Construction of a pressure sewage system in Gostynia (Pszczyńska Street, Moderate, Rybnicka, Rybnicki, Forestry and acacia) with the reconstruction of the water mains on a graduated street (Q124207)

From EU Knowledge Graph
Revision as of 10:21, 10 March 2020 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The object of the project is the construction of a pressure sewage system in the area of Gostyń with a total length of 7 588 m and the reconstruction of the water supply network in a 1 585.2 m graduated street. as a result of the project, a total of 464 inhabitants will be connected to the sewage network, while 100 inhabitants will benefit from the reconstructed water supply., Adding English summary)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of a pressure sewage system in Gostynia (Pszczyńska Street, Moderate, Rybnicka, Rybnicki, Forestry and acacia) with the reconstruction of the water mains on a graduated street
Project in Poland financed by DG Regio

    Statements

    0 references
    3,005,158.0 zloty
    0 references
    721,237.9199999999 Euro
    13 January 2020
    0 references
    4,933,405.54 zloty
    0 references
    1,184,017.3296 Euro
    13 January 2020
    0 references
    81.95 percent
    0 references
    7 July 2016
    0 references
    10 August 2018
    0 references
    GMINA WYRY
    0 references

    50°8'5.6"N, 18°53'55.3"E
    0 references
    Przedmiotem projektu jest budowa kanalizacji sanitarnej ciśnieniowej na terenie miejscowości Gostyń o łącznej długości 7 588 m oraz przebudowa sieci wodociągowej na ulicy Miarowej o długości 1 585,2 m. W wyniku realizacji projektu do sieci kanalizacyjnej podłączonych zostanie 464 mieszkańców, natomiast z przebudowanego wodociągu będzie korzystało 100 mieszkańców. (Polish)
    0 references
    The object of the project is the construction of a pressure sewage system in the area of Gostyń with a total length of 7 588 m and the reconstruction of the water supply network in a 1 585.2 m graduated street. as a result of the project, a total of 464 inhabitants will be connected to the sewage network, while 100 inhabitants will benefit from the reconstructed water supply. (English)
    0 references

    Identifiers

    RPSL.05.01.01-24-0765/16
    0 references