Building energy development of the headquarters of “H Plusz R” Ltd. in Kálmánház (Q3933688)

From EU Knowledge Graph
Revision as of 10:58, 10 February 2022 by DG Regio (talk | contribs) (‎Changed an Item: Adding French translations)
Jump to navigation Jump to search
Project Q3933688 in Hungary
Language Label Description Also known as
English
Building energy development of the headquarters of “H Plusz R” Ltd. in Kálmánház
Project Q3933688 in Hungary

    Statements

    0 references
    6,826,500 forint
    0 references
    18,876.71 Euro
    0.00276521 Euro
    3 December 2021
    0 references
    33,929.264 Euro
    0.0027336256 Euro
    15 December 2021
    0 references
    12,411,818.182 forint
    0 references
    55.0 percent
    0 references
    2 March 2020
    0 references
    30 June 2022
    0 references
    "H Plusz R" Kereskedelmi és Szolgáltató Korlátolt Felelősségű Társaság
    0 references
    0 references

    47°52'37.81"N, 21°35'55.82"E
    0 references
    A vállalkozás kálmánházi székhelyén található üzletét fejlesztené napelemes rendszerrel. A fejlesztés során kialakításra kerülne egy komplett napelemes rendszer, amely 76 db Jinko Solar JKM335M-60 H Cheetah panelből, az ehhez tartozó 1 db Solar Edge SE 25K inverterből, 76 Optimizer P370 ból és a hozzá tartozó tetőre kerülő állványzatból áll. A fejlesztést megelőzően elkészültek az üzlet tervei. Felmérték a tető méretét, a szükséges energiaigényt. A fejlesztésre vonatkozóan megkérték, hogy nem építési engedélyköteles a beruházás. Statikus és energetikus került alkalmazásra a fennálló feltételek megismerésének érdekében. Több napelemet forgalmazó cégtől kértek árajánlatot a legjobb ár-érték arány megtalálásának érdekében. Igény bejelentő került megküldésre a szolgáltató részére. A lehetséges szállító garantálja a szakszerű ellátást, szervizelést, megfelelő garanciális háttérrel rendelkezik. A projekt elvégzéshez szükséges menedzsmenti feladatok ellátásról az ügyvezető igazgató és egy külsős projektmenedzser felelős. A felelősek szorosan együttműködnek a pénzügyi feltételek megteremtését követően a kiválasztott szállítóval és a műszaki ellenőrrel. A beszerelést követően a kivitelezővel együttműködve megkötik a hálózati csatlakozási szerződést, majd ezt követően műszaki ellenőrzés és próbaüzem következik, amennyiben nem észlelhető probléma megtörténik a fejlesztés átadása. A kivitelező kiadja a teljesítmény nyilatkozatot, a távfelügyeletet biztosítja. A 69 db napelem együttes maximális névleges teljesítménye 28006kW/h, amely összesen 2 körön csatlakozik az inverter munkapontjaira. A csatlakozáshoz 4, illetve 6 mm2-es napelemekhez kifejlesztett dupla szigetelt, UV álló kábel kerül alkalmazásra. Az inverter előtt kialakított túlfeszültség és túláram védelmi berendezések gondoskodnak rendszer egyenáramú oldali védelméről. A háromfázisú inverterek elmenő vezetékei 0,4 kV-os kábelen csatlakoznak a hálózatra egy-egy önálló 40 A-es kismegszakítón keresztül. A rendszer normál üzemben automatikusan működik. A napelem táblák az időjárás viszontagságainak ellenállnak. A megvásárolni kívánt panel innovatív módon elrendezett elemekkel (cellákkal) és az azok gyártására vonatkozó új technológiával rendelkezik. Ezzel az újítással nagyobb teljesítmény és élettartam érhető el. Ezáltal fokozható a megtérülési ráta és a cég költségei csökkennek. A fejlesztés a kevesebb szolgáltatói villamos energia felhasználással és a megújuló energia használatával óvja a környezetet és hozzájárul a természeti értékek megőrzéséhez, illetve üvegházhatást okozó gázok kibocsátásának csökkentéséhez. (Hungarian)
    0 references
    The company would develop its business in Kálmánháza with a solar panel system. The development of a complete solar system consisting of 76 Jinko Solar JKM335M-60 H Cheetah panels, the corresponding Solar Edge SE 25K inverter, 76 Optimiser P370 and the related scaffolding on the roof. Before the development, the plans of the shop were completed. They've assessed the size of the roof, the energy required. With regard to the development, it was requested that the project was not subject to a construction permit. Static and energetic was used to understand the prevailing conditions. A number of solar panel companies were asked for quotations to find the best value for money. An applicant has been sent to the service provider. The potential supplier guarantees professional care, servicing, and has a proper warranty background. The managing director and an external project manager are responsible for the management tasks required to perform the project. They shall cooperate closely with the selected supplier and the technical inspector once the financial conditions have been established. After installation, the network connection contract will be concluded in cooperation with the contractor, and then technical inspection and testing will be carried out if no detectable problem is transferred. The contractor issues a declaration of performance and ensures remote monitoring. The maximum rated power of 69 solar panels combined is 28 006 kW/h, connected to the inverter’s working points for a total of 2 circles. Double insulated UV standing cables for 4 and 6 mm² solar panels are used for connection. Overvoltage and over current protection devices before the inverter ensure the DC side protection of the system. The three-phase inverters are connected to the network via a 0.4 kV cable via a stand-alone 40 A cut-off. The system operates automatically in normal operation. Solar panels are resistant to weather conditions. The panel to be purchased has innovatively arranged elements (cells) and new technology for their production. With this innovation, greater performance and life can be achieved. This will increase the rate of return and reduce the company’s costs. The development will protect the environment by using less electricity suppliers and renewable energy and contribute to the preservation of natural assets and the reduction of greenhouse gas emissions. (English)
    8 February 2022
    0 references
    La société développerait ses activités à Kálmánháza avec un système de panneaux solaires. Le développement d’un système solaire complet composé de 76 panneaux Jinko Solar JKM335M-60 H Cheetah, l’onduleur Solar Edge SE 25K correspondant, 76 Optimizer P370 et l’échafaudage connexe sur le toit. Ils ont évalué la taille du toit, l’énergie nécessaire. En ce qui concerne le développement, il a été demandé que le projet ne soit pas soumis à un permis de construire. Statique et énergétique ont été utilisés pour comprendre les conditions prévalant. Un certain nombre d’entreprises de panneaux solaires ont été invitées à obtenir des devis pour trouver le meilleur rapport qualité-prix. Un demandeur a été envoyé au prestataire de services. Le fournisseur potentiel garantit des soins professionnels, l’entretien, et a une bonne base de garantie. Le directeur général et un chef de projet externe sont responsables des tâches de gestion nécessaires à l’exécution du projet. Ils coopèrent étroitement avec le fournisseur sélectionné et l’inspecteur technique une fois les conditions financières établies. Après l’installation, le contrat de raccordement au réseau sera conclu en coopération avec le contractant, puis un contrôle technique et des essais seront effectués si aucun problème détectable n’est transféré. Le contractant émet une déclaration de performance et assure un suivi à distance. La puissance nominale maximale de 69 panneaux solaires combinés est de 28 006 kW/h, reliée aux points de travail de l’onduleur pour un total de 2 cercles. Des câbles UV isolés doubles pour des panneaux solaires de 4 et 6 mm² sont utilisés pour le raccordement. Les dispositifs de protection contre les surtensions et les surintensités avant l’onduleur assurent la protection latérale CC du système. Les onduleurs triphasés sont connectés au réseau via un câble de 0,4 kV via une coupure autonome de 40 A. Le système fonctionne automatiquement en fonctionnement normal. Les panneaux solaires résistent aux conditions météorologiques. Le panneau à acheter dispose d’éléments (cellules) disposés de manière innovante et de nouvelles technologies pour leur production. Grâce à cette innovation, plus de performance et de vie peuvent être réalisées. Cela augmentera le taux de rendement et réduira les coûts de l’entreprise. Le développement protégera l’environnement en utilisant moins de fournisseurs d’électricité et d’énergie renouvelable et contribuera à la préservation des actifs naturels et à la réduction des émissions de gaz à effet de serre. (French)
    10 February 2022
    0 references
    Kálmánháza, Szabolcs-Szatmár-Bereg
    0 references

    Identifiers

    GINOP-4.1.4-19-2019-00106
    0 references