Complex building energy development in INTECHGENSER Kft. (Q3932152)

From EU Knowledge Graph
Revision as of 21:49, 14 February 2022 by DG Regio (talk | contribs) (‎Changed an Item: fix budget)
Jump to navigation Jump to search
Project Q3932152 in Hungary
Language Label Description Also known as
English
Complex building energy development in INTECHGENSER Kft.
Project Q3932152 in Hungary

    Statements

    0 references
    24,855,984.0 forint
    0 references
    70,267.87 Euro
    0.002827 Euro
    14 February 2022
    0 references
    49,711,968.0 forint
    0 references
    140,535.73 Euro
    0.002827 Euro
    14 February 2022
    0 references
    50.0 percent
    0 references
    5 August 2019
    0 references
    30 June 2021
    0 references
    INTECHGENSER Ipari, Technológiai, Generálkivitelező és Szolgáltató Korlátolt Felelősségű Társaság
    0 references
    0 references

    48°2'9.67"N, 20°49'52.03"E
    0 references
    A támogatási kérelemben jelzett beruházás egy helyszínt érint, melynek a természetbeni elhelyezkedése: Kistokaj, Pesti út 6. - Hrsz: 066/11. A megjelölt ingatlan a pályázó 1/1 tulajdonában áll, annak bejegyzett fióktelephelye. Erre az egy megvalósulási helyszínre lett elkészítve a kötelezően mellékelendő energetikai tanúsítvány és audit dokumentumok. A tárgyi projekt megvalósulása esetén az épület külső homlokzatán 10cm-es vastagságban hőszigetelés kerül elhelyezésre. A tetőhéjazatban 20cm vastagságban kőzetgyapot hőszigetelést helyezünk el. Az épület külső térrel határos nyílászáró szerkezeteinek korszerű cseréje történik 3 rétegű üvegezéssel ellátva. Az épület központi fűtésrendszerre korszerűsítésre kerül. Levegő-víz üzemű hőszivattyúk kerülnek letelepítésre, melyek fan coil egységekre csatlakoznak. Ezek a készülékek biztosítják a hőleadást. A tervezett állapotban az építőmesteri és épületgépészeti korszerűsítésén túl a villamos energia rendszer is korszerűsítésre kerül, napelemes rendszer telepítésével. Az épület tetőszerkezetén egy 50kW-os napelem rendszer kerül letelepítésre. (Hungarian)
    0 references
    The investment indicated in the aid application concerns one location, the location of which is in kind: Kistokaj, Pesti street 6. — Hrs: 066/11. The designated property is owned by the applicant 1/1 and its registered branch office. The mandatory energy certificate and audit documents have been prepared for this single implementation site. If the project is carried out, thermal insulation is placed on the external facade of the building in a thickness of 10 cm. In the roof covering a thickness of 20 cm, stone wool is placed thermally insulating. Modern replacement of the doors and windows adjacent to the outer space of the building is carried out with 3 layers of glazing. The building will be upgraded to a central heating system. Air-to-water heat pumps are installed to connect to fan coil units. These devices provide heat release. In the planned condition, in addition to the modernisation of the building engineer and building engineering, the electricity system will be upgraded with the installation of a solar panel system. A 50 kW solar panel system is installed on the roof of the building. (English)
    8 February 2022
    0 references
    L’investissement indiqué dans la demande d’aide concerne un site, dont le lieu est en nature: Kistokaj, rue Pesti 6. — Heures: 066/11. Le bien désigné appartient au demandeur 1/1 et à son siège social. Le certificat énergétique obligatoire et les documents d’audit ont été préparés pour ce site unique de mise en œuvre. Si le projet est réalisé, l’isolation thermique est placée sur la façade extérieure du bâtiment dans une épaisseur de 10 cm. Dans le toit couvrant une épaisseur de 20 cm, la laine de pierre est placée thermiquement isolant. Le remplacement moderne des portes et des fenêtres adjacentes à l’espace extérieur du bâtiment est effectué avec 3 couches de vitrage. Le bâtiment sera modernisé en un système de chauffage central. Des pompes à chaleur air-eau sont installées pour se connecter aux unités de bobines de ventilateur. Ces dispositifs permettent un dégagement de chaleur. Dans l’état prévu, en plus de la modernisation de l’ingénieur du bâtiment et de l’ingénierie du bâtiment, le système électrique sera modernisé avec l’installation d’un système de panneaux solaires. Un système de panneaux solaires de 50 kW est installé sur le toit du bâtiment. (French)
    10 February 2022
    0 references
    Kistokaj, Borsod-Abaúj-Zemplén
    0 references

    Identifiers

    GINOP-4.1.2-18-2019-00434
    0 references