Building energy renewal of Rainbow Nursery in Tata (Q3951148)

From EU Knowledge Graph
Revision as of 19:13, 10 February 2022 by DG Regio (talk | contribs) (‎Changed an Item: Adding French translations)
Jump to navigation Jump to search
Project Q3951148 in Hungary
Language Label Description Also known as
English
Building energy renewal of Rainbow Nursery in Tata
Project Q3951148 in Hungary

    Statements

    0 references
    40,864,685 forint
    0 references
    112,999.44 Euro
    0.00276521 Euro
    6 December 2021
    0 references
    131,422.058 Euro
    0.0027336256 Euro
    15 December 2021
    0 references
    48,076,100.0 forint
    0 references
    84.999985 percent
    0 references
    1 March 2018
    0 references
    30 November 2021
    0 references
    TATA VÁROS ÖNKORMÁNYZATA
    0 references
    0 references

    47°39'0.32"N, 18°19'5.27"E
    0 references
    A tervezett fejlesztés a Tata Város Önkormányzatának 100%-os tulajdonában és fenntartásában levő, a 2890 Tata, Agostyán út 7. alatt található Tatai Szivárvány Óvoda korszerűsítésére irányul. Az épület átlagos, valamint sok rétegrend esetében rossz hővédelme indokolja a homlokzat és a padlásfödém utólagos hőszigetelését és a rossz hőátbocsátású nyílászárók cseréjét. Az épület gépészeti rendszerei alacsony hatásfokúak, valamint jelentősen avult állapotúak, így azok szükség szerinti cseréje elkerülhetetlen. A projekt közvetlen célja a költséghatékony működési környezet megteremtése, az energiafogyasztás, a CO2 kibocsátás minimalizálása. A megújuló energiaforrások használatával az üvegházhatású gázok kibocsátása csökken, a fosszilis energiafelhasználás csökkentésével hozzájárulunk a környezeti ártalmak mérsékléséhez, ezzel pedig az ország nemzetközi kötelezettségvállalásának teljesítéséhez. A projekt által az épülethasználók környezettudatosságra nevelését is tovább erősítjük. Energetikai szakértő bevonásával és külső szakértő segítségével elkészült a Projekt Terv. Az előkészítési szakaszban amennyiben szükséges, kiviteli tervdokumentáció készül, ami alapján a szükséges engedélyezési eljárás lefolytatásra kerül. Ezt követően közbeszerzési eljárás indul az óvoda energetikai korszerűsítésére vonatkozóan, mely az alábbi építési, kivitelezési munkákat tartalmazza: - külső falazat 16 cm vastagságú EPS hőszigetelése az Agostyán utca felőli homlokzatra kívülről 3 cm vastagságban hőszigetelő vakolat, míg belülről 10 cm Multipor hőszigetelő rendszer kerül kialakításra az épület védett értékeinek szem előtt tartása érdekében; - nyílászárók cseréje műanyag ablakokra és ajtókra, az Agostyán utca felőli homlokzaton fa keretszerkezetű nyílászárókra; - padlásfödém szigetelés 22 cm vastag szálas hőszigetelő rendszerrel; - lapostető szigetelése 22 cm EPS hőszigetelőrendszerrel; - Fűtési rendszer: a régi gázkazán helyére új, kondenzációs gázkazán kerül. A meglévő radiátorokat új, termosztatikus szeleppel ellátott radiátorokra cseréljük. A meglévő gázbojlereket 1 db indirekt fűtésű tároló váltja; - az épület udvar felől tetőszerkezetére egy 1.8 kWp teljesítményű (2 kVA csatlakozási teljesítményű) háztartási méretű kiserőmű kerül kialakításra. Műszaki ellenőr alkalmazása biztosítja a beruházás szakszerű és gazdaságos kivitelezését, az akadálymentesítésre vonatkozó szabályok betartása érdekében rehabilitációs szakmérnököt foglalkoztatunk. A projekt megfelelő megvalósítását több éves tapasztalattal rendelkező belső projektmenedzsment csapat biztosítja. A nyilvánosság tájékoztatása az előírásoknak megfelelően történik. Önállóan támogatható tevékenységek - Utólagos külső oldali szigetelés - Műanyag nyílászáró csere/korszerűsítés - Fa/Fém nyílászáró csere / korszerűsítés - Fűtési / HMV / Hűtési rendszer(ek) korszerűsítése - Napelemes rendszer (napenergiát hasznosító fotovoltaikus rendszerek) Önállóan nem támogatható, kötelezően megvalósítandó tevékenységek - Akadálymentesítés - Nyilvánosság - Képzési anyag Területspecifikus szempontok: 1.1 A fejlesztés a területfejlesztési stratégiai program 6 prioritásából legalább 2-nek a megvalósulásához közvetlenül és igazoltan hozzájárul – igen. 1.2 A projektben fejlesztett intézmény ellátási körzetének nagysága - mikrotérségi szinten valósul meg. 2.1 A fejlesztés olyan épületben/épületegyüttesben valósul meg, melynek energetikai felújítása komplex beavatkozásokat igényel – igen. 3.1 A fejlesztés egy épületen, illetve telephelyen belül több ellátási forma és önkormányzati feladatellátási hely energetikai korszerűsítését is célozza – nem. 4.1 A fejlesztés alap- vagy középfokú oktatási intézményben valósul meg – nem. 4.2 Volt-e jelentős felújítás az épületen, vagy az épületen belül az elmúlt 10 évben – nem. 5.1 A projekt műemlék vagy helyi védelem alatt álló épületet vagy épületet érint – igen, helyi védett. 5.2 A fejlesztés eredményeként az intézmény energetikai besorolása legalább kettő kategóriát javul – igen. 5.3 A pályázó nyilatkozatban vállalja, hogy a felújítás után, annak következtében jelentkező megtakarításait az intézmény további fejlesztésére - különös tekintettel az energiahatékonyságra - használja fel a fenntartási időszakban. – igen. (Hungarian)
    0 references
    The planned development is aimed at modernising the Tata Rainbow Nursery School, which is 100 % owned and maintained by the Municipality of Tata, located at 2890 Tata, Agostyán Road 7. The average and, for many layers, poor heat protection of the building justifies the subsequent thermal insulation of the facade and the attic floor and the replacement of doors and windows with poor heat transmission. The building’s mechanical systems are low-efficiency and significantly volatilised, so their replacement is unavoidable if necessary. The direct objective of the project is to create a cost-effective operating environment, to minimise energy consumption and CO2 emissions. Using renewable energy sources, we reduce greenhouse gas emissions, by reducing fossil energy use, we contribute to reducing environmental harm and thereby meeting the country’s international commitment. Through the project, we will further strengthen the environmental education of building users. The Project Plan was completed with the involvement of an energy expert and with the help of an external expert. During the preparation phase, if necessary, an implementation plan documentation will be prepared, on the basis of which the necessary authorisation procedure will be carried out. A public procurement procedure for the energy modernisation of the kindergarten is then launched, which includes the following construction and construction works: — 16 cm thickness EPS thermal insulation of outer masonry on the outside of the Agostyán street facade 3 cm thickness of thermal insulating plaster, while inside 10 cm Multipor thermal insulation system is designed to keep in mind the protected values of the building; — replacement of doors and windows for plastic windows and doors, windows with wooden frames on the facade of Agostyán Street; — attic roof insulation with 22 cm thick fibrous thermal insulation system; — flat roof insulation with 22 cm EPS thermal insulation system; — Heating system: the old gas boiler is replaced by a new condensation gas boiler. Existing radiators are replaced by new radiators with thermostatic valves. Existing gas boilers are replaced by 1 indirect heating storage; — a small household power plant with a power of 1.8 kWp (2 kVA connection power) will be installed on the roof of the building from the yard. The use of a technical inspector ensures that the project is carried out professionally and economically; in order to comply with the rules on accessibility, we employ a specialist rehabilitation engineer. The proper implementation of the project is ensured by an internal project management team with several years of experience. The public shall be informed in accordance with the rules. Self-eligible activities — Ex-post external insulation — Replacement/upgrading of plastic doors and windows — Replacement of wood/metal doors and windows/upgrading of heating/HMV/cooling system(s) — Solar panel system (solar photovoltaic systems) Compulsory non-eligible activities — Accessibility — Publicity — Training material Area-specific criteria: 1.1 Development directly and verifiably contributes to the realisation of at least 2 of the 6 priorities of the strategic territorial development programme — yes. 1.2 The size of the supply area of the institution developed in the project is implemented at micro-regional level. 2.1 The development takes place in a building/a complex of buildings whose energy renovation requires complex interventions — yes. 3.1 The development also aims at the energy modernisation of several forms of supply and local government tasks within one building or site — not. 4.1 Development takes place in primary or secondary education institutions — not. 4.2 Whether there has been a major renovation in the building or within the building in the last 10 years — no. 5.1 The project concerns a monumental or locally protected building or building — yes, it is locally protected. 5.2 As a result of the development, the institution’s energy classification improves at least two categories — yes. 5.3 In a declaration, the applicant undertakes to use its savings after the renovation and as a result to further improve the institution, in particular energy efficiency, during the maintenance period. yes, I do. (English)
    9 February 2022
    0 references
    Le projet de développement vise à moderniser l’école de pépinière Tata Rainbow, détenue à 100 % par la municipalité de Tata, située au 2890 Tata, route Agostyán 7. La moyenne et, pour de nombreuses couches, la mauvaise protection thermique du bâtiment justifie l’isolation thermique ultérieure de la façade et du plancher grenier et le remplacement des portes et des fenêtres par une mauvaise transmission de chaleur. Les systèmes mécaniques du bâtiment sont peu efficaces et fortement volatilisés, de sorte que leur remplacement est inévitable si nécessaire. L’objectif direct du projet est de créer un environnement opérationnel rentable, de réduire au minimum la consommation d’énergie et les émissions de CO2. En utilisant des sources d’énergie renouvelables, nous réduisons les émissions de gaz à effet de serre, en réduisant la consommation d’énergie fossile, nous contribuons à réduire les dommages environnementaux et, partant, à respecter l’engagement international du pays. Grâce à ce projet, nous renforcerons encore l’éducation environnementale des usagers du bâtiment. Le plan de projet a été complété avec la participation d’un expert en énergie et avec l’aide d’un expert externe. Au cours de la phase de préparation, si nécessaire, une documentation relative au plan de mise en œuvre sera établie, sur la base de laquelle la procédure d’autorisation nécessaire sera menée. Une procédure de passation de marchés publics pour la modernisation énergétique de la maternelle est alors lancée, qui comprend les travaux de construction et de construction suivants: — 16 cm d’épaisseur EPS isolation thermique de la maçonnerie extérieure à l’extérieur de la façade de rue Agostyán 3 cm d’épaisseur de plâtre isolant thermique, tandis qu’à l’intérieur 10 cm système d’isolation thermique multipor est conçu pour garder à l’esprit les valeurs protégées du bâtiment; — remplacement des portes et fenêtres pour fenêtres et portes en plastique, fenêtres avec cadres en bois sur la façade de la rue Agostyán; — isolation de toit grenier avec système d’isolation thermique fibreux de 22 cm d’épaisseur; — isolation de toit plat avec système d’isolation thermique EPS de 22 cm; — Système de chauffage: L’ancienne chaudière à gaz est remplacée par une nouvelle chaudière à gaz à condensation. Les radiateurs existants sont remplacés par de nouveaux radiateurs munis de vannes thermostatiques. Les chaudières à gaz existantes sont remplacées par un stockage à chauffage indirect; — une petite centrale électrique domestique d’une puissance de 1,8 kWp (2 kVA) sera installée sur le toit du bâtiment à partir de la cour. L’utilisation d’un inspecteur technique assure la réalisation professionnelle et économique du projet; afin de respecter les règles d’accessibilité, nous employons un ingénieur spécialisé en réhabilitation. La bonne mise en œuvre du projet est assurée par une équipe interne de gestion de projet ayant plusieurs années d’expérience. Le public est informé conformément aux règles. Activités auto-éligibles — Isolation externe ex post — Remplacement/mise à niveau des portes et fenêtres en plastique — Remplacement des portes et fenêtres en bois/métal/mise à niveau du chauffage/HMV/système(s) de refroidissement — Système de panneaux solaires (systèmes photovoltaïques solaires) Activités obligatoires non admissibles — Accessibilité — Publicité — Matériel de formation Critères spécifiques à la zone: 1.1 Le développement contribue directement et de manière vérifiable à la réalisation d’au moins 2 des 6 priorités du programme stratégique de développement territorial — oui. 1.2 La taille de la zone d’approvisionnement de l’institution développée dans le cadre du projet est mise en œuvre au niveau microrégional. 2.1 Le développement a lieu dans un bâtiment/un complexe de bâtiments dont la rénovation énergétique nécessite des interventions complexes — oui. 3.1 Le développement vise également la modernisation énergétique de plusieurs formes d’approvisionnement et les tâches des collectivités locales au sein d’un bâtiment ou d’un site — et non pas. 4.1 Le développement a lieu dans les établissements d’enseignement primaire ou secondaire — non. 4.2 Qu’il y ait eu une rénovation majeure dans le bâtiment ou à l’intérieur du bâtiment au cours des 10 dernières années — non. 5.1 Le projet concerne un bâtiment ou un bâtiment monumental ou protégé localement — oui, il est protégé localement. 5.2 À la suite de cette évolution, la classification énergétique de l’établissement améliore au moins deux catégories — oui. 5.3 Dans une déclaration, le demandeur s’engage à utiliser ses économies après la rénovation et, partant, à améliorer encore l’institution, en particulier l’efficacité énergétique, pendant la période de maintenance. oui, c’est vrai. (French)
    10 February 2022
    0 references
    Tata, Komárom-Esztergom
    0 references

    Identifiers

    TOP-3.2.1-16-KO1-2017-00007
    0 references