“Fonyód on the way of development” The external energy renovation of the nursery (Q3951256)

From EU Knowledge Graph
Revision as of 13:35, 9 February 2022 by DG Regio (talk | contribs) (‎Changed an Item: Adding English translations)
Jump to navigation Jump to search
Project Q3951256 in Hungary
Language Label Description Also known as
English
“Fonyód on the way of development” The external energy renovation of the nursery
Project Q3951256 in Hungary

    Statements

    0 references
    0 references
    172,702,333 forint
    0 references
    477,558.22 Euro
    0.00276521 Euro
    6 December 2021
    0 references
    555,415.904 Euro
    0.0027336256 Euro
    15 December 2021
    0 references
    203,179,215.294 forint
    0 references
    84.999998 percent
    0 references
    31 January 2018
    0 references
    21 October 2019
    0 references
    FONYÓD VÁROS ÖNKORMÁNYZATA
    0 references
    0 references

    46°44'48.30"N, 17°32'58.06"E
    0 references
    A fonyódi Fő utca 25. szám alatti óvoda több évtizedes múltra tekint vissza, 1977-ben készült el, az akkor igen korszerű, 5 csoportos tágas épület, 125 fő 3-6 éves kor közötti gyerekek befogadására képes, valamint közvetlen mellette található egy bölcsőde és hozzá tartozó udvar mely 26 fő 0-3 év közötti gyerekek ellátását biztosítja. A hozzá tartozó udvar máig egyik nagy vonzereje óvodánknak, mely hatalmas, füvesített, fás kulturált játszótér a gyermekek számára, az óvodás gyermekek egyidejű befogadására alkalmas Égetően szükségszerű lenne a teljes infrastrukturális fejlesztés, mely magába foglalná a tető szigetelését, hőszigetelést, nyílászárók cseréjét. Az eltelt időszakban átépítésre nem került sor, így annak megvalósítása továbbra is kiemelt feladat. Az intézmény energia-felhasználása az elavult, rosszul szigetelő nyílászárók miatt igen magas, ezek cseréjére a gazdaságos működtetés miatt is szükséges. Az intézményben a nagy esőzések alatt folyamatos a beázás é a leázás, omlik a vakolat. A projekt célja elsősorban a fent leírt problémák megoldása mely során hatékonyabb energiafelhasználást és racionálisabb energiagazdálkodás elősegítése valósulhat meg. Az infrastrukturális fejlesztést követően kevesebb energiafelhasználásnak köszönhetően fennmaradó költségek lehetővé teszi a későbbiekben az Intézmény további fejlesztését. rojekt megvalósítása során az alábbi fejlesztéseket tervezzük: Lábazati hőszigetelés, homlokzati hőszigetelés, nyílászáró csere történik a teljes meglévő óvoda épületen. A bölcsődén nem történik homlokzati felújítás és nyílászárócsere. A lapos tetőkön új hő- és vízszigetelés készül. Az emeletbővítés hagyományos falazott szerkezettel történik a meglévő vázszerkezetre terhelve. Fedése az épület adottságait követve hasonlóan attikafalas, lapos tetős szerkezettel zárul. Az épületgépészeti rendszer változik. A felújított és bővített épületszerkezetek az érvényben lévő energetikai szabványoknak megfelelően lesznek kialakítva. Az Óvoda bővítését a TOP-1.4.1-16 kódszámú felhívásra benyújtott támogatás kérelemből kerül megvalósításra. A projekt összköltsége 150.000.000 Ft. Támogatási intenzitás: 100% (Hungarian)
    0 references
    The kindergarten at Fonyód Fő utca 25 has several decades of history, it was completed in 1977, the modern 5 group spacious buildings, 125 people can accommodate children aged 3-6 years, and next to it there is a crèche and its related courtyard providing care for children aged 0-3 years. The related courtyard is still one of the great attractions of our kindergarten, which is a huge, grass-plated, woody cultural playground for children, suitable for the simultaneous reception of preschool children, it would be necessary to complete the infrastructure development, which would include insulation of the roof, thermal insulation and replacement of doors and windows. No reconstruction has taken place in the past, so its implementation remains a priority. The institution’s energy use is very high due to outdated, poorly insulating windows, which are also necessary for their replacement due to economical operation. In the institution, during heavy rains, there is a continuous evacuation and cooling, the plaster collapses. The aim of the project is primarily to solve the problems described above in order to achieve more efficient energy use and the promotion of more rational energy management. After the infrastructure development, the remaining costs due to less energy use will allow the Institution to be further developed. during the implementation of rojekt we plan the following developments: Pedestal thermal insulation, facade thermal insulation, window replacement is carried out on the entire existing kindergarten building. In the crèche there is no facade refurbishment or replacement of doors and windows. New thermal and waterproofing is made on flat roofs. The floor extension is carried out with a traditional masonry structure loaded on the existing frame structure. Following the characteristics of the building, its cover is closed with a flat roof structure with a similar attic wall. The technical building system is changing. Refurbished and expanded building structures will be designed in accordance with existing energy standards. The extension of the nursery will be implemented from the grant application submitted in response to the call number TOP-1.4.1-16. The total cost of the project is HUF 150,000 000. Aid intensity: 100 % (English)
    9 February 2022
    0 references
    Fonyód, Somogy
    0 references

    Identifiers

    TOP-3.2.1-16-SO1-2017-00009
    0 references