Construction of gas network medium pressure Kutno-Krośniewice with the gas station (Q86145)

From EU Knowledge Graph
Revision as of 10:19, 4 March 2020 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The project consists of the construction of a medium-pressure medium and a reductive gas station, together with the installation of AKPiA and a telemetric system, and the connection of facilities to the gas supply system.Basic parameters planned for the construction of the gas pipeline:225 PE L = 14 320 m and the PE 180 L = 10 940 m pipeline.Basic parameters of the intended reducing station:— The skills of Q = 2000 Nm3/h — With an MOPSC of 5,5 M...)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of gas network medium pressure Kutno-Krośniewice with the gas station
Project in Poland financed by DG Regio

    Statements

    0 references
    4,775,023.75 zloty
    0 references
    1,146,005.7 Euro
    13 January 2020
    0 references
    9,706,926.6 zloty
    0 references
    2,329,662.3839999996 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    30 June 2017
    0 references
    31 August 2018
    0 references
    DUON DYSTRYBUCJA SP. Z O.O.
    0 references

    52°15'22.0"N, 19°10'8.0"E
    0 references

    52°11'15.0"N, 19°26'48.1"E
    0 references

    52°14'31.6"N, 19°17'13.2"E
    0 references
    Projekt polega na budowie gazociągu średn. ciśnienia i stacji gazowej redukcyjnej I°, wraz z instalacją AKPiA oraz telemetryczną, oraz podłączeniu obiektów do systemu dyspozycji gazem. Podstawowe parametry planowanego do wybudowania gazociągu: Gazociąg Dz225 PE L= 14320m i Gazociąg Dz180 PE L= 10940m. Podstawowe parametry planowanej stacji redukcyjnej: - Przepustowość Q = 2000 Nm3/h - Maks. ciśn. dolotowe MOPwej = 5,5 MPa - Maks. ciśn. wyjściowe MOPwyj = 0,5 MPa - Min. ciśn. wyjściowe Pwyjmin = 0,15 MPa (Polish)
    0 references
    The project consists of the construction of a medium-pressure medium and a reductive gas station, together with the installation of AKPiA and a telemetric system, and the connection of facilities to the gas supply system.Basic parameters planned for the construction of the gas pipeline:225 PE L = 14 320 m and the PE 180 L = 10 940 m pipeline.Basic parameters of the intended reducing station:— The skills of Q = 2000 Nm3/h — With an MOPSC of 5,5 MPa, with an MOPSC of 0,15 MPa = 0,5 MPa (English)
    0 references

    Identifiers

    POIS.07.01.00-00-0026/16
    0 references