St. Borbála Home Building Energy Renovation in Komló (Q3949925)
Jump to navigation
Jump to search
Project Q3949925 in Hungary
Language | Label | Description | Also known as |
---|---|---|---|
English | St. Borbála Home Building Energy Renovation in Komló |
Project Q3949925 in Hungary |
Statements
396,723,800 forint
0 references
1,275,875.689 Euro
0.0027336256 Euro
15 December 2021
0 references
466,733,882.353 forint
0 references
84.999999 percent
0 references
25 August 2017
0 references
30 September 2019
0 references
KOMLÓ VÁROS ÖNKORMÁNYZAT
0 references
a) projekt célja: A komlói Szent Borbála Otthon épületenergetikai korszerűsítése. b) a projekt tartalma: Önállóan támogatható tevékenységek: - Önkormányzati tulajdonú épület teljes körű homlokzati hőszigetelés, lapostető hőszigetelése és nyílászáró szerkezetek teljes cseréje készül 7/2006 (V. 24.) TNM rendelet követelményeknek megfelelően - Fotovillamos rendszer kialakítása történik Önállóan nem támogatható, választható tevékenységek: - Fosszilis energiahordozó alapú hőtermelő berendezéshez kapcsolódó fűtési és HMV rendszerek korszerűsítése: radiátorok cseréje Önállóan nem támogatható, kötelezően megvalósítandó tevékenységek: - akadálymentesítés: projektarányos akadálymentesítés történik (akadálymentes parkoló, rámpa, illemhely és nyílászárók kialakítása) - azbesztmentesítés: hullámpala eltávolítása révén megtörténik - Nyilvánosság biztosítása: a „Kedvezményezettek tájékoztatási kötelezettségei” alapján történik - képzési anyagok kidolgozása, képzés tartása: a műszaki átadás-átvétel előfeltétele lesz a képzés megtartása energetikus szakértő által. - helyi védettséget megalapozó értékek megőrzése: nem releváns c) a felhívás 3.2 pontjában előírt feltételek teljesülése: 1) a projektre vonatkozó környezetvédelmi és esélyegyenlőségi jogszabályokat betartjuk, a projekt által érintett területen a védett természeti és kulturális értékeket megőrizzük, 2) Az Önkormányzat esélytudatosságot fejez ki: nem közvetít szegregációt, csökkenti a csoportokra vonatkozó meglévő előítéleteket, a projekt nem kirekesztő egyetlen társadalmi csoport számára sem 3) Önálló energetikai rendszert alkotó épület 4) A projekt energetikai központú felmérésen és számításon alapszik 5) a projektnek nincs előre látható klímakockázata 6) g) idősek otthona 7) Arányosítás nem szükséges 8) A tervezési értékek megfelelnek a hatályos TNM rendeletben meghatározott szakmai-műszaki szabályozásnak és a Felhívás vonatkozó követelményeinek, létezik a kiinduló állapotot bemutató energetikai tanúsítvány 9) nem releváns 10) a 176/2008 (VI.30.) Kormányrendelet szerinti energetikai tanúsítvány készül 11) összetett projekt (a fejlesztendő épület épületegyüttesnek minősül) 12) épületenergetikai átvilágítás készült 13) világítástechnikai korszerűsítés nem készül 14-18) nem releváns, mivel nem helyi védett vagy műemlék a fejlesztendő épület 19-23) lásd feljebb 24) a Projekt Terv csatolásra kerül 25) teljesül, hogy -4%<BMR<+4% 26) nem releváns 27) szakirányú műszaki ellenőr költsége betervezésre került a projekt elszámolható költségei között 28) a projekt abszolút mértékben csökkenti az országos ÜHG kibocsátást 29) a feltétel teljesül 30) energetikai tanúsítvány készül a megvalósítást követően is. 31) a jogszabályi környezet változásából fakadó többletköltségeket a projektgazda állja. 32) inverteren mérés megvalósítható 33) időjárás-követő szabályozás épül be 34) heti időprogramozás biztosított lesz 35) rendszerhez való kapcsolódásra lehetőség lesz 36-38) a feltételek teljesülnek – képzésre fordítandó költség betervezésre került 39-41) a támogatást igénylő legkésőbb a fenntartási időszakba lépésig megszerzi a megyei önkormányzat támogató nyilatkozatát arról, hogy a projekt illeszkedik a megye által összefogott SEAP/SECAP stratégia célkitűzéseinek megvalósításához, a beszerzendő eszközök legalább A+ energia besorolásúak, világításkorszerűsítés nem releváns. 42-53) a beruházásban foglalt műszaki tartalom megfelel a felhívás ezen pontjainak. 54-64) nem releváns d) tartalmi értékelési szempontok teljesülése: - A projekt illeszkedik a Nemzeti Energiastratégia 2030 és a Magyarország II. Nemzeti Energiahatékonysági Cselekvési Tervhez is. - a beruházás hozzájárul a primerenergia-fogyasztás és az ÜHG-kibocsátás csökkenéséhez - az érintett épület 100%-ig önkormányzati tulajdonban van - a projektben az építési kivitelezési tevékenység közbeszerzés köteles, a lefolytatása során biztosított lesz a vonatkozó jogszabályi előírásoknak való megfelelés - a projekt nem 10.000 fő alatti településen valósul meg - teljes beruházásra vonatkozóan a pénzügyi belső megtérülési ráta (BMR) -4 % és 4 % közé esik. - a fajlagos korlátok minden tevékenységesetén betartásra kerültek. - Az adott épület fejlesztés előtti energiaigénye meghaladja a 150 kWh/m2a értéket. - A támogatást igénylő a TNM rendelet által definiált „közel nulla” szint elérését vállalja. e) terület-specifikus értékelési szempontok: 1.1. A projekt illeszkedik a Baranya Megyei Területfejlesztési Program 5. prioritásának 4. intézkedéséhez (Helyi energiaforrások felhasználására alapozott energiatermelés- és ellátás). Az intézkedés területi fókusza a megye egész területe. 1.2. 5 pont (30t/év feletti CO2 csökkenés) 2.1 nem releváns 3.1 fejlesztés után az épület BB besorolású lesz 3.2 napelem telepítése valósul meg 4.1 támogatást igénylő vállalja több mint 5 fő hátrányos helyzetű lakos bevonását a projektbe (Hungarian)
0 references
the objective of the project: Building energy modernisation of the Szent Borbála Home in Komló. b) the content of the project: Self-eligible activities: — Complete facade thermal insulation, flat roof thermal insulation and complete replacement of doors and windows are prepared in accordance with the requirements of Decree No 7/2006 of 24 May 2006 of the Minister for National Development — Photovoltaic system is established independently, optional activities: — Modernisation of heating and HMV systems related to fossil fuel-based heat generation equipment: replacement of radiators is not self-eligible, mandatory activities: — accessibility: project-proportional accessibility (accessible parking, ramp, toilet and windows) — asbestos removal: by removing wave shale — Publication: based on the Beneficiary’s information obligations — development of training materials and training: technical handover-take-over will be a prerequisite for training by an energetic expert. — preservation of locally protected values: not relevant (c) compliance with the conditions set out in point 3.2 of the call: 1) we comply with the environmental and equal opportunities legislation applicable to the project, we preserve the protected natural and cultural values in the area covered by the project, 2) The Municipality expresses a sense of opportunity: does not mediate segregation, reduces existing prejudices for groups, and does not exclude any social group of the project 3) Building forming an independent energy system 4) The project is based on an energy-centred survey and calculation 5) The project does not have a foreseeable climate risk 6) g) Home 7) Proportionalisation is not required 8) The planning values comply with the professional-technical regulations and the relevant requirements of the call, as laid down in the current Decree of the Minister for Transport, there is the initial energy certificate 9) non-relevant 10) the energy certificate under Government Decree 176/2008 (VI.30.) is being prepared 11) complex project (the building to be developed is considered as a building complex) 12) building energy screening carried out 13) lighting modernisation is not made 14-18) is not relevant, as no local protected or monument building is to be developed 19-23) see above 24) the Project Plan is attached 25) is not relevant, that -4 %<BMR<+ 4 % 26) non-relevant 27) technical inspector costs have been planned among the eligible costs of the project 28) the project reduces the national GHG emissions in absolute terms 29) the condition is met 30) an energy certificate will be prepared even after implementation. 31) the additional costs resulting from changes in the legislative environment shall be borne by the developer. 32) invertren measurement (available 33) weather tracking regulations will be included 34) weekly time programming will be ensured 35) connection to the system will be possible 36-38) the conditions will be met — the cost to be used for training is planned 39-41) the applicant obtains a statement of support from the county’s government no later than entering the maintenance period, that the project is in line with the objectives of the SEAP/SECAP strategy, the assets to be procured are at least A+ energy graded and lighting modernisation is not relevant. 42-53) the technical content contained in the investment corresponds to these points of the call. 54-64) not relevant (d) fulfilment of substantive assessment criteria: — The project fits the National Energy Strategy 2030 and Hungary II. The National Energy Efficiency Action Plan. — the investment contributes to the reduction of primary energy consumption and GHG emissions — the building concerned is 100 % owned by the municipality — the construction work in the project is subject to public procurement, and compliance with the relevant legal requirements will be ensured during its implementation — the project is not carried out in settlements below 10,000 people — the financial internal rate of return (BMR) for the entire investment is between -4 % and 4 %. — the specific limits have been complied with in all its activities. — The energy demand of a building before development exceeds 150 kWh/m2a. — The applicant undertakes to achieve the ‘nearly zero’ level defined in the Decree of the Minister for National Development. 1.1. The project is in line with Action 4 of Priority 5 of the Baranya County Regional Development Programme (generation and supply based on the use of local energy sources). The territorial focus of the measure is the whole territory of the county. 1.2. 5 points (decrease of CO2 over 30 t/year) 2.1 after non-relevant 3.1 development, the building will be rated BB 3.2 solar panel installation will be realised 4.1 undertakes to involve more than 5 disadvantaged residents in the project (English)
9 February 2022
0 references
L’objectif du projet: Modernisation énergétique des bâtiments de la maison Szent Borbála à Komló. b) le contenu du projet: Activités auto-éligibles: — L’isolation thermique complète de façade, l’isolation thermique de toit plat et le remplacement complet des portes et des fenêtres sont préparés conformément aux exigences du décret no 7/2006 du 24 mai 2006 du ministre du Développement national — Le système photovoltaïque est établi indépendamment, activités facultatives: — Modernisation des systèmes de chauffage et des systèmes HMV liés aux équipements de production de chaleur à partir de combustibles fossiles: le remplacement des radiateurs n’est pas auto-éligible et obligatoire: — accessibilité: accessibilité proportionnelle au projet (parking accessible, rampe, toilettes et fenêtres) — désamiantage: en supprimant le schiste à vagues — Publication: sur la base des obligations d’information du bénéficiaire — élaboration de matériel de formation et formation: le transfert technique sera une condition préalable à la formation d’un expert en énergie. — préservation des valeurs protégées localement: non pertinent (c) le respect des conditions énoncées au point 3.2 de l’appel: 1) nous respectons la législation sur l’environnement et l’égalité des chances applicable au projet, nous préservons les valeurs naturelles et culturelles protégées dans la zone couverte par le projet, 2) la municipalité exprime un sentiment d’opportunité: ne médie pas la ségrégation, réduit les préjugés existants pour les groupes et n’exclut aucun groupe social du projet 3) Bâtiment formant un système énergétique indépendant 4) Le projet est basé sur une enquête et un calcul centrés sur l’énergie 5) Le projet ne présente pas de risque climatique prévisible 6) g) Home 7) la proportionalisation n’est pas requise 8) Les valeurs de planification sont conformes aux règles professionnelles-techniques et aux exigences pertinentes de l’appel, comme le prévoit le décret en vigueur du ministre des Transports, il y a le certificat énergétique initial 9) non pertinent 10) le certificat énergétique en vertu du décret gouvernemental 176/2008 (VI.30.) est en cours d’élaboration 11) le projet complexe (le bâtiment à développer est considéré comme un complexe de bâtiments) 12) le filtrage énergétique des bâtiments effectué 13) la modernisation de l’éclairage n’est pas réalisée 14-18) n’est pas pertinente, car aucun bâtiment protégé local ou monument ne doit être développé 19-23) voir ci-dessus 24) le plan de projet est joint en annexe 25) n’est pas pertinent, que -4 %<BMR<+ 4 % 26) non pertinents 27) les coûts des inspecteurs techniques ont été planifiés parmi les coûts éligibles du projet 28) le projet réduit les émissions nationales de GES en termes absolus 29) la condition est remplie 30) un certificat énergétique sera préparé même après la mise en œuvre. 31) les surcoûts résultant de l’évolution de l’environnement législatif sont à la charge du maître d’ouvrage. 32) la mesure de l’invertren (disponible 33) les règlements de suivi météorologique seront inclus 34) la programmation hebdomadaire sera assurée 35) la connexion au système sera possible 36-38) les conditions seront remplies — le coût à utiliser pour la formation est prévu 39-41) le demandeur obtient une déclaration de soutien du gouvernement du comté au plus tard à l’entrée de la période de maintenance, que le projet est conforme aux objectifs de la stratégie SEAP/SECAP, les actifs à acquérir sont au moins A+ d’énergie et la modernisation de l’éclairage n’est pas pertinente. 42-53) le contenu technique contenu dans l’investissement correspond à ces points de l’appel. 54-64) sans objet d) Satisfaction aux critères d’évaluation quant au fond: — Le projet s’inscrit dans la stratégie énergétique nationale 2030 et Hongrie II. Le plan d’action national pour l’efficacité énergétique. — L’investissement contribue à la réduction de la consommation d’énergie primaire et des émissions de gaz à effet de serre — le bâtiment concerné appartient à 100 % à la municipalité — les travaux de construction du projet sont soumis à des marchés publics et le respect des exigences légales en la matière sera assuré au cours de sa mise en œuvre — le projet n’est pas réalisé dans des agglomérations inférieures à 10 000 personnes — le taux de rendement interne financier (BMR) pour l’ensemble de l’investissement est compris entre -4 % et 4 %. — les limites spécifiques ont été respectées dans toutes ses activités. — La demande d’énergie d’un bâtiment avant développement dépasse 150 kWh/m2a. — La requérante s’engage à atteindre le niveau «presque zéro» défini dans le décret du ministre du développement national. 1.1. Le projet est conforme à l’action 4 de la priorité 5 du programme de développement régional du comté de Baranya (production et approvisionnement fondés sur l’utilisation de sources d’énergie locales). L’objectif territorial de la mesure est l’ensemble du territoire du comté. 1.2. 5 points (diminution du CO2... (French)
10 February 2022
0 references
Komló, Baranya
0 references
Identifiers
TOP-3.2.1-15-BA1-2016-00001
0 references