Energy saving measures (Q3060596)
Jump to navigation
Jump to search
Project Q3060596 in Austria
Language | Label | Description | Also known as |
---|---|---|---|
English | Energy saving measures |
Project Q3060596 in Austria |
Statements
80,600.0 Euro
0 references
28 May 2018
0 references
30 November 2019
0 references
Hans J. Fischer GmbH
0 references
10921
0 references
Plant optimisation Wood drying systems, energy saving measures, Red Tower at Pinka (English)
20 July 2021
0 references
Optimisation de l’installation Installations de séchage du bois, mesures d’économie d’énergie, tour rouge à Pinka (French)
27 November 2021
0 references
Plantenoptimalisatie Houtdrooginstallaties, energiebesparende maatregelen, rode toren op de Pinka (Dutch)
29 November 2021
0 references
Anlagenoptimierung Holztrocknungsanlagen, Betr. Energiesparmaßnahmen, Rotenturm an der Pinka (German)
0 references
Ottimizzazione impianti di essiccazione del legno, misure di risparmio energetico, torre rossa sulla Pinka (Italian)
11 January 2022
0 references
Optimización de plantas Plantas de secado de madera, medidas de ahorro de energía, torre roja en la Pinka (Spanish)
12 January 2022
0 references
Rotenturm an der Pinka
0 references
Identifiers
AUST-312
0 references