infrastructure
Project in Poland financed by DG Regio

    Statements

    0 references
    2,702,163.72 zloty
    0 references
    648,519.2928 Euro
    13 January 2020
    0 references
    3,910,689.92 zloty
    0 references
    938,565.5808 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    10 February 2016
    0 references
    31 December 2020
    0 references
    GMINA RZEZAWA
    0 references
    Realizacja obejmuje następujące zadania:1. Przebudowę i rozbudowę oczyszczalni ścieków w Borku.Istniejąca oczyszczalnia ścieków zostanie przebudowana na mechaniczno biologiczną oczyszczalnię ścieków działającą w oparciu o osad czynny, typu SBR z okresowym napełnianiem i opróżnianiem reaktorów, zbiornikiem buforowym i tlenową stabilizacją osadów w wydzielonej komorze KTSO oraz odwadnianiem i higienizacją osadów wapnem palonym, z uwzględnieniem wykonania takich prac, jak: zbiornik zlewczy ścieków dowożonych 5,00x5,00x2,00 m; pompownia ścieków; zbiornik buforowy i KTSO projektowany zbiornik dwukomorowy 13,15x5,80x4,00 m; stacja sitopiaskownika i stacja odwadniania osadu na stropie zbiornika buforowego i KTSO 16,75x5,80 m; reaktor SBR istniejący wielokomorowy; budynek socjalny ze sterownią; instalacja elektryczna i automatyka wraz z szafą sterowniczą; rurociągi technologiczne; naprawa ogrodzenia; uzupełniające nasadzenie zieleni; asfaltowanie nawierzchni placu manewrowego; rozruch oczyszczalni i wyposażenieEfektem ekologicznym rozbudowy i przebudowy oczyszczalni ścieków w Borku będzie:1. Stworzenie możliwości zwiększenia ilości osób podłączonych do kanalizacji: obecnie 1750 RLM i Qśrd180 m3d po rozbudowie 2150 RLM i Qśrd260 m3d2. Zwiększenie stopnia oczyszczania ścieków ze względu na ilość RLM 2000 wskaźniki zanieczyszczeń ścieków oczyszczonych: obecnie: BZT5 40 gm3, ChZT 150 gm3, zawiesina ogólna 50 gm3, po rozbudowie: BZT5 25 gm3, ChZT 125 gm3, zawiesina ogólna 35 gm3.Powyższe oznacza, iż oczyszczalnia ta po zakończeniu realizacji projektu będzie spełniać wymagania Dyrektywy Rady 91271EWG z 21.05.1991 i Rozporządzenia Ministra Środowiska z 18.11.2014 Dz. U. 2014 poz. 18002. Przeprowadzenie nadzoru inwestorskiego3. Koszt pośrednie4. Opracowanie dokumentacji projektowej5. Opracowanie wniosku aplikacyjneCiąg dalszy w części Q Analizy specyficzne. (Polish)
    0 references
    The implementation shall consist of the following tasks: 1. The upgrade and extension of the waste water treatment plant in Borku.Existing water treatment plant will be upgraded to a mechanical and biological sewage treatment plant based on activated sludge, SBR type with intermittent filling and emptying of reactors, buffer tank and aerobic stabilisation of sediments in a segregated KSO chamber, and drainage and hygienic sediment conditioning, including the execution of such works, as follows: sewage catchment area feeder to 5,00x5,00x2.00 m; sewage pumping station; buffer tank and KSSO designed two-chamber vessel 13,15x5,80x4.00 m; sitsandbox station and pellet drainage station of buffer tank and KSSO 16,75x5.80 m; a SBR reactor, existing multi-compartment; a social building with steering gear; electrical installation and automation, in conjunction with the control cabinet; technology pipelines; repairing fencing; supplementary green plantings; paving the pavement of the manoeuvring area; starting the plant and equipped with an ecological plan for the extension and conversion of the sewage treatment plant in the bork, will be: 1. Creating an opportunity to increase the number of persons connected to the sewerage system: currently 1750 p.e. and 180 M3D, after development of 2150 p.e. and with 260 m3d2. To increase the treatment of waste water due to the amount of 2000 p.e. of the waste water treated: currently: BOD5 40 gm3, COD 150 gm3, total suspension 50 gm3, after development: BZT5 25 gm3, COD 125 gm3, total suspension 35 gm3.For this plant, this treatment plant will comply with the requirements of Council Directive 91271/EEC of 21.05.1991 and of the Decree of the Minister for the Environment of 18.11.2014 Journal of Laws 2014, item 18002. Investment surveillance (3). Indirect cost 4. Development of project documentation 5. Development of the application motion in part Q Specific analyses. (English)
    0 references

    Identifiers

    RPMP.05.03.02-12-0978/17
    0 references