ČOV and sewers Malovice and Malovičky (Q61205)

From EU Knowledge Graph
Revision as of 11:24, 26 February 2020 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The current status of the wastewater treatment system in Malovice and Maloviáček is unsatisfactory. The treatment of sewage is carried out in a septic tank and the sewer leads to a wall to Malvoke. It is proposed that a new waste water treatment plant (capacity of 400 EO) be built up with the capture of current outlets through the reclining assemblies built on strikes of the sewers. The connection of the sewage network from Malvic to Maloviček w...)
Jump to navigation Jump to search
Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
ČOV and sewers Malovice and Malovičky
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    16,865,251.2 Czech koruna
    0 references
    674,610.048 Euro
    10 January 2020
    0 references
    26,455,296.0 Czech koruna
    0 references
    1,058,211.84 Euro
    10 January 2020
    0 references
    63.75 percent
    0 references
    31 July 2021
    0 references
    Obec Malovice
    0 references
    0 references

    49°2'46.54"N, 14°11'53.66"E
    0 references
    38411
    0 references
    Stávající stav systému čištění odpadních vod v Malovicích a Malovičkách je nevyhovující. Čištění splašků probíhá v septicích a kanalizace je vyústěna do Malovického rybníka. Je navrženo vybudování nové ČOV (kapacita 400 EO) s podchycením stávajících volných výustí přes odlehčovací komory vybudované na stávávajících kanalizačních řadech. Propojení kanalizační sítě z Malovic do Maloviček bude zajištěno výtlačným řadem. Na projekt je vydáno SP s plánem nabytí právní moci 31.1.2018. (Czech)
    0 references
    The current status of the wastewater treatment system in Malovice and Maloviáček is unsatisfactory. The treatment of sewage is carried out in a septic tank and the sewer leads to a wall to Malvoke. It is proposed that a new waste water treatment plant (capacity of 400 EO) be built up with the capture of current outlets through the reclining assemblies built on strikes of the sewers. The connection of the sewage network from Malvic to Maloviček will be secured by a push line. The project is issued with a SP with an entry into force of 31.1.2018. (English)
    0 references

    Identifiers

    CZ.05.1.30/0.0/0.0/17_071/0007281
    0 references