Revitalisation and reduction of energy intensity in the building houses Opletas 27, 29, Adamov (Q75864)

From EU Knowledge Graph
Revision as of 06:22, 27 February 2020 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The aim of the project’s Revitalisation and for the improvement of the energy performance of the building houses Opletalova 27, 29, Admov is mainly thermal energy saving through the insulation of the building envelope, the opening of the land area of the house, the entrance to the ground apartments (will be carried out by using the ceiling of the 1 rd underground level). This will include additional costs for the improvement of the technical con...)
Jump to navigation Jump to search
Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Revitalisation and reduction of energy intensity in the building houses Opletas 27, 29, Adamov
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    1,095,015.0 Czech koruna
    0 references
    43,800.6 Euro
    10 January 2020
    0 references
    3,650,050.0 Czech koruna
    0 references
    146,002.0 Euro
    10 January 2020
    0 references
    30 percent
    0 references
    23 June 2016
    0 references
    31 January 2019
    0 references
    31 January 2019
    0 references
    Společenství vlastníků jednotek bytového domu Opletalova 260/27, 402/29, Adamov
    0 references
    0 references
    67904
    0 references
    Cílem projektu Revitalizace a snížení energetické náročnosti bytového domu Opletalova 27, 29, Adamov je především úspora tepelné energie prostřednictvím zateplení obvodového pláště domu, zateplením půdního prostoru domu, zateplením přízemních bytů (bude provedeno zateplením stropu 1. podzemního podlaží). Součástí budou i další náklady na zlepšení technického stavu budovy, a okapového chodníku. (Czech)
    0 references
    The aim of the project’s Revitalisation and for the improvement of the energy performance of the building houses Opletalova 27, 29, Admov is mainly thermal energy saving through the insulation of the building envelope, the opening of the land area of the house, the entrance to the ground apartments (will be carried out by using the ceiling of the 1 rd underground level). This will include additional costs for the improvement of the technical condition of the building and the hood of the pavement. (English)
    0 references

    Identifiers

    CZ.06.2.11/0.0/0.0/16_098/0005818
    0 references