Closure of Wastewater Sanitation Systems Connection to the sewage treatment plant of Pedrogão Grande (Tojeira, Valongo and Lord of the Afflicted) (Q2982804)

From EU Knowledge Graph
Revision as of 11:42, 22 January 2022 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in es, and other parts: Adding Spanish translations)
Jump to navigation Jump to search
Project Q2982804 in Portugal
Language Label Description Also known as
English
Closure of Wastewater Sanitation Systems Connection to the sewage treatment plant of Pedrogão Grande (Tojeira, Valongo and Lord of the Afflicted)
Project Q2982804 in Portugal

    Statements

    0 references
    324,514.0 Euro
    0 references
    381,781.0 Euro
    0 references
    85.0 percent
    0 references
    6 January 2020
    0 references
    31 August 2021
    0 references
    APIN - EMPRESA INTERMUNICIPAL DE AMBIENTE DO PINHAL INTERIOR, E.I.M., S.A.
    0 references
    Q3054883 (Deleted Item)
    0 references
    0 references

    39°55'1.06"N, 8°8'44.02"W
    0 references
    Através de e-mail de 03-12-2019 o Beneficiário alterou a solução inicial e a operação passou a incluir a execução de 3,9 km de coletores gravíticos, 1 estação elevatória, 0,75 km de condutas elevatórias e 107 ramais domiciliários com ligação ao Subsistema de Saneamento de Pedrógão Grande e tratamento final na ETAR de Pedrógão Grande. (Portuguese)
    0 references
    Through e-mail of 03-12-2019 the Beneficiary changed the initial solution and the operation began to include the execution of 3.9 km of gravitic collectors, 1 lift station, 0.75 km of lifting ducts and 107 branches of home with connection to the Great Pedrógão Sanitation Subsystem and final treatment in the treatment plant of Pedrógão Grande. (English)
    9 July 2021
    0 references
    Par e-mail du 03-12-2019, le bénéficiaire a modifié la solution initiale et l’opération a commencé à inclure l’exécution de 3,9 km de collecteurs gravitiques, une station de levage, 0,75 km de tuyaux de levage et 107 branches résidentielles avec raccordement au sous-système d’assainissement Pedrógão Grande et traitement final à la Pedrógão Grande WWTP. (French)
    7 December 2021
    0 references
    Durch E-Mail vom 03-12-2019 änderte der Begünstigte die ursprüngliche Lösung und der Betrieb begann mit der Ausführung von 3,9 km gravitischen Kollektoren, 1 Hubstation, 0,75 km Hubrohren und 107 Heimzweigen mit Anbindung an das Subsystem Pedrógão Grande Sanitation und der Endbehandlung am Pedrógão Grande WWTP. (German)
    16 December 2021
    0 references
    Via e-mail van 03-12-2019 veranderde de begunstigde de oorspronkelijke oplossing en de operatie begon met de uitvoering van 3,9 km gravitische verzamelaars, 1 hijsstation, 0,75 km hijspijpen en 107 thuistakken met aansluiting op het Pedrógão Grande Sanitation Subsystem en de laatste behandeling in de Pedrógão Grande WWTP. (Dutch)
    20 December 2021
    0 references
    Con e-mail del 03-12-2019 il beneficiario ha modificato la soluzione iniziale e l'operazione ha cominciato a includere l'esecuzione di 3,9 km di collettori gravitici, 1 stazione di sollevamento, 0,75 km di tubi di sollevamento e 107 filiali con collegamento al sottosistema Pedrógão Grande Sanitation e trattamento finale presso il Pedrógão Grande WWTP. (Italian)
    18 January 2022
    0 references
    A través del correo electrónico de 03-12-2019, el Beneficiario cambió la solución inicial y la operación comenzó a incluir la ejecución de 3,9 km de colectores graviticos, 1 estación de elevación, 0,75 km de tuberías de elevación y 107 sucursales domésticas con conexión al subsistema de saneamiento Pedrógão Grande y tratamiento final en la EDAR Pedrógão Grande. (Spanish)