Environmentally friendly electricity supply to Egri Korona Borház Kft. by solar system Demén 0183/11/A (Q3936179)

From EU Knowledge Graph
Revision as of 12:02, 13 February 2022 by DG Regio (talk | contribs) (‎Changed an Item: fix budget)
Jump to navigation Jump to search
Project Q3936179 in Hungary
Language Label Description Also known as
English
Environmentally friendly electricity supply to Egri Korona Borház Kft. by solar system Demén 0183/11/A
Project Q3936179 in Hungary

    Statements

    0 references
    0 references
    2,172,500.0 forint
    0 references
    6,141.66 Euro
    0.002827 Euro
    13 February 2022
    0 references
    3,950,000.0 forint
    0 references
    11,166.65 Euro
    0.002827 Euro
    13 February 2022
    0 references
    55.0 percent
    0 references
    2 March 2021
    0 references
    28 February 2022
    0 references
    Egri Korona Borház Kereskedelmi és Szolgáltató Korlátolt Felelősségű Társaság
    0 references
    0 references

    47°49'31.84"N, 20°20'16.58"E
    0 references
    A vállalkozás az elmúlt évben 3,888 MW teljesítményű napelem parkot (fotovoltaikus kis erőmű) épített hitelből, amelynek a kivitelezését a Green Plan Energy Kft végezte. Ennek a beruházásnak köszönhetően a vállalkozás különböző, a szakmát jól ismerő szakemberekkel került kapcsolatba, akik segítettek összeállítani, illetve meghatározni a szükséges napelemek mennyiségét és teljesítményét. A műszaki tartalom összeállítását a Green Plan Energy Kft végezte, amely óriási tapasztalattal rendelkezik a fotovoltaikus rendszerek tekintetében. A beruházás költségei részletezésre kerültek a költségek pontban. A beruházás nem építési engedély köteles, hiszen kizárólag napelemes fejlesztés történik. Csatolásra kerül az építési tercdokumentáció, amely vázlatosan tartalmazza a napelemek elhelyezkedését. A vállalkozás meglévő napelem parkja 3,888 MW, 3395 Demjén 0207/21 hrsz alatt épült, kizárólag kereskedelmi energiatermelés céllal. Ez azt jelenti, hogy a napelemek által megtermelt elektromos áram az áramszolgáltató hálózatába termel (közvetlenül az ÉMÁSZ hálózatára), mely a megtermelt mennyiséget közvetlenül megvásárolja társaságunktól. A meglevő napelempark bővítése a meglévő kapacitás figyelembevételével ilyen nagy távolságból nem gazdaságos. Ezek alapján, a napelem park által megtermelt elektromos áram nem szolgálja ki a társaság egyetlen tevékenységéhez szükséges elektromos áram szükségletét sem, az ahhoz szükséges energiamennyiséget, a társaság az áramszolgáltatótól közvetlenül megvásárolja. (Hungarian)
    0 references
    Last year, the company built a 3.888 MW solar cell park (a small photovoltaic power plant) with a loan carried out by Green Plan Energy Kft. Thanks to this investment, the company came into contact with various professionals who knew the profession, who helped to assemble and determine the amount and performance of the solar panels needed. The technical content was compiled by Green Plan Energy Kft, which has a huge experience with photovoltaic systems. The costs of the investment are detailed in the section Costs. The project is not subject to a building permit, since only solar-voltaic development takes place. The construction terc documentation is attached, which outlines the location of the solar panels. The company’s existing solar panel park was built under 3.888 MW, 3395 Demjén 0207/21 for the sole purpose of commercial energy production. This means that the electricity produced by solar panels produces into the electricity supply network (directly to ÉMÁSZ’s network) which buys the production directly from our company. The expansion of the existing solar park, taking into account the existing capacity, is not economical from such a long distance. On this basis, the electricity produced by the solar panel park does not serve the electricity needed for any of the company’s activities, and the amount of energy required for that activity is purchased directly by the company from the electricity supplier. (English)
    8 February 2022
    0 references
    L’année dernière, la société a construit un parc de cellules solaires de 3,88 MW (une petite centrale photovoltaïque) avec un prêt effectué par Green Plan Energy Kft. Grâce à cet investissement, l’entreprise est entrée en contact avec divers professionnels qui connaissaient la profession, qui ont aidé à assembler et à déterminer la quantité et la performance des panneaux solaires nécessaires. Le contenu technique a été compilé par Green Plan Energy Kft, qui a une grande expérience avec les systèmes photovoltaïques. Les coûts de l’investissement sont détaillés dans la section Coûts. Le projet n’est pas soumis à un permis de construire, car seul le développement solaire-voltaïque a lieu. La documentation de construction en terc est jointe, qui décrit l’emplacement des panneaux solaires. Le parc de panneaux solaires existant de l’entreprise a été construit sous 3,88 MW, 3395 Demjén 0207/21 dans le seul but de produire de l’énergie commerciale. Cela signifie que l’électricité produite par les panneaux solaires produit dans le réseau de distribution d’électricité (directement vers le réseau d’ÉMÁSZ) qui achète la production directement auprès de notre société. L’expansion du parc solaire existant, compte tenu de la capacité existante, n’est pas économique à partir d’une telle distance. Sur cette base, l’électricité produite par le parc de panneaux solaires ne dessert pas l’électricité nécessaire à l’une quelconque des activités de l’entreprise et la quantité d’énergie nécessaire à cette activité est achetée directement par l’entreprise auprès du fournisseur d’électricité. (French)
    10 February 2022
    0 references
    Demjén, Heves
    0 references

    Identifiers

    GINOP-4.1.4-19-2020-03507
    0 references