(10360.14072017.115000115) ENERGY UPGRADING OF AVERAGE SCHOOLS (Q2155742)

From EU Knowledge Graph
Revision as of 11:40, 23 March 2020 by DG Regio (talk | contribs) (‎Created claim: summary (P836): ACTION 1: REPLACEMENT OF EXTERNAL WINDOW FRAMES AND INSTALLATION OF SUNSCREENS, INTERVENTION 2: REPLACEMENT OF THE THERMAL GENERATOR TO BE OPERATED BY SPOGLIENCY 3: INSTALLATION OF SOLAR THERMAL PANELS FOR THE PRODUCTION OF ACSINTERVENTO 4: INSULATION OF SUB-FLOOR INTERVENTION 5: INSULATION OF PIANAINTERVENTION ROOF 6: INSTALLATION OF THERMOSTATIC CONTROL VALVES AND REPLACEMENT OF THE CIRCULAR PUMP INTERVENTO 7: INSTALLATION OF THE SOLAR PLANT P...)
Jump to navigation Jump to search
Project in Italy financed by DG Regio
Language Label Description Also known as
English
(10360.14072017.115000115) ENERGY UPGRADING OF AVERAGE SCHOOLS
Project in Italy financed by DG Regio

    Statements

    0 references
    118,076.4 Euro
    0 references
    393,587.99 Euro
    0 references
    30.0 percent
    0 references
    30 March 2018
    0 references
    30 March 2020
    0 references
    16 November 2020
    0 references
    COMUNE DI SAN VINCENZO
    0 references

    43°46'11.53"N, 11°15'20.09"E
    0 references
    INTERVENTO 1: SOSTITUZIONE DEI SERRAMENTI ESTERNI ED INSTALLAZIONE DI SCHERMATURE SOLARI INTERVENTO 2: SOSTITUZIONE DEL GENERATORE TERMICO A SERVIZIO DEGLI SPOGLIATOIINTERVENTO 3: INSTALLAZIONE DI PANNELLI SOLARI TERMICI PER LA PRODUZIONE DI ACSINTERVENTO 4: COIBENTAZIONE DEL SOLAIO SOTTOTETTO INTERVENTO 5: COIBENTAZIONE DEL SOLAIO DI COPERTURA PIANAINTERVENTO 6: INSTALLAZIONE DI VALVOLE TERMOSTATICHE E SOSTITUZIONE DELLA POMPA DI CIRCOLAZIONEINTERVENTO 7: INSTALLAZIONE DI IMPIANTO SOLARE FOTOVOLTAICOINTERVENTO 8: SOSTITUZIONE DEL GENERATORE TERMICO A SERVIZIO DELLA SCUOLA (Italian)
    0 references
    ACTION 1: REPLACEMENT OF EXTERNAL WINDOW FRAMES AND INSTALLATION OF SUNSCREENS, INTERVENTION 2: REPLACEMENT OF THE THERMAL GENERATOR TO BE OPERATED BY SPOGLIENCY 3: INSTALLATION OF SOLAR THERMAL PANELS FOR THE PRODUCTION OF ACSINTERVENTO 4: INSULATION OF SUB-FLOOR INTERVENTION 5: INSULATION OF PIANAINTERVENTION ROOF 6: INSTALLATION OF THERMOSTATIC CONTROL VALVES AND REPLACEMENT OF THE CIRCULAR PUMP INTERVENTO 7: INSTALLATION OF THE SOLAR PLANT PHOTOVOLTAIINTERVENTO 8: REPLACEMENT OF THE HEATING GENERATOR IN THE SERVICE OF THE SCHOOL (English)
    0 references

    Identifiers