Energy modernisation of municipal buildings Jászfényszarun (Q3950365)

From EU Knowledge Graph
Revision as of 12:07, 9 February 2022 by DG Regio (talk | contribs) (‎Changed an Item: Adding English translations)
Jump to navigation Jump to search
Project Q3950365 in Hungary
Language Label Description Also known as
English
Energy modernisation of municipal buildings Jászfényszarun
Project Q3950365 in Hungary

    Statements

    0 references
    79,648,500 forint
    0 references
    220,244.83 Euro
    0.00276521 Euro
    6 December 2021
    0 references
    256,151.975 Euro
    0.0027336256 Euro
    15 December 2021
    0 references
    93,704,117.647 forint
    0 references
    84.999997 percent
    0 references
    2 January 2018
    0 references
    15 January 2019
    0 references
    JÁSZFÉNYSZARU VÁROS ÖNKORMÁNYZATA
    0 references
    0 references

    47°34'6.67"N, 19°42'37.66"E
    0 references
    A projekt célja: az önkormányzati intézmények hatékonyabb és nagyobb arányú megújuló energia használata. A Felhívás 3.1: 3.1.1: „Maximum háztartási méretű kiserőmű (HMKE) fotovillamos rendszer kialakítása saját villamosenergia-igény kielégítése céljából”. 3.1.2: nincs. 3.1.3: „c” és „d” érinti a projektet. 3.1.4: nincs. A Felhívás 3.2: 1-2, 28-29, 51-52, A projektünk megfelel ezen pontoknak. 3, 7, 11-21, 25-26, 33-35, 40-50, 54-64, Projektünkre nem releváns. 4. A projekt terv ez alapján épült fel. 5. Projekt terv 12. pontja tartalmazza. 6. Projektünket érintő besorolás: f, g, i pontok, továbbá a nyilatkozatok között nyilatkoztunk a TOP 3.2.1 felhívásra. Az épületek 100 %-ban önkormányzati tulajdonúak. 8. Projektünk 2014.01.01 után kezdődik. 9-10, 30, Projektünkre nem releváns, mivel csak napelem felszerelése és rendszerbe állítása történik. 22. Projektterv 14. pontjában részletezve. 23. Ugyanezen 3.2 fejezet 2. pontja releváns ezen pontnál. 24. Elkészült, benyújtva. 27. Projektbe betervezve. 31, 39, A projektgazda vállalja. 32. A projektünkben benne van a mérő eszköz beszerelése. 36-38. A képzési dokumentumok elkészítése, az oktatások betervezésre kerültek a projektbe. A dokumentumok 1-1 példánya az adott épületeben is elhelyezésre kerülnek. A képzésekről jelenléti ívek készülnek a megadott paraméterekkel. A 16. 20. 53. 62. 65. pontokra a nyilatkozatok között nyilatkoztunk. Felhívás 4.4.3: 1.1-1.5, 2.3, 3.3-3.4, 4.1-4.2, 4.4-4.5, 7.1, 9.1, 10.4 pontok megfeleltek. 1.6-1.7, 2.1-2.2, 3.1-3.2, 4.3, 5.1, 6.1, 7.2, 8.1, 9.2, 10.1-10.3, 10.5-10.6, 11.1 pontok nem relevánsak. 6.2. Nem felelt meg (nem konzorciumban valósul meg). Rendelkezésre álló forrás: területi lehatárolás szerint: JNSZ Megye, Jászberényi kisjárás, benyújtás: második szakaszban. Terület-specifikus értékelési szempontok: 1.1.: Beavatkozási szintű illeszkedés: Jász-Nagykun-Szolnok Megyei Területfejlesztési Program 35. oldalán a 4.1.1. pont a Megújuló- és alternatív energiatermelést szolgáló fejlesztések szerepel, melyhez beavatkozási szintű kapcsolat szerepel. A II. 6.2.2. pontja érinti, Jászfényszaru nevesítve van. 2.1.: A rendőrség épületénél 10 évnél régebben, a Teaház épületénél 10 évnél régebben, a GAMESZ épülete 2013-ban lett újjá építve, az Egészségház épülete 2014-ben épült újjá, a Gondozási Központ épülete 2014-ben épült újjá, bővítésre került. Az egészségház rendelkezik napkollektorokkal. 2.2.: Jászfényszaru a Jászberényi járásban helyezkedik el, így a beruházás a kedvezményezett járások besorolásáról szóló 290/2014 (XI.26) Kormányrendelet 2. melléklete alapján kedvezményezett járásnak minősül. 3.1.: A fejlesztés eredményeként elért energiamegtakarítás mértéke az elmúlt 3 év átlagához viszonyítva: fejlesztés előtti állapot: 153.958,75 kWh/év fogyasztás teljes egészében vásárolt, a fejlesztés után: a vásárolt energia 26.208,75 kWh/év, mely alapján a fejlesztéssel érintett középületek éves primer-energia fogyasztásának csökkenése 80% felett van. 4.1.: A tervezett fejlesztéshez nem kapcsolódik élőmunkaigényes helyi tevékenység. Műszaki leírás: Az Egészségház épületének (1079/4 hrsz) tetőszerkezet stabil, elbírja a tetőre telepítendő berendezéseket. Az intézmény már rendelkezik meglévő napkollektoros rendszerrel, amivel a hőigényük nagy részét fedezni tudják. A 124 db 300 Wp teljesítményű napelem panelek az épület lapostetős tetőfelületére kerülnek fel D-i tájolásban. A rendszer 2 db 20 kW-os invertere a főelosztó mellé lesz elhelyezve. A Gondozási Központ épületének (13 hrsz) tetőszerkezet stabil, elbírja a tetőre telepítendő berendezéseket. A 126 db 300 Wp teljesítményű napelem panelek az épület DK-i és DNy-i tetőfelületére kerülnek fel. A rendszer 2 db 20 kW-os invertere a főelosztó mellé lesz elhelyezve. A Rendőrség épületének (1577 hrsz) tetőszerkezet stabil, elbírja a tetőre telepítendő berendezéseket. A 24 db 300 Wp teljesítményű napelem panelek az épület DNy-i tetőfelületére kerülnek fel. A rendszer 7,5 kW-os invertere a főelosztó mellé lesz elhelyezve. A Teaház (idősek nappali ellátása funkciót lát el) épületének (28 hrsz) tetőszerkezet stabil, elbírja a tetőre telepítendő berendezéseket. A 12 db 265 Wp teljesítményű napelem panelek az épület DNy-i tetőfelületére kerülnek fel. A rendszer 3,7 kW-os invertere a főelosztó mellé lesz elhelyezve. A GAMESZ épületének (318/3 hrsz) tetőszerkezet stabil, elbírja a tetőre telepítendő berendezéseket. A 140 db 300 Wp teljesítményű napelem panelek az épület DNy-i és DK-i tetőfelületére kerülnek fel. A rendszer 20 és 27,6 kW-os invertere a főelosztó mellé lesz elhelyezve. A napelemes rendszer felépítése: Az épület tetőszerkezetén elhelyezett napelemektől egyenáramú vezetékeken keresztül eljuttatjuk az energiát az inverterekig. Az inverter az épület belső főelosztójára csatlakozik, mely a közcélú hálózatból kapja a villamos energia ellátást – amennyiben a napelemes rendszer telepítésre kerül, úgy már AD-VESZ mérőn keresztül. (Hungarian)
    0 references
    The aim of the project is to: municipal institutions use more efficient and more renewable energy. The Call 3.1: 3.1.1: ‘Design of a small power plant (HMKE) with a maximum household size to meet its own electricity demand’. 3.1.2: No, I don't. 3.1.3: “C” and “d” concern the project. 3.1.4: No, I don't. The Call 3.2: 1-2, 28-29, 51-52, Our project meets these points. 3, 7, 11-21, 25-26, 33-35, 40-50, 54-64, not relevant to our project. 4. The project plan was built on this basis. 5. Set out in point 12 of the project plan. 6. Classification of our project: between points F, g, i and the statements, we made a statement in response to TOP 3.2.1. The buildings are 100 % owned by municipalities. 8. Our project starts after 01.01.2014. 9-10, 30, not relevant to our project, as only solar panels are installed and installed. 22. Detailed in point 14 of the project plan. 23. Point 2 of Chapter 3.2 is relevant to that point. 24. It’s done, it’s submitted. 27. Planned for a project. 31, 39, the project promoter undertakes. 32. Our project includes the installation of the measuring device. 36-38. The preparation of the training documents, the trainings were planned in the project. Copies 1 to 1 of the documents are also placed in the relevant building. Attendance lists are drawn up of the training courses with the specified parameters. ARTICLE 16 20. 53. 62. At point 65, we made a statement in the statements. Call 4.4.3: Points 1.1-1.5, 2.3, 3.3 to 3.4, 4.1 to 4.2, 4.4 to 4.5, 7.1, 9.1, 10.4 have been complied with. Points 1.6-1.7, 2.1 to 2.2, 3.1 to 3.2, 4.3, 5.1, 6.1, 7.2, 8.1, 9.2, 10.1-10,3, 10.5 to 10.6, 11.1 are not relevant. 6.2. Non-compliant (non-consortium). Available resources: according to territorial demarcation: JNSZ County, Jászberényi district, submission: second stage. Area-specific assessment criteria: 1.1.: Intervention level fit: On page 35 of the Jász-Nagykun-Szolnok County Regional Development Programme, section 4.1.1 contains the development of renewable and alternative energy production, to which there is an intervention-level connection. IN ANNEX II. 6.2.2. is affected by the name of Jászfénysarru. 2.1.: More than 10 years in the police building, 10 years in the Teahouse building, the GAMESZ building was rebuilt in 2013, the building of the Health House was rebuilt in 2014, the Care Center building was rebuilt in 2014 and expanded. The hospital has solar collectors. 2.2.: Jászfényszaru is located in Jászberény district, so the investment is considered to be a beneficiary district according to Annex 2 to Government Decree No 290/2014 (XI.26) on the classification of the beneficiary districts. 3.1.: The amount of energy savings achieved as a result of the development compared to the average over the last 3 years: pre-development status: Consumption of 153 958.75 kWh/year purchased in full, after development: the energy purchased is 26 208.75 kWh/year, according to which the reduction in annual primary energy consumption of public buildings affected by the development is above 80 %. 4.1.: There is no live labour intensive local activity associated with the planned development. Technical description: The roof structure of the Housing Building (1079/4hrsz) is stable, it can withstand the equipment to be installed on the roof. The institution already has an existing solar system to cover most of their heat demand. The 124 pcs 300 Wp solar panels are placed on the flat roof of the building in D orientation. The system will be placed next to the main distributor for 220 kW inverters. The roof structure of the Care Center building (13 hrsz) is stable, it can withstand the equipment to be installed on the roof. The 126 300 Wp solar panels are placed on the roof of the building in DK and DNy. The system will be placed next to the main distributor for 220 kW inverters. The roof structure of the police building (1577 hrs) is stable, it can carry the equipment to be installed on the roof. The 24 300 Wp solar panels are placed on the DNy roof surface of the building. The system’s 7.5 kW inverter will be placed next to the main divider. The roof structure of the building (28 hrs) of the Tea House (supplementing the daytime function of the elderly) is stable, it can withstand the equipment to be installed on the roof. The 12 pcs 265 Wp solar panels are placed on the DNy roof surface of the building. The system will be placed on a 3.7 kW inverter next to the main divider. The roof structure of the GAMESZ building (318/3hrsz) is stable, it can withstand the equipment to be installed on the roof. The 140 pcs 300 Wp solar panels are placed on the DNy and DK roof surfaces of the building. The system’s 20 and 27.6 kW inverters will be placed next to the main divider. Solar system construction: From solar panels placed on the roof of the building through direct current wiring to the inverters. The inverter is connected to the main internal distributor of the building, which receives electricity from the pub... (English)
    9 February 2022
    0 references
    Jászfényszaru, Jász-Nagykun-Szolnok
    0 references

    Identifiers

    TOP-3.2.1-15-JN1-2016-00075
    0 references