Energy development at the commercial site of Akmé Kft. (Q3933745)
Jump to navigation
Jump to search
Project Q3933745 in Hungary
Language | Label | Description | Also known as |
---|---|---|---|
English | Energy development at the commercial site of Akmé Kft. |
Project Q3933745 in Hungary |
Statements
1 March 2020
0 references
28 May 2022
0 references
AKMÉ Kereskedelmi és Szolgáltató Korlátolt Felelősségű Társaság
0 references
A fejlesztés keretében egyszerűsített energetika fejlesztés megvalósítására kerül sor, 36,58 kWh teljesítményű napelemes rendszer telepítésével. A rendszer műszaki paraméterei az alábbiakkal mutathatók be: 136 darab Canadian Solar 300 Wp POLY Perc technológiájú napelem telepítése 2 db Fronis Symo 20.0-3 S + wifi – inverter hozzá tartozó kiegészítő szerelési anyagokkal együtt A beépítésre kerülő termékek a legújabb, leginnovatívabb technológiák közé tartoznak, mérete kisebb a piacon elérhető átlagos termékekhez képest. Vágottcellás napelem felezett cellás kialakítása csökkenti a cellában fellépő feszültségeket a valós alkalmazási környezetben, miáltal csökken a mikro repedések kialakulásának esélye. A cellán áthaladó áramerősség felére csökkentését és a beeső fény hatékonyabb hasznosítását jelenti. PERC (Passivated Emitter and Rear Cell) technológia jelenti, hogy a cellák hátlapjára egy dielektromos alumínium vezetőréteget visznek fel, ami segít a cellán hasznosítatlanul áthaladó – és eddig a lamináló fóliában elnyelődött – fény egy részét visszatükrözni, visszavezetve azt az áramtermelés folyamatába. Ezáltal ugyanazon a felületen kb. 6%-kal magasabb hozamot érhetünk el. A PERC technológiával az elért teljesítmény növekedés mellett a hosszúhullámok jobb abszorpciója alakul ki. A dielektromos réteg hatékonyan tükrözi vissza az 1000 nm-nél hosszabb hullámhosszúságú infravörös fénysugarakat, így azok „hasznosíthatóvá” válnak. A hajnali, alkonyati vagy felhős időszakban inkább a nagyobb hullámhosszúságú fénysugarak vannak jelen, és mivel ezeket a PERC napelem jobb hatékonysággal tudja hasznosítani, ezekben az időszakokban nagyobb teljesítményt ad le, mint hagyományos társai. A projekt keretében az alábbi előkészítő tevékenységek megvalósítására került sor: A vállalkozás felvette a kapcsolatot energetikussal, a fejlesztési helyszín vonatkozásában az elmúlt három év fogyasztási adatainak feltérképezése után körvonalazódott a fejlesztés irányvonala. Ezt követően került sor kivitelező vállalkozások megkeresésére a piaci ár valamint elérhető minőségek feltérképezése tekintetében. A beérkezett ajánlatok, műszaki tartalom, árak figyelembe vételével került sor a fejlesztés műszaki tartalmának meghatározására. A statikus az épületet megvizsgálta, szakértői nyilatkozatot kiállította. Az épületek tetőszerkezetét megvizsgálva készült el a modulkiosztás. A projekt keretében csak a napelemes rendszer telepítésével kapcsolatban kerül költség elszámolásra. A kivitelezés menete az alábbi tevékenységeket tartalmazza – a teljes folyamat az elszámolható költségek megvalósítása érdekében az alábbiak szerint zajlik: A vállalkozói szerződés megkötésével egyidőben megtörténik a szolgáltatói ügyintézés (igénybejelentés) valamint a csatlakozási dokumentáció benyújtása. A szolgáltató elfogadó válaszát követően kerül sor a kivitelezés megvalósítására. A szolgáltató felé történő készre jelentés után kerül sor az AD-VESZ fogyasztásmérő felszerelésére és a szaldó elszámolásra. A kivitelezés lezárultával a vállalkozó végszámlát állít ki, a projekt lezárul, az elszámolás megtörténik. A vállalkozás korábban még nem valósított meg EU támogatás felhasználásával pályázatot, ugyanakkor mint beszállító részt vett számtalan projekt megvalósításában, az adminisztratív feladatok elvégzését illetően így megfelelő ismeretekkel rendelkezik. További ismertető külön dokumentumban csatolva. (Hungarian)
0 references
Within the framework of the development, a simplified energy development will be carried out with the installation of a 36.58 kWh solar panel system. The technical parameters of the system can be described by: Installation of 136 pieces of Canadian Solar 300 Wp POLY Perc Technology solar panel 2 pcs Fronis SYMO 20.0-3 S + wifi — inverter together with its additional mounting materials The products to be installed are among the latest, most innovative technologies, smaller than the average products available on the market. The half-cell design of cut cell solar panel reduces cell tensions in the real application environment, reducing the chances of micro-cracking. It means halving the current through the cell and making more efficient use of the incident light. Minute (Passivated Emitter and Rear Cell) technology means that a dielectric aluminium conductive layer is applied to the back of the cells, which helps to reflect some of the light that has passed through the cell — and has so far absorbed in the laminate film — reflecting it back into the process of generating electricity. This allows a yield of about 6 % higher on the same surface. With PERC technology, improved absorption of long-waves develops in addition to the achieved performance growth. The dielectric layer effectively reflects infrared beams with wavelengths greater than 1000 nm, making them “available”. In the dawn, dusk, or cloudy seasons, light beams with higher wavelengths are present, and since they can be utilised by the PERC solar panel with better efficiency, it delivers more power in these periods than its traditional counterparts. The following preparatory activities were carried out under the project: The company contacted the energetician, with regard to the development site, after mapping the consumption data for the last three years, the direction of development was outlined. Subsequently, construction companies were contacted in order to map the market price and the available quality. The technical content of the development was determined taking into account the tenders, technical content and prices received. The static looked at the building, issued an expert statement. The modularisation was completed by examining the roof structure of the buildings. In the framework of the project, costs will only be declared in connection with the installation of the solar system. The implementation process includes the following activities — the whole process is carried out as follows in order to realise the eligible costs: At the same time as the contract is concluded, the service provider’s administration (application notification) and the connection documentation are submitted. After the acceptance of the service provider, the implementation will be carried out. Once reported to the supplier, the AD-VESZ meter is installed and the payroll is accounted for. Upon completion of the implementation, the contractor issues a final invoice, the project is closed and the accounts are made. The company has not previously implemented a tender using EU funding, but as a supplier, it has been involved in the implementation of numerous projects and therefore has the necessary knowledge of the administrative tasks. A further presentation is attached in a separate document. (English)
8 February 2022
0 references
Dans le cadre du développement, un développement énergétique simplifié sera réalisé avec l’installation d’un système de panneaux solaires de 36,58 kWh. Les paramètres techniques du système peuvent être décrits par: Installation de 136 pièces de Canadian Solar 300 Wp POLY Perc Technology panneau solaire 2 pcs Fronis SYMO 20.0-3 S + wifi — onduleur avec ses matériaux de montage supplémentaires Les produits à installer sont parmi les dernières technologies les plus innovantes, plus petites que la moyenne des produits disponibles sur le marché. La conception d’une demi-cellule du panneau solaire à cellules coupées réduit les tensions cellulaires dans l’environnement d’application réel, réduisant ainsi les risques de microcraquage. Cela signifie réduire de moitié le courant à travers la cellule et faire une utilisation plus efficace de la lumière incidente. La technologie Minute (Emetteur Passivated et Cellule arrière) signifie qu’une couche conductrice diélectrique d’aluminium est appliquée à l’arrière des cellules, ce qui aide à refléter une partie de la lumière qui a traversé la cellule — et a jusqu’à présent absorbé dans le film stratifié — qui le reflète dans le processus de production d’électricité. Cela permet un rendement d’environ 6 % plus élevé sur la même surface. Avec la technologie PERC, l’absorption améliorée des longues ondes se développe en plus de la croissance de performance atteinte. La couche diélectrique réfléchit efficacement les faisceaux infrarouges avec des longueurs d’onde supérieures à 1000 nm, ce qui les rend «disponibles». À l’aube, au crépuscule ou aux saisons nuageuses, des faisceaux lumineux ayant des longueurs d’onde plus élevées sont présents, et comme ils peuvent être utilisés par le panneau solaire PERC avec une meilleure efficacité, il fournit plus d’énergie à ces périodes que ses homologues traditionnels. Les activités préparatoires suivantes ont été menées dans le cadre du projet: L’entreprise a contacté l’énergétique, en ce qui concerne le site de développement, après avoir cartographié les données de consommation des trois dernières années, la direction du développement a été définie. Par la suite, des entreprises de construction ont été contactées afin de cartographier le prix du marché et la qualité disponible. Le contenu technique du développement a été déterminé en tenant compte des offres, du contenu technique et des prix reçus. Le statique a examiné le bâtiment, a publié une déclaration d’expert. La modularisation a été complétée par l’examen de la structure du toit des bâtiments. Dans le cadre du projet, les coûts ne seront déclarés que dans le cadre de l’installation du système solaire. Le processus de mise en œuvre comprend les activités suivantes — l’ensemble du processus est réalisé comme suit afin de réaliser les coûts éligibles: En même temps que le contrat est conclu, l’administration du prestataire de services (notification de candidature) et la documentation relative à la connexion sont soumises. Après l’acceptation du prestataire de services, la mise en œuvre sera effectuée. Une fois signalé au fournisseur, le compteur AD-Vesz est installé et la paie est comptabilisée. Une fois la mise en œuvre terminée, le contractant émet une facture finale, le projet est clôturé et les comptes sont établis. L’entreprise n’a pas précédemment mis en œuvre un appel d’offres au moyen d’un financement de l’UE, mais en tant que fournisseur, elle a participé à la mise en œuvre de nombreux projets et possède donc la connaissance nécessaire des tâches administratives. Une autre présentation est jointe dans un document séparé. (French)
10 February 2022
0 references
Szombathely, Vas
0 references
Identifiers
GINOP-4.1.4-19-2019-00174
0 references