DIRECTOR FOR THE CASE OF MR VALELLIOLI (Q2021720)

From EU Knowledge Graph
Revision as of 02:56, 11 February 2022 by DG Regio (talk | contribs) (‎Changed an Item: The budget was changed)
Jump to navigation Jump to search
Project Q2021720 in Italy
Language Label Description Also known as
English
DIRECTOR FOR THE CASE OF MR VALELLIOLI
Project Q2021720 in Italy

    Statements

    0 references
    9,636,117.86 Euro
    0 references
    13,285,166.46 Euro
    0 references
    72.53 percent
    0 references
    31 August 2017
    0 references
    24 July 2020
    0 references
    TERNA - RETE ELETTRICA NAZIONALE
    0 references
    0 references

    41°12'22.03"N, 15°33'41.80"E
    0 references
    IL PRESENTE PROGETTO CONCERNE LA MESSA IN OPERA DI N° 1 LINEA IN CAVO 150 KV, CHE COLLEGHERà LA FUTURA S.E. TERNA 'VALLE' CON LA STAZIONE TERNA ESISTENTE DENOMINATA 'PISCIOLI' LE STAZIONI SONO UBICATE, RISPETTIVAMENTE, NEL COMUNE DI ASCOLI SATRIANO (FG) E CANDELA (FG). I COLLEGAMENTI SOPRA DESCRITTI SARANNO REALIZZATI MEDIANTE L'INSTALLAZIONE DI CAVO ALTA TENSIONE XLPE 150 KV, TIPO ARE4H1H5E - 1X 1X1600 MM2 E AVRANNO LUNGHEZZE GEOMETRICHE DI TRACCIATO PARI A 10.400 M CA.E' PREVISTA L'INSTALLAZIONE DI UN SISTEMA DI MONITORAGGIO E GESTIONE DELLA LINEA , BASATO SULL'ACQUISIZIONE DELLA TEMPERATURA DEL CONDUTTORE DELLA LINEA STESSA DENOMINATO DTS (DISTRIBUTED TEMPERATURE SENSING). L'ACQUISIZIONE AVVIENE ATTRAVERSO L'UTILIZZO DI UN SENSORE DISTRIBUITO (FIBRA OTTICA) ED IL SISTEMA REGISTRA, NEL LUNGO PERIODO, LE CONDIZIONI D'UTILIZZO E DI FUNZIONAMENTO DELLA LINEA ELETTRICA IN CAVO INTERRATO, DETERMINANDO LA DURATA DI POSSIBILI SOVRACCARICHI E GENERANDO ALLARMI IN CASO DI COMPORTAMENTO CRI (Italian)
    0 references
    THE PRESENT PROJECT CONCERNS THE IMPLEMENTATION OF N° 1 LINE OF CABLE 150 KV, WHICH COLLEGERIS THE FUTURE S.E. TERNA ‘VALLEY’ WITH THE EXISTING TERNA STATION ‘PIPSCIOLI’ THE STATIONS ARE LOCATED RESPECTIVELY IN THE MUNICIPALITY OF ASCOLI SATRIANO (FG) AND CANDLE (FG). THE ABOVE LINKS WILL BE ACHIEVED BY INSTALLING THE XLPE 150 KV AC VOLTAGE, TYPE AR4H1H5E — 1X 1X1600 MM2 AND WILL HAVE A GEOMETRICAL WIDTH OF 10.400 M CA.THE INSTALLATION OF A SYSTEM FOR MONITORING AND MANAGING THE LINE, BASED ON THE ACQUISITION OF THE TEMPERATURE OF THE LINE HOLDER OF THE LINE CALLED DTS (DISTRIBUTED TEMPERATURES). THE ACQUISITION IS THROUGH THE USE OF A DISTRIBUTED SENSOR (OPTICAL FIBRE) AND THE SYSTEM RECORDS, IN THE LONG TERM, THE CONDITIONS FOR THE USE AND OPERATION OF THE UNDERGROUND CABLE, DETERMINING THE DURATION OF POSSIBLE OVERLOAD AND GENERATING WARNINGS IN THE CASE OF CRI CONDUCT. (English)
    0 references
    CE PROJET CONCERNE LA MISE EN ŒUVRE DE LA LIGNE DE CÂBLE N°1 150 KV, QUI RELIERA LA FUTURE S.E. TERNA «VALLE» À LA STATION TERNA EXISTANTE APPELÉE «PISCIOLI» LES STATIONS SONT SITUÉES RESPECTIVEMENT DANS LA COMMUNE D’ASCOLI SATRIANO (FG) ET DE BOUGIE (FG). LES RACCORDEMENTS DÉCRITS CI-DESSUS SERONT RÉALISÉS PAR L’INSTALLATION D’UN CÂBLE HAUTE TENSION XLPE 150 KV, TYPE ARE4H1H5E — 1X 1X1600 MM2 ET AURA DES LONGUEURS GÉOMÉTRIQUES DE VOIE DE 10400 M CA. IL EST PRÉVU D’INSTALLER UN SYSTÈME DE SURVEILLANCE ET DE GESTION DE LIGNE, BASÉ SUR L’ACQUISITION DE LA TEMPÉRATURE DU CONDUCTEUR DE LA MÊME LIGNE APPELÉE DTS (DÉTECTION DE TEMPÉRATURE RÉPARTIE). L’ACQUISITION SE FAIT PAR L’UTILISATION D’UN CAPTEUR DISTRIBUÉ (FIBRE OPTIQUE) ET LE SYSTÈME ENREGISTRE, À LONG TERME, LES CONDITIONS D’UTILISATION ET DE FONCTIONNEMENT DE LA LIGNE ÉLECTRIQUE DANS LE CÂBLE SOUTERRAIN, EN DÉTERMINANT LA DURÉE DES SURCHARGES POSSIBLES ET EN GÉNÉRANT DES ALARMES EN CAS DE COMPORTEMENT CRI (French)
    14 December 2021
    0 references
    DIT PROJECT BETREFT DE IMPLEMENTATIE VAN KABELLIJN NR. 1 150 KV, DIE DE TOEKOMSTIGE H.E. TERNA „VALLE” ZAL VERBINDEN MET HET BESTAANDE TERNA STATION GENAAMD „PISCIOLI”, DE STATIONS BEVINDEN ZICH RESPECTIEVELIJK IN DE GEMEENTE ASCOLI SATRIANO (FG) EN KAARS (FG). DE HIERBOVEN BESCHREVEN VERBINDINGEN ZULLEN WORDEN GEMAAKT DOOR HET INSTALLEREN VAN XLPE 150 KV HOOGSPANNINGSKABEL, TYPE ARE4H1H5E — 1X 1X1600 MM2 EN ZULLEN GEOMETRISCHE SPOORLENGTEN VAN 10,400 M AC HEBBEN. HET IS DE BEDOELING OM EEN LIJNBEWAKINGS- EN BEHEERSYSTEEM TE INSTALLEREN, GEBASEERD OP DE VERWERVING VAN DE TEMPERATUUR VAN DE GELEIDER VAN DEZELFDE LIJN GENAAMD DTS (VERDEELDE TEMPERATUURDETECTIE). DE OVERNAME VINDT PLAATS DOOR HET GEBRUIK VAN EEN GEDISTRIBUEERDE SENSOR (FIBER OPTISCHE) EN HET SYSTEEM REGISTREERT, OP DE LANGE TERMIJN, DE GEBRUIKSVOORWAARDEN EN WERKING VAN DE STROOMLIJN IN ONDERGRONDSE KABEL, HET BEPALEN VAN DE DUUR VAN MOGELIJKE OVERBELASTINGEN EN HET GENEREREN VAN ALARMEN IN GEVAL VAN CRI-GEDRAG (Dutch)
    23 December 2021
    0 references
    DIESES PROJEKT BETRIFFT DIE UMSETZUNG DER KABELLINIE Nr. 1 150 KV, DIE DIE ZUKÜNFTIGE H.E. TERNA „VALLE“ MIT DER BESTEHENDEN TERNA STATION „PISCIOLI“ VERBINDEN WIRD, DIE SICH IN DER GEMEINDE ASCOLI SATRIANO (FG) UND KERZE (FG) BEFINDEN. DIE OBEN BESCHRIEBENEN VERBINDUNGEN WERDEN DURCH DIE INSTALLATION DES HOCHSPANNUNGSKABELS XLPE 150 KV, TYP ARE4H1H5E – 1X 1X1600 MM2 UND MIT GEOMETRISCHEN GLEISLÄNGEN VON 10.400 M AC HERGESTELLT. ES IST GEPLANT, EIN LINIENÜBERWACHUNGS- UND MANAGEMENTSYSTEM ZU INSTALLIEREN, DAS AUF DER ERFASSUNG DER TEMPERATUR DES LEITERS DER GLEICHEN LINIE DTS (VERTEILTE TEMPERATURMESSUNG) BASIERT. DER ERWERB ERFOLGT DURCH DEN EINSATZ EINES VERTEILTEN SENSORS (FASEROPTIK) UND DIE SYSTEMAUFZEICHNUNG LANGFRISTIG DIE NUTZUNGS- UND BETRIEBSBEDINGUNGEN DER STROMLEITUNG IM UNTERIRDISCHEN KABEL, DIE BESTIMMUNG DER DAUER MÖGLICHER ÜBERLASTUNGEN UND DIE ERZEUGUNG VON ALARMEN IM FALLE EINES CRI-VERHALTENS (German)
    24 December 2021
    0 references
    ESTE PROYECTO SE REFIERE A LA IMPLEMENTACIÓN DE LA LÍNEA DE CABLE N.º 1 150 KV, QUE CONECTARÁ EL FUTURO H.E. TERNA ‘VALLE’ CON LA ESTACIÓN DE TERNA EXISTENTE LLAMADA ‘PISCIOLI’ LAS ESTACIONES SE ENCUENTRAN RESPECTIVAMENTE EN EL MUNICIPIO DE ASCOLI SATRIANO (FG) Y VELA (FG). LAS CONEXIONES DESCRITAS ANTERIORMENTE SE REALIZARÁN MEDIANTE LA INSTALACIÓN DE CABLE XLPE 150 KV DE ALTA TENSIÓN, TIPO ARE4H1H5E — 1X 1X1600 MM2 Y TENDRÁ LONGITUDES GEOMÉTRICAS DE VÍA DE 10,400 M AC. SE PLANEA INSTALAR UN SISTEMA DE MONITOREO Y GESTIÓN DE LÍNEAS, BASADO EN LA ADQUISICIÓN DE LA TEMPERATURA DEL CONDUCTOR DE LA MISMA LÍNEA LLAMADA DTS (DETECCIÓN DE TEMPERATURA DISTRIBUIDA). LA ADQUISICIÓN SE REALIZA MEDIANTE EL USO DE UN SENSOR DISTRIBUIDO (FIBRA ÓPTICA) Y EL SISTEMA REGISTRA, A LARGO PLAZO, LAS CONDICIONES DE USO Y FUNCIONAMIENTO DE LA LÍNEA ELÉCTRICA EN CABLE SUBTERRÁNEO, DETERMINANDO LA DURACIÓN DE POSIBLES SOBRECARGAS Y GENERANDO ALARMAS EN CASO DE COMPORTAMIENTO DE CRI. (Spanish)
    24 January 2022
    0 references
    ASCOLI SATRIANO
    0 references

    Identifiers

    G63G17001390007
    0 references