Installation of solar system at Dancsi & Partner Ltd. At Arad road site (Q3935193)

From EU Knowledge Graph
Revision as of 11:36, 13 February 2022 by DG Regio (talk | contribs) (‎Changed an Item: fix budget)
Jump to navigation Jump to search
Project Q3935193 in Hungary
Language Label Description Also known as
English
Installation of solar system at Dancsi & Partner Ltd. At Arad road site
Project Q3935193 in Hungary

    Statements

    0 references
    3,299,725.0 forint
    0 references
    9,328.32 Euro
    0.002827 Euro
    13 February 2022
    0 references
    5,999,500.0 forint
    0 references
    16,960.59 Euro
    0.002827 Euro
    13 February 2022
    0 references
    55.0 percent
    0 references
    1 July 2020
    0 references
    30 June 2022
    0 references
    Dancsi & Társa Általános Kereskedelmi és Szolgáltató Korlátolt Felelősségű Társaság
    0 references
    0 references

    46°12'54.14"N, 20°28'30.36"E
    0 references
    A fejlesztés keretében a Társaság a Makó, Aradi út 119. alatt található szerelőcsarnok-raktár épületére szeretne napelemes rendszert telepíteni. A beruházás kivitelezését a Vállalkozás 2020.07.01-2022.06.30. közötti időtartamban kívánja megvalósítani. A beruházási tevékenység nem engedélyköteles, a tervrajzok, a műszaki leírás rendelkezésre áll. A projekt keretében 17,82 kWp teljesítményű napelemes rendszer telepítése történik meg. A rendszer 1 db háromfázisú, 15 kW névleges teljesítményű Kaco Blueplanet 15.0 TL3 inverterből, továbbá 54 db, 330 Wp névleges teljesítményű, Risen RSM 120-6-330M típusú, monokristályos napelem modulból épül fel, felületük összesen 90,18 m2. A rendszer részét képezik továbbá kábelek/vezetékek elektromos szereléséhez szükséges anyagok, K2 System tetőre telepíthető tartószerkezet. A projekt összköltsége 5.999.500,- Ft, amelyből a támogatás mértéke 3.299.725,- Ft, az önerő nagysága pedig 2.699.775,- Ft. Az önerő a Vállalkozás rendelkezésére áll. (Hungarian)
    0 references
    As part of the development, the Company would like to install a solar system on the building of the assembly hall warehouse located in Makó, Aradi út 119. The Company intends to carry out the project between 01.07.2020-2022.06.30. The investment activity is not subject to authorisation, the drawings and technical specifications are available. The project involves the installation of a 17.82 kWp solar panel system. The system consists of 1 Kaco blueplanet 15.0 TL3 inverter of three-phase, 15 kW rated power, 54, 330 Wp, Risen RSM 120-6-330M monocrystalline solar modules with a total surface area of 90.18 m². The system also includes materials for the electrical installation of cables/wires, K2 System roof support. The total cost of the project is HUF 5999,500, of which the aid rate is HUF 3 399 725 and the amount of own resources is HUF 2.699775. Own resources are at the disposal of the Company. (English)
    8 February 2022
    0 references
    Dans le cadre du développement, la Société souhaite installer un système solaire sur le bâtiment de l’entrepôt du hall d’assemblage situé à Makó, Aradi út 119. La Société a l’intention de réaliser le projet entre le 01.07.2020-2022.06.30. L’activité d’investissement n’est pas soumise à autorisation, les plans et les spécifications techniques sont disponibles. Le projet implique l’installation d’un système de panneaux solaires de 17,82 kWp. Le système se compose de 1 onduleur Kaco blueplanet 15,0 TL3 de puissance nominale triphasée, 15 kW, 54, 330 Wp, Risen RSM 120-6-330M modules solaires monocristallins d’une surface totale de 90,18 m². Le système comprend également des matériaux pour l’installation électrique de câbles/fils, le support de toit du système K2. Le coût total du projet s’élève à 599 500 HUF, dont le taux d’aide est de 3 399 725 HUF et le montant des ressources propres de 2 699 775 HUF. Les ressources propres sont à la disposition de la Société. (French)
    10 February 2022
    0 references
    Makó, Csongrád-Csanád
    0 references

    Identifiers

    GINOP-4.1.4-19-2020-02186
    0 references