(10360.14072017.115000018) ENERGY EFFICIENCY SECTOR (Q2056941)

From EU Knowledge Graph
Revision as of 09:57, 23 March 2020 by DG Regio (talk | contribs) (‎Created claim: summary (P836): THIS PROJECT? RELATED TO THE UPGRADING AND ENERGY EFFICIENCY OF THE MUNICIPAL GYM BUILDING SITE IN THE SITE OF ITS PREMISES? BIFORCO IN MARRADI (FI). THE ARENA? DIVIDED INTO TWO PARTS OF FACTORY, SEISMICALLY INDEPENDENT: — THE FIRST (BODY) INTENDED FOR SPORT, WITH THE PLANTED AREA OF 23,60 X 37,52 = 887.8 M², FOR AN AVERAGE HEIGHT OF APPROXIMATELY 10 M., HEATED WITH WATER TREATMENT PLANT, INSTALLED ALONG THE TWO PERIMETER WALLS IP? LONG (FOUR PE...)
Jump to navigation Jump to search
Project in Italy financed by DG Regio
Language Label Description Also known as
English
(10360.14072017.115000018) ENERGY EFFICIENCY SECTOR
Project in Italy financed by DG Regio

    Statements

    0 references
    82,557.45 Euro
    0 references
    211,685.76 Euro
    0 references
    39.0 percent
    0 references
    30 March 2018
    0 references
    30 March 2020
    0 references
    16 November 2020
    0 references
    COMUNE DI MARRADI
    0 references
    0 references

    43°46'11.53"N, 11°15'20.09"E
    0 references
    IL PRESENTE PROGETTO ? RELATIVO ALLA RIQUALIFICAZIONE ED EFFICIENTAMENTO ENERGETICO DELL?EDIFICIO ADIBITO AD USO PALESTRA COMUNALE, SITO IN LOCALIT? BIFORCO A MARRADI (FI). IL PALAZZETTO ? DIVISO IN DUE CORPI DI FABBRICA, SISMICAMENTE INDIPENDENTI:- IL PRIMO (CORPO A) DESTINATO ALLA PRATICA SPORTIVA, SUPERFICIE IN PIANTA DI 23,60 X 37,52 = 887,8 MQ, PER UN?ALTEZZA MEDIA DI CIRCA 10 M., RISCALDATO CON IMPIANTO AD AEROTERMI AD ACQUA, INSTALLATI LUNGO LE DUE PARETI PERIMETRALI PI? LUNGHE (QUATTRO PER LATO) AD UN ALTEZZA DI CIRCA 3 M. DA TERRA, ALIMENTATI CON UNICO CIRCUITO IN PARTENZA DAL COLLETTORE DI DISTRIBUZIONE, CHE SI DIVIDE IN DUE RAMI.- IL SECONDO (CORPO B) DESTINATO A SERVIZI E SPOGLIATOI, DI SUPERFICIE COMPLESSIVA IN PIANTA 10,8 X 24,00 = 259,2 MQ., ALTEZZA MOLTO INFERIORE (H INTERNA NETTA = 3,15 M.), RISCALDATO CON RADIATORI TRADIZIONALI IN GHISA, DOTATO INOLTRE DI UN IMPIANTO DI VENTILAZIONE MECCANICA A TUTT?ARIA ESTERNA, COMPOSTO DA UNA UNIT? DI TRATTAMENTO ARIA (U.T.A.) DA 2 (Italian)
    0 references
    THIS PROJECT? RELATED TO THE UPGRADING AND ENERGY EFFICIENCY OF THE MUNICIPAL GYM BUILDING SITE IN THE SITE OF ITS PREMISES? BIFORCO IN MARRADI (FI). THE ARENA? DIVIDED INTO TWO PARTS OF FACTORY, SEISMICALLY INDEPENDENT: — THE FIRST (BODY) INTENDED FOR SPORT, WITH THE PLANTED AREA OF 23,60 X 37,52 = 887.8 M², FOR AN AVERAGE HEIGHT OF APPROXIMATELY 10 M., HEATED WITH WATER TREATMENT PLANT, INSTALLED ALONG THE TWO PERIMETER WALLS IP? LONG (FOUR PER SIDE) AT A HEIGHT OF APPROXIMATELY 3 M. FROM THE GROUND, SUPPLIED WITH A SINGLE CIRCUIT FROM THE DISTRIBUTION COLLECTOR, DIVIDED INTO TWO RAMI- UNITS (THE SECOND BODY (B) INTENDED FOR SERVICES AND CHANGING ROOMS, THE TOTAL AREA IN PLANT 10,8 X 24,00 = 259.2 M². AIR TREATMENT (U.T.A.) FROM 2 (English)
    0 references

    Identifiers