Installation of solar system at INDUSTRIAL ELECTRIC BAU Kft. (Q3935546)

From EU Knowledge Graph
Revision as of 21:57, 8 February 2022 by DG Regio (talk | contribs) (‎Changed an Item: Adding English translations)
Jump to navigation Jump to search
Project Q3935546 in Hungary
Language Label Description Also known as
English
Installation of solar system at INDUSTRIAL ELECTRIC BAU Kft.
Project Q3935546 in Hungary

    Statements

    0 references
    7,284,165 forint
    0 references
    20,142.25 Euro
    0.00276521 Euro
    3 December 2021
    0 references
    36,203.963 Euro
    0.0027336256 Euro
    15 December 2021
    0 references
    13,243,936.364 forint
    0 references
    54.99999 percent
    0 references
    5 March 2021
    0 references
    9 April 2021
    0 references
    INDUSTRIAL ELECTRIC BAU Szerelő és Szolgáltató Korlátolt Felelősségű Társaság
    0 references
    0 references

    47°57'20.81"N, 21°43'0.48"E
    0 references
    A napelemes rendszer a 440 Nyíregyháza, Tiszavasvári úton található (HRSZ: 0651/80) telephelyünkön kerül beüzemelésre. A fejlesztés által az épület energetikai besorolása CC-ről BB-re javul. A rendszer felépítése: 97 PV-modul, 2 inverter, 62 db optimalizáló. Az előzetes szimulációs eredményeket is csatoltuk. A projekt előkészítése során teljes tervezési munkát végeztünk, így mellékeltük az alábbiakat: tartószerkezeti terv, napelem és inverter elhelyezési vázrajz, SolarEdge terv, Stringing Report, statikai szakvélemény, szimulációs report, elhelyezési vázrajz. Jelenleg hasonló fejlesztést jobban, alaposabban nem lehet előkészíteni, megtervezni. Megvalósítás fő lépései: - Felmérés, tervezés: készen van - Napelemek tartószerkezeteinek telepítése - Napelemek szerelés, Inverter bekötése - Hálózati csatlakozás, engedélyezés. A hálózat csatlakozás nem igényel hálózatbővítést. Mindehhez küldő vállalkozót veszünk igénybe, akik megfelelő szakemberállománnyal rendelkeznek, referenciákat tudtak felmutatni: MB SOLAR General Kft. Cím: 4400 Nyíregyháza, Homok utca 18.; www.mbsolar.hu Ezenfelül cégünk több mérnökkel rendelkezik, akik a munkák elvégzésekor felügyelni tudják a megvalósítást (Barna Gergely, Labanics István). A megvalósítás során az alábbiak kerülnek telepítésre: napelem (97 db), inverterek (2 db), optimalizálók, tartószerkezet, antenna (wifi vezérléshez), elektromos szerelvények. A projekt fent vázolt megvalósításával és az előzetes energetikai kalkulációkkal, valamint a szimulációs reportnak köszönhetően a projekt megvalósítása nem jár kockázattal. A megvalósítás időigénye is tervezhető. (Hungarian)
    0 references
    The solar system is located on the 440 Nyíregyháza, Tiszavasvári street (HRSZ: 0651/80) will be installed at our site. The development improves the energy classification of the building from CC to BB. Structure of the system: 97 PV modules, 2 inverters, 62 optimisers. Preliminary simulation results are also attached. During the preparation of the project, we carried out a full planning work, so we attached the following: support structure plan, solar panel and inverter placement skeleton, SolarEdge plan, Stringing Report, static opinion, simulation report, placement frame drawing. At present, similar developments cannot be better prepared or planned. Main steps of implementation: — Survey, planning: ready — Installation of solar panel support structures — Installation of solar panels, Inverter connection — Network connection, authorisation. Network connection does not require network expansion. We use a sender for all this, who have the right staff, and they have been able to provide references: MB SOLAR General Ltd. Address: 4400 Nyíregyháza, 18. Homok street; www.mbsolar.hu Furthermore, our company has several engineers who can supervise the implementation of the works (Gergely Barna, István Labanics). During the implementation, the following will be installed: solar panel (97 pcs), inverters (2 pcs), optimisers, support structure, antenna (for wifi control), electrical fittings. Thanks to the project implementation outlined above and preliminary energy calculations, as well as the simulation report, there is no risk of project implementation. It is also possible to plan the time needed for implementation. (English)
    8 February 2022
    0 references
    Nyíregyháza, Szabolcs-Szatmár-Bereg
    0 references

    Identifiers

    GINOP-4.1.4-19-2020-02677