Building energy development at TH Invest Kft. (Q3934646)

From EU Knowledge Graph
Revision as of 11:23, 13 February 2022 by DG Regio (talk | contribs) (‎Changed an Item: fix budget)
Jump to navigation Jump to search
Project Q3934646 in Hungary
Language Label Description Also known as
English
Building energy development at TH Invest Kft.
Project Q3934646 in Hungary

    Statements

    0 references
    8,598,476.0 forint
    0 references
    24,307.89 Euro
    0.002827 Euro
    13 February 2022
    0 references
    15,633,594.0 forint
    0 references
    44,196.17 Euro
    0.002827 Euro
    13 February 2022
    0 references
    55.0 percent
    0 references
    1 September 2020
    0 references
    15 July 2022
    0 references
    TH Invest Korlátolt Felelősségű Társaság
    0 references
    0 references

    47°36'41.87"N, 21°20'37.46"E
    0 references
    Jelen projekt keretében a vállalkozás Balmazújváros, Böszörményi út 100. szám alatt található (hrsz.: 3309/6) irodaépületének energetikai fejlesztése tervezett. A projekt részeként sor kerül az épület hőtechnikai adottságainak javítását, hőveszteségének csökkentését célzó, alábbi tevékenységekre (B. I. tevékenység): a) Fűtött és fűtetlen teret elválasztó, nem nyílászáró szerkezetnek minősülő épülethatároló szerkezetek hőszigetelése és b) Fűtött és fűtetlen teret elválasztó, nyílászáró szerkezetnek minősülő épülethatároló szerkezetek cseréje, energia-megtakarítást eredményező korszerűsítése. A projekt keretében az épület külső homlokzatának utólagos hőszigetelése tervezett polisztirol hőszigetelő anyaggal (15 cm AUSTROTHERM AT-H80,) valamint a padlásfödém kerül szigetelésre üveggyapottal (20 cm URSA). A jelenleg nem jó hőtechnikai adottságokkal rendelkező fa nyílászárók kicserélésre kerülnek, Inoutic Eforte, 6 légkamrás műanyag nyílászárók kerülnek beépítésre, melyek 3 rétegű hőszigetelő üvegezéssel rendelkeznek. Energiahatékonyság javítása érdekében sor kerül az épület fűtési, hűtési és használati melegvíz-rendszereinek korszerűsítésére is (B. II. tevékenység). Falon kívül szerelt 2 csöves, nyomott rendszerű, zárt melegvizes fűtési rendszer kialakítása tervezett. Hőleadó lapradiátorok termosztatikus szelepekkel lesznek ellátva. Egy Viessmann Vitodens 100, 26 kW-os kondenzációs gázkazán beépítése tervezett, 60/100-as saját füstelvezető rendszerrel kiépítve. A fejlesztés részét képezi továbbá az A) Megújuló energiafelhasználás növelését célzó tevékenységeken belül a „III. Napelemes rendszer telepítése hálózati villamosenergia-termelés céljából, kizárólag a fejlesztésben érintett épület és az abban folyó gazdasági-termelési folyamatok villamosenergia-ellátásához” tevékenység. Ez a napelemes rendszer 15,39 kW-os teljesítményű lesz. A projekt keretében 54 db 285 Wp teljesítményű polikristályos napelem felhelyezése tervezett (54 * 0,285 kWp = 15,39 kWp), ezekhez kapcsolódóan 1 db Fronius Symo 15.0-3-M 3 fázisú inverter kerül beszerzésre, melyeknek fő feladata hogy a napelemek által előállított egyenáramot a közüzemi hálózatnak megfelelő feszültségű és frekvenciájú váltakozó árammá alakítsa át, amely ezt követően alkalmas az elektromos hálózatban történő továbbításra vagy akár helyi felhasználásra is. Egyéb tevékenységet nem kívánunk elszámolni a projekt keretein belül. A projekt költségvetése a piaci árakhoz igazodóan, reális és takarékos módon lett összeállítva. A Felhívásban található – jelen projekt szempontjából releváns - belső korlát figyelembe lett véve. A projekt megfelelően előkészített, a tervek elkészültek, energetikus bevonásával elkészültek az energetikai tanúsítványok, a szakértői nyilatkozat a releváns energetikai adatokkal kitöltésre került. Lehetséges kivitelező partnerekkel az egyeztetések megtörténtek, az általunk tervezett energetikai fejlesztés a projekt megvalósítási helyszínén kivitelezhető. A tervezett projekt nem építési engedély köteles, ugyanakkor a napelemes rendszer kapcsán az áramszolgáltatóval egyeztetés szükséges. A pályázati felhívás alapján a projektmenedzsmenti szolgáltatás nem számít elszámolható költségnek, ugyanakkor külső, több mint 15 éves projektmenedzsmenti tapasztalattal rendelkező szakcéggel megbízási szerződés került megkötésre e tevékenység sikeres ellátására. (Hungarian)
    0 references
    In the framework of this project, the company is located at Balmazújváros, Böszörményi út 100 (hrsz.: 3309/6) the energy development of its office building is planned. As part of the project, the following activities will be carried out to improve the building’s thermal capabilities and reduce heat loss (Activity B I): a) The thermal insulation of building envelopes other than doors and windows separating heated and unheated spaces, and b) replacement of building envelopes that are considered as doors and windows separating heated and unheated spaces, upgrading them to achieve energy savings. As part of the project, the retrofitting of the exterior facade of the building will be insulated with a polystyrene thermal insulation material (15 cm Austrotherm AT-H80,) and the attic floor is insulated with glass wool (20 cm URSA). Wooden doors and windows, which are currently not equipped with thermal engineering, will be replaced, INOUTIC Eforte, plastic doors and windows with 6 air chambers, which have 3 layers of thermal insulation glazing. In order to improve energy efficiency, the building’s heating, cooling and domestic hot water systems will also be upgraded (Activity B II). The design of a closed hot water heating system with 2 pipes mounted outside the wall is planned. Heat take-off plate radiators will be equipped with thermostatic valves. The installation of a Viessmann Vitodens 100.26 kW condensation gas boiler is designed with its own 60/100 smoke extraction system. The development shall also include, within activities aimed at increasing the use of renewable energy, the "III. Installation of a solar system for the production of electricity in the grid, exclusively for the supply of electricity to the building concerned by the development and the economic-production processes in it' activity. This solar panel system will be powered by 15.39 kW. As part of the project, the installation of 54 polycrystalline solar panels with a power of 285 Wp (54 * 0.285 kWp = 15.39 kWp) will be procured in conjunction with 1 Fronius SYMO 15.0-3-M phase 3 inverter, the main task of which is to convert the DC power produced by the solar panels into an alternating current of voltage and frequency corresponding to the public utility network, which is then suitable for transmission in the power grid or even for local use. We do not intend to account for any other activity within the framework of the project. The project’s budget has been compiled in a realistic and cost-efficient way in line with market prices. The internal limit contained in the Call, which is relevant to the present project, has been taken into account. The project was properly prepared, the plans were completed, the energy certificates were completed with energetic involvement, the expert statement was completed with the relevant energy data. The negotiations with potential implementing partners have taken place, the energy development planned by us can be carried out at the implementation site of the project. The planned project is not required to build a building permit, however, in relation to the solar system, consultation with the electricity supplier is required. According to the call for proposals, the project management service is not considered as an eligible cost, but an external professional company with more than 15 years of experience in project management has been awarded a contract for the successful performance of this activity. (English)
    8 February 2022
    0 references
    Dans le cadre de ce projet, la société est située à Balmazújváros, Böszörményi út 100 (hrsz.: 3309/6) le développement énergétique de son immeuble de bureaux est prévu. Dans le cadre du projet, les activités suivantes seront menées pour améliorer les capacités thermiques du bâtiment et réduire les pertes de chaleur (activité B I): a) L’isolation thermique des enveloppes des bâtiments autres que les portes et les fenêtres séparant les espaces chauffés et non chauffés et b) le remplacement des enveloppes de bâtiment considérées comme des portes et des fenêtres séparant les espaces chauffés et non chauffés, en les modernisant pour réaliser des économies d’énergie. Dans le cadre du projet, la rénovation de la façade extérieure du bâtiment sera isolée à l’aide d’un matériau d’isolation thermique en polystyrène (15 cm Austrotherm AT-H80) et le plancher du grenier est isolé avec de la laine de verre (20 cm URSA). Les portes et fenêtres en bois, qui ne sont actuellement pas équipées d’ingénierie thermique, seront remplacées, INOUTIC Eforte, portes et fenêtres en plastique avec 6 chambres à air, qui ont 3 couches de vitrage d’isolation thermique. Afin d’améliorer l’efficacité énergétique, les systèmes de chauffage, de refroidissement et d’eau chaude du bâtiment seront également modernisés (activité B II). La conception d’un système fermé de chauffage à eau chaude avec 2 tuyaux montés à l’extérieur du mur est prévue. Les radiateurs à plaques de décollage de chaleur seront équipés de vannes thermostatiques. L’installation d’une chaudière à gaz de condensation Viessmann Vitodens 100,26 kW est conçue avec son propre système d’extraction de fumée 60/100. Le développement inclut également, dans le cadre des activités visant à accroître l’utilisation des énergies renouvelables, le «III». Installation d’un système solaire pour la production d’électricité dans le réseau, exclusivement pour la fourniture d’électricité au bâtiment concerné par le développement et les processus de production économique dans son activité. Ce système de panneaux solaires sera alimenté par 15,39 kW. Dans le cadre du projet, l’installation de 54 panneaux solaires polycristallins d’une puissance de 285 Wp (54 * 0,285 kWp = 15,39 kWp) sera achetée en conjonction avec 1 onduleur de phase 3 Fronius SYMO 15.0-3-M, dont la tâche principale est de convertir l’énergie CC produite par les panneaux solaires en courant alternatif de tension et de fréquence correspondant au réseau d’utilité publique, qui est alors adapté pour la transmission sur le réseau électrique ou même pour une utilisation locale. Nous n’avons pas l’intention de rendre compte de toute autre activité dans le cadre du projet. Le budget du projet a été établi de manière réaliste et rentable, conformément aux prix du marché. La limite interne contenue dans l’appel, qui est pertinente pour le présent projet, a été prise en compte. Le projet a été correctement préparé, les plans ont été achevés, les certificats énergétiques ont été complétés avec la participation énergétique, la déclaration d’expert a été complétée avec les données énergétiques pertinentes. Les négociations avec d’éventuels partenaires de mise en œuvre ont eu lieu, le développement énergétique prévu par nous peut être réalisé sur le site de mise en œuvre du projet. Le projet prévu n’est pas requis pour la construction d’un permis de construire, cependant, en ce qui concerne le système solaire, il est nécessaire de consulter le fournisseur d’électricité. Selon l’appel à propositions, le service de gestion de projet n’est pas considéré comme un coût éligible, mais une entreprise professionnelle externe ayant plus de 15 ans d’expérience en gestion de projet a obtenu un contrat pour la bonne exécution de cette activité. (French)
    10 February 2022
    0 references
    Balmazújváros, Hajdú-Bihar
    0 references

    Identifiers

    GINOP-4.1.4-19-2020-01411
    0 references