Energy modernisation of the Municipality of Kaposmeter (Q3950578)

From EU Knowledge Graph
Revision as of 03:57, 15 February 2022 by DG Regio (talk | contribs) (‎Changed an Item: fix budget)
Jump to navigation Jump to search
Project Q3950578 in Hungary
Language Label Description Also known as
English
Energy modernisation of the Municipality of Kaposmeter
Project Q3950578 in Hungary

    Statements

    0 references
    0 references
    22,801,201.8 forint
    0 references
    64,459.0 Euro
    0.002827 Euro
    15 February 2022
    0 references
    27,176,641.0 forint
    0 references
    76,828.36 Euro
    0.002827 Euro
    15 February 2022
    0 references
    83.9 percent
    0 references
    1 October 2017
    0 references
    31 December 2018
    0 references
    KAPOSMÉRŐ KÖZSÉGI ÖNKORMÁNYZAT
    0 references
    0 references

    46°21'35.57"N, 17°42'21.28"E
    0 references
    Kaposmérő központjának meghatározó építészeti eleme a Polgármesteri Hivatal épülete. Egyszerű szögletes formája, lapos-tetős, idejét múlt megjelenése kirí a környezetéből. Időről időre visszatér a gondolat, hogy az épületet a környezetéhez kellene szelídíteni. A magas tetős megoldás mellett nemcsak azért döntöttünk, mert a falusias környezetbe jól illeszkedik, hanem azért is, mert a jelenlegi tető szigetelése folyamatos karbantartást igényelne. Az épület külső határoló szerkezei közül a lapos tető utólagos szigetelését tervezzük a pályázatból melyhez járulékos munkaként tervezzük az épületre magas tető ráépítését a meglévő napelemes rendszer áthelyezését, villámvédelmet. A tető ráépítéssel kialakított tér továbbra is beépítetlen, fűtetlen marad, de ezzel a műszaki megoldással a tető beázások teljesen megszűnnének, illetve az épület nyári passzív hő védelme is jelentősen javulni. A meglévő lapos tető utólagos vízzáró szigetelése hasonló kivitelezési költségből valósulna meg, mint a magas tető ráépítés , az épület külső megjelenése is jelentősen javulna, ezért választottuk ezt a műszaki megoldást. A tervezett építési munka " jelentős felújításnak " minősül, mivel az összes külső határoló szerkezetek 35 %-t jelenti. A hiányzó projektarányos akadálymentesítési feladatokat elvégezzük, a külső akadálymentesítés már részben saját, részben támogatásból elkészült. A földszinti akadálymentes WC kialakítható. Az önállóan támogatható tevékenységek közül a pályázati felhívás 3.1.1.a) pontja szerinti az önkormányzati épület külső határoló szerkezetének ( záró födém ) korszerűsítése a cél. Az önállóan nem támogatható tevékenységek közül nincs tervezve Az önállóan nem támogatható, kötelezően megvalósítandó tevékenységek 3.1.3.a ) a még hiányzó akadálymentesítés 3.1.3.c) nyilvánosság biztosítása 3.1.3.d )képzési anyag kidolgozása, képzés tartása A magvalósítás során betartjuk a környezetvédelmi és esélyegyenlőségi jogszabályokat, megőrizzük a projekt által érintett területen a védett természeti és kulturális értékeket, a fennálló vagy a beruházás során keletkezett környezeti kárt és az esélyegyenlőség szempontjából jogszabályba ütköző nem megfelelőséget megszüntetjük A fejlesztéshez kapcsolódó nyilvános eseményeken , kommunikációban és viselkedésben kifejezzük az esélytudatosságot, nem közvetítünk szegregációt, csökkentjük a csoportokra vonatkozó meglévő előítéleteket. 1.1 .A projekt energia megtakarításra irányuló célja illeszkedik a a Nemzeti Épületenergetikai Stratégiájához 1.2.A projekt illeszkedése a pályázati kiíráshoz. 1.3.A fejlesztés után csökken az épület primerenergia fogyasztása 1.4. ÜHG kibocsátás csökken 1.5. Az épület a melléklet tulajdoni lap alapján az Önkormányzat tulajdonában van. 1.6.Az épületben nincs azbeszt. 1.7. Vállaljuk a az arányosított akadálymentesítést. 2.1.Energtikai tanúsítvány elkészült a meglévő állapotra. 2.2. Az épület a felújítás után megfelel a „DD” –korszerűt megközelítő energetikai minősítésnek. 2.3. A projektre nem releváns 3.1. A projekt befejezésére a megyei önkormányzat a SEAP/SECAP akció tervhez való illeszkedés bemutatása kerül. 3.2. Az épület rendelkezik a tervezett állapotra vonatkozó energetika számításokkal. 3.3. Az önkormányzat és a támogatási kérelem tárgya nem tartozik a jelen felhívás 4.2. pontja, valamint az ÁÚF dokumentum 2. pontja alatt meghatározott kizáró okok alá. 3.4. Vállaljuk a Felhívás 3.2 és a 3.4. pontban meghatározott előírások teljesítését. A tervezett projektnek nincs előrelátható klíma kockázata. A pályázatot a rendelkezésre álló forráson belül az 1.2 pont szerinti " minden megyén belüli jogosult számára elkülönített indikatív keretösszeg " terhére nyújtjuk be. A projekt nem tartozik a környezeti hatásvizsgálati és az egységes környezethasználati engedélyről szóló 314/2005. (XII.25.) Korm. rendelet hatálya alá . 4.4.1.1. A projekt célja - energiahatékonyság növelése, színvonalas közigazgatási feladat ellátás - illeszkedik a Somogy megye területfejlesztési programjának célrendszeréhez 4.4.1.2. A projekt során helyi energiatermelő berendezés telepítésére nem kerül sor de az energiatakarékosság elve teljesül. 4.4.2.1. A tervezett infrastrukturális beruházást követő szemléletformáló tájékoztatót lakossági fórum keretében tervezzük, így széles korosztály (aktív korúak, idősek) ismerheti meg az energiatakarékossági, energiahatékonysági eredményeket. 4.4.3.1: 4.4.3.2 A projekt hozzájárul az energiaköltségek csökkentéséhez, de helyi energiatermelő berendezést nem terveztünk, mivel az épület már elektromos áramot termelő napelemmel rendelkezik. 4.4.4.1. A fejlesztés új munkahelyet nem teremt. 4.4.5.1. A projekttel a korszerű anyagokkal felújított Hivatal épület színvonalas helyi közigazgatási feladat ellátást biztosít helyben. 4.4.5.2. A projekt elősegíti a klímabarát építészeti megoldások elterjesztését. - Műszaki-szakmai eredmények: födém szigetelés 311,4 (Hungarian)
    0 references
    The main architectural element of Kapos Meter’s centre is the building of the Mayor’s Office. Its simple rectangular form, flat-roofed, its past appearance is quite clear from its surroundings. From time to time, the idea that the building should be tamed to its surroundings comes back. The high roof solution was decided not only because it fits well into the rural environment, but also because the insulation of the current roof would require continuous maintenance. From the external boundaries of the building we plan the retrospective insulation of the flat roof from the tender, to which we plan the installation of a high roof on the building as an additional work for the relocation of the existing solar panel system and lightning protection. The roof-built space remains unbuilt, unheated, but with this technical solution the roof wetting would be completely eliminated and the protection of the building’s passive heat in the summer would be significantly improved. The subsequent watertight insulation of the existing flat roof would be realised from the same construction cost as the high roof construction, the exterior appearance of the building would be significantly improved, which is why we chose this technical solution. The planned construction work qualifies as a “major renovation”, as it represents 35 % of all external boundaries. We carry out the missing project-proportional accessibility tasks, and external accessibility has already been partly completed with its own and partly supported. The ground floor accessible toilet can be built. Among the activities eligible independently, the objective is to modernise the external demarcation structure (closing floor) of the municipal building as defined in point 3.1.1(a) of the call for proposals. Of the activities that are not eligible independently, mandatory activities 3.1.3(a) the lack of accessibility 3.1.3(c) ensuring publicity 3.1.3(d) development and training of training material. During the implementation, we comply with environmental and equal opportunities legislation, preserve protected natural and cultural values in the area affected by the project, eliminate existing or resulting environmental damage and non-conformity with respect to equal opportunities. In public events, communication and behaviour related to the development, we express the awareness of chances, we do not mediate segregation, we reduce existing prejudices for groups. 1.1.The aim of the project to save energy is in line with the National Building Energy Strategy 1.2.The project fits with the call for proposals. 1.3.After the development, the primary energy consumption of the building decreases 1.4. GHG emissions are reduced 1.5. The building is owned by the Municipality according to the annex title sheet. 1.6.The building has no asbestos. 1.7. We undertake proportional accessibility. 2.1.Energetic certificate has been completed for the existing state. 2.2. After the renovation, the building meets the state-of-the-art energy rating “DD”. 2.3. Not relevant to the project 3.1. At the end of the project, the County Council will present the alignment with the SEAP/SECAP action plan. 3.2. The building has energy calculations for the planned state. 3.3. The municipality and the subject-matter of the grant application do not fall within the exclusion grounds set out in point 4.2 of this notice and under point 2 of the General Conditions Document. 3.4. We undertake to comply with the requirements set out in points 3.2 and 3.4 of the Call. There is no foreseeable climate risk for the planned project. Within the available funding, the proposal will be submitted from the indicative allocation allocated to all beneficiaries in all counties in accordance with point 1.2. The project does not fall within the scope of Article 314/2005 on Environmental Impact Assessment and Single Environmental Use Permit. (XII.25.) Government Decree (XII.25.) 4.4.1.1. The aim of the project — to increase energy efficiency and to perform a high-quality administrative task — is in line with the target system of the regional development programme of Somogy County 4.4.1.2. In the course of the project, local power generation equipment will not be installed, but the principle of energy saving is met. 4.4.2.1. The awareness-raising information following the planned infrastructure investment is planned in the framework of a citizens’ forum, so a broad age group (active age, elderly) can learn about energy saving and energy efficiency results. 4.4.3.1: 4.4.3.2 The project will contribute to reducing energy costs, but no local power generation equipment has been planned, as the building already has a solar element producing electricity. 4.4.4.1. Development will not create new jobs. 4.4.5.1. With the project, the Office building renovated with state-of-the-art materials provides a high-quality local administrative task on the ground. 4.4.5.2. The project promotes the dissemination of climate-friendly... (English)
    9 February 2022
    0 references
    Le principal élément architectural du centre de Kapos Meter est le bâtiment du bureau du maire. Sa forme rectangulaire simple, à toit plat, son aspect passé est tout à fait clair de son environnement. De temps en temps, l’idée que le bâtiment devrait être apprivoisé à son environnement revient. La solution de toit élevé a été décidée non seulement parce qu’elle s’intègre bien dans l’environnement rural, mais aussi parce que l’isolation du toit actuel nécessiterait un entretien continu. À partir des limites extérieures du bâtiment, nous planifions l’isolation rétrospective du toit plat à partir de l’appel d’offres, à laquelle nous planifions l’installation d’un toit haut sur le bâtiment comme un travail supplémentaire pour le déplacement du système de panneaux solaires existants et la protection contre la foudre. L’espace construit sur le toit reste non construit, non chauffé, mais avec cette solution technique, le mouillage du toit serait complètement éliminé et la protection de la chaleur passive du bâtiment en été serait considérablement améliorée. L’isolation étanche ultérieure du toit plat existant serait réalisée à partir du même coût de construction que la construction de toit élevé, l’aspect extérieur du bâtiment serait considérablement amélioré, raison pour laquelle nous avons choisi cette solution technique. Les travaux de construction prévus sont considérés comme une «rénovation majeure», puisqu’ils représentent 35 % de l’ensemble des frontières extérieures. Nous effectuons les tâches d’accessibilité proportionnelles au projet manquantes, et l’accessibilité externe a déjà été partiellement complétée avec sa propre et partiellement soutenue. Les toilettes accessibles au rez-de-chaussée peuvent être construites. Parmi les activités éligibles de manière indépendante, l’objectif est de moderniser la structure de démarcation externe (étage de fermeture) du bâtiment municipal tel que défini au point 3.1.1 a) de l’appel à propositions. Au cours de la mise en œuvre, nous respectons la législation sur l’environnement et l’égalité des chances, préservons les valeurs naturelles et culturelles protégées dans la zone touchée par le projet, éliminent les dommages environnementaux ou résultants et la non-conformité à l’égard de l’égalité des chances. Dans les événements publics, la communication et le comportement liés au développement, nous exprimons la conscience des chances, nous ne méditons pas la ségrégation, nous réduisons les préjugés existants pour les groupes. 1.1.L’objectif du projet d’économies d’énergie est conforme à la stratégie énergétique nationale pour le bâtiment 1.2.Le projet s’inscrit dans l’appel à propositions. 1.3.Après le développement, la consommation d’énergie primaire du bâtiment diminue 1.4. Les émissions de GES sont réduites 1.5. Le bâtiment est la propriété de la municipalité selon la feuille de titre de l’annexe. 1.6.Le bâtiment n’a pas d’amiante. 1.7. Nous entreprenons une accessibilité proportionnelle. 2.1.Certificat énergétique a été rempli pour l’état existant. 2.2. Après la rénovation, le bâtiment répond à la cote énergétique de pointe «DD». 2.3. Sans rapport avec le projet 3.1. À la fin du projet, le conseil du comté présentera l’alignement sur le plan d’action SEAP/SECAP. 3.2. Le bâtiment a des calculs d’énergie pour l’état prévu. 3.3. La commune et l’objet de la demande de subvention ne relèvent pas des motifs d’exclusion énoncés au point 4.2 du présent avis et au point 2 du document relatif aux conditions générales. 3.4. Nous nous engageons à respecter les exigences énoncées aux points 3.2 et 3.4 de l’appel. Il n’y a pas de risque climatique prévisible pour le projet prévu. Dans les limites du financement disponible, la proposition sera soumise à partir de l’allocation indicative allouée à tous les bénéficiaires de tous les comtés, conformément au point 1.2. Le projet n’entre pas dans le champ d’application de l’article 314/2005 relatif à l’évaluation des incidences sur l’environnement et au permis unique d’utilisation environnementale. (XII.25.) Décret gouvernemental (XII.25.) 4.4.1.1. L’objectif du projet — accroître l’efficacité énergétique et accomplir une tâche administrative de qualité — est conforme au système cible du programme de développement régional du comté de Somogy 4.4.1.2. Au cours du projet, les équipements locaux de production d’électricité ne seront pas installés, mais le principe des économies d’énergie est respecté. 4.4.2.1. Les informations de sensibilisation à la suite des investissements prévus dans les infrastructures sont prévues dans le cadre d’un forum des citoyens, de sorte qu’un large groupe d’âge (âge actif, personnes âgées) peut en apprendre davantage sur les économies d’énergie et les résultats en matière d’efficacité énergétique. 4.4.3.1: 4.4.3.2 Le projet contribuera à réduire les coûts énergétiques, mais aucun équipement local de production d’électricité n’a été prévu, étant donné que le bâtiment dispose déjà d’un élément ... (French)
    10 February 2022
    0 references
    Kaposmérő, Somogy
    0 references

    Identifiers

    TOP-3.2.1-15-SO1-2016-00022
    0 references