Building energy upgrade combined with the installation of a solar system at Klímakomplex Kft. (Q3924948)

From EU Knowledge Graph
Revision as of 21:43, 14 February 2022 by DG Regio (talk | contribs) (‎Changed an Item: fix budget)
Jump to navigation Jump to search
Project Q3924948 in Hungary
Language Label Description Also known as
English
Building energy upgrade combined with the installation of a solar system at Klímakomplex Kft.
Project Q3924948 in Hungary

    Statements

    0 references
    0 references
    18,669,738.6 forint
    0 references
    52,779.35 Euro
    0.002827 Euro
    14 February 2022
    0 references
    41,488,308.0 forint
    0 references
    117,287.45 Euro
    0.002827 Euro
    14 February 2022
    0 references
    45.0 percent
    0 references
    4 November 2019
    0 references
    29 January 2021
    0 references
    KLÍMAKOMPLEX Épületgépészeti, Kereskedelmi és Szolgáltató Korlátolt Felelősségű Társaság
    0 references
    0 references

    46°38'37.93"N, 21°16'29.14"E
    0 references
    A fejlesztés előkészítése során az épület felmérésre került, építészetileg és statikailag. Az épület állaga megfelelő, így a beruházás megvalósítását követően sem várhatóak állékonysági problémák. A beruházás során megvalósítani kívánt tevékenységek nem építési engedély kötelesek. A fejlesztés részleteiről az irodaházban levő bérlőkkel egyeztetések kerültek lefolytatásra. A beruházási költségek alátámasztására, 3 független ajánlattevőtől kértünk ajánlatot, így a tervezett költségek a piaci áraknak megfelelőek és reálisak. A projekt megvalósításában részt vevő vállalkozásokkal előzetes szerződés került aláírásra, annak érdekében, hogy a támogatás elnyerését követően haladéktalanul megkezdhető legyen a beruházás. A megvalósítás első lépésében a kötelező nyilvánosság biztosítása érdekében C táblát helyezünk ki, jól látható helyre, majd az új nyílászárók kerülnek beépítésre, valamint a beépítéssel járó javítási munkálatokat valósítjuk meg. Ezt követően a homlokzat hőszigetelése, valamint a tető hőszigetelése készül el. A hőszigetelési munkálatokkal párhuzamosan folyik majd a lámpatestek és a fényforrások cseréje LED-es fényforrásokra, valamint a meglévő alacsony hatásfokú gázkazán, helyett beépítésre kerül a tervezett kondenzációs kazán. A megvalósítás során folyamatos műszaki ellenőrzésre kerül sor. A vállalkozásunk hasonló pályázati projektet még nem valósított meg, így a siker érdekében jelentős tapasztalattal bíró műszaki ellenőrrel (20 év szakmai tapasztalat), valamint projektmenedzsment (10 év szakmai tapasztalat) szervezettel fogunk együttműködni. A beruházás során közel 690 m2 homlokzat 12 cm-es, míg 43,85 m2 5 cm-es polisztirol szigetelést fog kapni, ezen felül a lapostető 329,44 m2-es felülete szintén 10 cm-es polisztirol szigeteléssel lesz ellátva. A fűtés korszerűsítése során egy modern, távfelügyelettel is szerelhető kondenzációs kazán kerül beépítésre. A meglévő fa nyílászáró szerkezetek, alacsony hőáteresztő képességű üveggel ellátott műanyag ablakokra (135 db) és ajtókra (3 db) lesznek lecserélve. Így a 934,8 m2-es fűtött terület éves fűtési költségei előre láthatólag közel negyedére fognak csökkenni. Az épület egészében hagyományos fényforrások (izzó és fénycső) látják el a világítást, így a világítótestek és fényforrások cseréje is indokolt. A beruházás során kizárólag a jelenleg elérhető leg energiatakarékosabb megoldást kívánjuk alkalmazni, így LED fényforrások (235 db beltéri, 1 db kültéri) kerülnek beépítésre. Már a fényforrások cseréjével 20 % körüli villamos áram megtakarítás lesz elérhető, azonban a lapostető adottságait kihasználva 15 kW napelemes rendszer is telepítésre kerül a beruházás során, így az épület villamos áram szükségletének több, mint 90 %-a fog megújuló módon rendelkezésre állni. A projekt megvalósítás teljes szakaszában szakképzett műszaki ellenőri tevékenység kerül lefolytatásra. A beruházás kertében egy eszköz kerül beépítésre, a fűtés korszerűsítése érdekében beszerelendő Viessmann Vitodens 200 kondenzációs kazán. A kazán 60 kW teljesítményű lesz, így az épület teljes egészének korszerű és energiatakarékos fűtése megoldható lesz. A kazán részét képezi egy Vitotronic szabályozó modul is, így akár távolról is menedzselhető a rendszer. A készülék kiemelkedően energiahatékony, energiahatékonysági besorolása: A. (Hungarian)
    0 references
    During the preparation of the development, the building was surveyed architecturally and statically. The consistency of the building is adequate, so no stability problems can be expected after the investment has been completed. The activities to be carried out in the course of the project are not subject to a building permit. The details of the development were discussed with the tenants in the office building. To substantiate the investment costs, we asked 3 independent bidders to offer, so the planned costs are in line with market prices and are realistic. A preliminary contract was signed with the undertakings involved in the implementation of the project in order to allow the investment to start immediately after the aid was received. In the first step of the implementation, in order to ensure mandatory publicity, we put a C sign in a clearly visible place, then the new doors and windows will be installed, as well as the repair works associated with the installation. The thermal insulation of the façade and the thermal insulation of the roof are then completed. In parallel with the thermal insulation works, the replacement of luminaires and light sources will take place with LED light sources and the existing low-efficiency gas boiler will be replaced by the planned condensing boiler. During the implementation, a continuous technical inspection will be carried out. Our company has not yet implemented a similar project, so in order to succeed, we will cooperate with a technical inspector (20 years of professional experience) and project management (10 years of professional experience). During the investment, the façade of almost 690 m² will be 12 cm, while 43.85 m² will receive 5 cm polystyrene insulation. In addition, the 329.44 m² surface of the flat roof will also be equipped with 10 cm polystyrene insulation. During the modernisation of the heating, a modern condensing boiler, which can be equipped with remote monitoring, is installed. Existing wooden doors and windows will be replaced by plastic windows with low heat permeability (135 pieces) and doors (3 pcs). Thus, the annual heating costs of 934.8 m² of heated area are expected to fall by almost a quarter. Throughout the building, conventional light sources (filament and fluorescent lamps) provide lighting, and the replacement of luminaires and light sources is warranted. During the investment we only want to use the most energy-saving solution currently available, so LED light sources (235 indoors, 1 outdoor) will be installed. With the replacement of light sources, electricity savings of around 20 % will be achieved, but using the features of the flat roof, a 15 kW solar panel system will be installed during the investment, so more than 90 % of the building’s electricity demand will be available in a renewable way. A qualified technical inspection activity will be carried out throughout the project implementation phase. In the garden of the investment a device is installed, in order to upgrade the heating, Viessmann Vitodens 200 condensation boiler is to be installed. The boiler will have a power of 60 kW, so modern and energy-saving heating will be possible for the whole building. The boiler also includes a Vitotronic control module, so the system can be managed remotely. The energy efficiency classification of the appliance is highly energy efficient: A. (English)
    8 February 2022
    0 references
    Lors de la préparation de l’aménagement, le bâtiment a fait l’objet d’un arpentage architectural et statique. La cohérence du bâtiment est adéquate, de sorte qu’aucun problème de stabilité ne peut être attendu une fois l’investissement terminé. Les activités à réaliser dans le cadre du projet ne sont pas soumises à un permis de construire. Les détails de l’aménagement ont été discutés avec les locataires de l’immeuble de bureaux. Pour étayer les coûts d’investissement, nous avons demandé à 3 soumissionnaires indépendants d’offrir, de sorte que les coûts prévus sont conformes aux prix du marché et réalistes. Un contrat préliminaire a été signé avec les entreprises impliquées dans la mise en œuvre du projet afin de permettre à l’investissement de commencer immédiatement après la réception de l’aide. Dans la première étape de la mise en œuvre, afin d’assurer une publicité obligatoire, nous mettons un panneau C dans un endroit clairement visible, puis les nouvelles portes et fenêtres seront installées, ainsi que les travaux de réparation associés à l’installation. L’isolation thermique de la façade et l’isolation thermique du toit sont ensuite complétées. Parallèlement aux travaux d’isolation thermique, le remplacement des luminaires et des sources lumineuses par des sources lumineuses à DEL et la chaudière à gaz à faible efficacité existante seront remplacées par la chaudière à condensation prévue. Au cours de la mise en œuvre, une inspection technique continue sera effectuée. Notre société n’a pas encore mis en œuvre un projet similaire, donc pour réussir, nous coopérerons avec un inspecteur technique (20 ans d’expérience professionnelle) et la gestion de projet (10 ans d’expérience professionnelle). Lors de l’investissement, la façade de près de 690 m² sera de 12 cm, tandis que 43,85 m² recevront une isolation en polystyrène de 5 cm. En outre, la surface de 329,44 m² du toit plat sera également équipée d’une isolation en polystyrène de 10 cm. Lors de la modernisation du chauffage, une chaudière à condensation moderne, qui peut être équipée d’une télésurveillance, est installée. Les portes et fenêtres en bois existantes seront remplacées par des fenêtres en plastique à faible perméabilité thermique (135 pièces) et des portes (3 pièces). Ainsi, les coûts de chauffage annuels de 934,8 m² de surface chauffée devraient diminuer de près d’un quart. Dans l’ensemble du bâtiment, des sources lumineuses conventionnelles (lampes à incandescence et lampes fluorescentes) assurent l’éclairage, et le remplacement des luminaires et des sources lumineuses est justifié. Au cours de l’investissement, nous voulons seulement utiliser la solution la plus économe en énergie actuellement disponible, de sorte que des sources de lumière LED (235 à l’intérieur, 1 extérieur) seront installées. Avec le remplacement des sources lumineuses, des économies d’électricité d’environ 20 % seront réalisées, mais grâce aux caractéristiques du toit plat, un système de panneaux solaires de 15 kW sera installé au cours de l’investissement, de sorte que plus de 90 % de la demande d’électricité du bâtiment sera disponible de manière renouvelable. Une activité d’inspection technique qualifiée sera menée tout au long de la phase de mise en œuvre du projet. Dans le jardin de l’investissement un dispositif est installé, afin d’améliorer le chauffage, Viessmann Vitodens 200 chaudière à condensation doit être installé. La chaudière aura une puissance de 60 kW, de sorte que le chauffage moderne et économe en énergie sera possible pour l’ensemble du bâtiment. La chaudière comprend également un module de commande Vitotronic, de sorte que le système peut être géré à distance. La classification de l’efficacité énergétique de l’appareil est très efficace sur le plan énergétique: A. (French)
    10 February 2022
    0 references
    Gyula, Békés
    0 references

    Identifiers

    GINOP-4.1.1-8-4-4-16-2017-00162
    0 references