Development of the concrete plant at stake. (Q3946587)

From EU Knowledge Graph
Revision as of 11:07, 9 February 2022 by DG Regio (talk | contribs) (‎Changed an Item: Adding English translations)
Jump to navigation Jump to search
Project Q3946587 in Hungary
Language Label Description Also known as
English
Development of the concrete plant at stake.
Project Q3946587 in Hungary

    Statements

    0 references
    162,372,780 forint
    0 references
    448,994.84 Euro
    0.00276521 Euro
    6 December 2021
    0 references
    632,991.626 Euro
    0.0027336256 Euro
    15 December 2021
    0 references
    231,557,542.569 forint
    0 references
    70.121856 percent
    0 references
    1 August 2017
    0 references
    31 January 2021
    0 references
    TÉT VÁROS ÖNKORMÁNYZATA
    0 references
    0 references

    47°31'57.00"N, 17°29'34.80"E
    0 references
    1./ Általános ismertetés: Tét város Polgármesteri Hivatal a tulajdonában álló gyártó- és raktárcsarnok, valamint az iroda épület felújítását tervezi. A csarnok területén a világítási hálózat, valamint a gépészeti erőátviteli hálózat kerül felújításra, a meglevő erőátviteli hálózat változatlanul megmarad. Az iroda épületben a teljes villamos hálózat elbontásra és felújításra kerül. A tervezési terület tűzvédelmi besorolása: "D" A költségvetésben kiírt anyagok, berendezések –kizárólag a Megrendelő és Tervező jóváhagyása után - azonos műszaki paraméterű és használati értékű más anyagokkal, berendezésekkel helyettesíthetők. 2./ Villamosenergia ellátás: A terület, ezen belül a csarnok és iroda épületek villamos energia ellátása jelenleg megoldott. A csarnok és az iroda épültek felújítást követően a villamos energia igény kis mértékben növekszik, az eddigi gépek, berendezések továbbra is megmaradnak, de új gépészeti berendezések kerülnek beépítésre. Új központi kazánház létesül. Az iroda épület villamos energia ellátása, a kazánházi épület elbontása miatt, a csarnok főelosztó berendezéséből csatlakoztatjuk le. Az Önkormányzat a költség hatékony villamos energiagazdálkodás céljából energetikai korszerűsítést is tervez, így többek közt a tetőre napelemes rendszer épül ki, mely csatlakozik a most meglévő villamos hálózatra. A napelemes rendszer tervezése, és az Áramszolgáltatói egyeztetések nem jelen tervezési munka része, arra önálló tervdokumentáció készül. Jelen tervezés során beépített villamos teljesítmény: Pbe= 66 kW Jelen tervezés egyidejű villamos energia igénye: Pei =39 kW (3x63 A) Az energiaellátás feszültségszintje: 3 fázis + N~50Hz 400/230V. A csarnok és az iroda villamos energia igénye a raktár területén található meglévő főelosztóból továbbra is biztosítható. A főelosztó áramköreinek kiegészítését követően kerül megoldásra a csarnok világítási hálózata, a kazánház betápja, az új gépészeti berendezések és az iroda villamos energia ellátása. A meglévő főelosztót át kell alakítani a következők szerint: - A 4 db új elosztó berendezés részére 4db 3x32A új áramkörök kialakítása. - A kazánház részére 1db 3x32A új leágazás kiépítése - Az iroda épület részére 1db 3x40A új leágazás kiépítése Érintésvédelem módja: Nullázás (TN-C-S), EPH-val kiegészítve. 3./ Elosztó berendezés: A csarnok területén négy új, falra rögzített, korszerű készülékekkel szerelt maszkos kivitelű, zárható ajtóval ellátott, fém elosztó berendezést (E1, E2, E3, E4 jelű) tervezünk. Ezekből az elosztóból történik az adott csarnok rész világítási hálózatának és néhány új dugalj áramkörnek, a termo ventilátoroknak, motoros kapuknak, valamint a térvilágításnak a villamos energia ellátása. A kazánházi berendezések energia ellátását az EK jelű elosztó biztosítja. A csarnok bejárata mellett elhelyezett, meglévő főkapcsolóval történik a csarnok tűzvédelmi lekapcsolása. Az iroda épületbe egy új elosztó berendezést (ESZ jelű) tervezünk, mely az erőátviteli, a dugaszoló aljzatok és a világítási hálózat áramköreit tartalmazza. Védelmi készülékek: áramtalanító főkapcsoló, kismegszakítók, áramvédő kapcsolók, túlfeszültség és zárlat védelemmel. 4./ Villamos hálózat bontása: A csarnok teljes világítási hálózata, valamint az ezekhez tartozó tokozott elosztó berendezések elbontásra kerülnek. A bontási munkák során az üzemen kívüli kábeleket, vezetékeket is el kell bontani. Az iroda épület felújítása során a meglévő villamos hálózatot teljes körűen el kell bontani. Az elbontásra kerülő régi kazánház épületének betáp kábelét, áramtalanítás után, ki kell kötni, az érvégeket megfelelő módon le kell szigetelni. Ezt a kábelt, az épülettől kb 5 méter távolságba, a létesítendő járdán kivülre, -0,70 m mély földárokba kell helyezni. Az elbontott anyagokat nem lehet újból felhasználni. Nem bontható el a gyártógép betápja, a meglévő gépészeti berendezések kábelei, és a meglévő dugaszoló aljzatok hálózata, azoknak továbbra is biztosítani kell a lecsatlakozást a főelosztóból. 5./ Áramköri vezetékek: A csarnokban a villamos hálózat szerelése falon kívül, kábel tálcába helyezett, ill. a függőleges szakaszokon vastag falú műanyag védőcsövekbe húzott rézerű kiskábellel történik. A lámpatesteket önálló sodrony tartószerkezetre kell felszerelni, melyet az álmennyezet feletti acéltartóhoz kell rögzíteni. A kábeleket a sodronyra kell szerelni. Az iroda épületben a szerelés falba süllyesztett, műanyag védőcsövekbe húzott rézerű vezetékkel történik. Típusuk: NYM-J, MCu 6./ Világítási berendezések: Az egyes területek megvilágításának erősségét az MSZ EN 12464 szabvány előírása szerint tervezzük. Megvilágítási értékek: Csarnok gyártótér 300-350 lux Csarnok raktárak 200-250 lux Iroda 500 lux Közlekedő 150 lux Öltözők 200-250 lux Mosdó, WC 200 lux A csarnokba és az iroda épületbe LED fényforrású lámpatestek kerülnek felszerelésre. A raktárak és a gyártó tér világításának kapcsolása több fokozatban az adott terület elosztó berendezéséről történik. A bejárati kapuk felöli ol (Hungarian)
    0 references
    1./General presentation: Bet City Mayor’s Office is planning to renovate the production and storage hall and the office building. The lighting network and the mechanical power transmission network will be refurbished in the hall area, and the existing power transmission network will remain unchanged. The entire electrical network in the office building will be dismantled and refurbished. Fire protection classification of the design area: “D” Substances and equipment entered in the budget may be replaced by other materials and equipment with the same technical parameters and utility value only after approval by the Customer and Designer. 2./Electricity supply: The area, including the hall and office buildings, is currently supplied with electricity. After the renovation of the hall and office building, the demand for electricity is growing slightly, the existing machinery and equipment will continue to be preserved, but new mechanical equipment will be installed. It’s a new central boiler room. The electrical energy supply of the office building, due to the dismantling of the boiler building, is connected from the main distribution equipment of the hall. The Municipality is also planning to modernise energy for the purpose of efficient electricity management, including a solar system on the roof, which is connected to the existing electricity grid. The design of the solar system, and the electricity supply reconciliations, are not part of the present design work, and separate design documentation is prepared for it. Electrical power installed during the present design: PBE= 66 kW Current design requires simultaneous electricity: Pei = 39 kW (3x63 A) Voltage level of power supply: Phase 3 + N~50 Hz 400/230V. The demand for electricity in the hall and office can still be ensured from the existing main distributor located in the warehouse. Following the completion of the main distribution circuits, the lighting network of the hall, the feed-in of the boiler room, the supply of new mechanical equipment and the electrical power of the office will be solved. The existing main divider shall be restructured as follows: — 4pcs 3x32A new circuits for the 4 new distribution equipment. — For the boiler room 1pcs 3x32A new branch construction — For the office building 1pcs 3x40Development of a new branching method: Zeroing (TN-C-S), supplemented by EPH. 3./Distribution equipment: In the area of the hall, we design four new metal distribution devices (E1, E2, E3, E4) with masked design, fitted with a lockable door, mounted on the wall. From these distributors, electricity is supplied to the lighting network of the given hall section and to some new plug circuits, thermal fans, motor gates, and space lighting. The power supply of the boiler room equipment is provided by the EC-signed distributor. The fire protection of the hall is switched off by an existing main switch located next to the entrance to the hall. In the office building we design a new distribution device (ES) containing the circuits of the power transmission, plug sockets and lighting network. Protective devices: depowering main switch, small circuit breakers, current protection switches, overvoltage and short circuit protection. 4./Electric network breakdown: The entire lighting network of the hall and the associated enclosure distribution facilities will be dismantled. During demolition works, cables and cables outside the plant must also be dismantled. During the renovation of the office building, the existing electricity network shall be completely dismantled. The supply cable of the building of the old boiler room to be decommissioned shall be connected, and the ends shall be properly insulated. This cable must be placed in a ditch of -0.70 m deep, approximately 5 m away from the building, outside the pavement to be built. Decomposed materials shall not be reused. It is not possible to dismantle the input of the production machine, the cables of existing mechanical equipment and the network of existing plug sockets, they must continue to be provided with disconnection from the main distributor. 5./Circuit lines: In the hall, the electrical network is installed outside the wall by means of a small brass cable placed in a cable tray or drawn into thick plastic protective tubes on vertical sections. The luminaires shall be mounted on a self-contained wire support which shall be attached to the steel holder above the suspended ceiling. The cables must be mounted on the wire. In the office building, the installation is carried out by means of brass wire folded into a wall in plastic protective tubes. Type: Nym-J, MCU 6./Lighting equipment: The intensity of the illumination of each area is planned according to the standard MSZ EN 12464. Illumination values: Hall production area 300-350 lux Hall warehouses 200-250 lux Office 500 lux Communication 150 lux Dresses 200-250 lux Washroom, toilet 200 lux The hall and office building are equipped with L... (English)
    9 February 2022
    0 references
    Tét, Győr-Moson-Sopron
    0 references

    Identifiers

    TOP-1.1.1-15-GM1-2016-00009
    0 references