Production Verticum Extension at ASG Water Machine Ltd. (Q3913713)

From EU Knowledge Graph
Revision as of 14:08, 8 February 2022 by DG Regio (talk | contribs) (‎Changed an Item: Adding English translations)
Jump to navigation Jump to search
Project Q3913713 in Hungary
Language Label Description Also known as
English
Production Verticum Extension at ASG Water Machine Ltd.
Project Q3913713 in Hungary

    Statements

    0 references
    296,605,883 forint
    0 references
    820,177.55 Euro
    0.00276521 Euro
    3 December 2021
    0 references
    1,801,798.744 Euro
    0.0027336256 Euro
    14 December 2021
    0 references
    659,124,184.444 forint
    0 references
    45.0 percent
    0 references
    15 September 2015
    0 references
    10 January 2017
    0 references
    ASG Vízgép Korlátolt Felelősségű Társaság
    0 references
    0 references

    47°35'1.61"N, 18°23'52.91"E
    0 references
    1: termelési kapacitás bővülés: A 2813 szivattyú gépgyártáshoz kapcsoló termelési kapacitásbővítés valósul meg: A nagymérető duplex és acél szivattyúkkal a meglévő piacok eladási bővíthető, nagyobb értékű termék, illetve végtermék állítható elő amely direkt módon értékesíthető. 2. Előkészítő tevékenységek: Egy olyan területen valósítunk meg fejlesztést, melyben a vezetésnek már komoly gyakorlata van, hiszen következetesen valósított meg az elmúlt években is hasonló fejlesztéseket, részben támogatásból. A projekt menedzsment tagjainak jártassága tehát megfelelő. Korábban beszerzésre került több gyártó gép és a vevői igények feltérképezése megtörtént, ennek az ismeretében alakítottuk ki a megalapozott fejlesztésünk. Az építés nem engedély köteles. 3 . A projekt legfontosabb lépései: célunk több eszköz beszerzése és egy próbamedence építése, amelyben nagy gyakorlatunk van. A projektet 2016.12.31-ig megvalósítjuk. 4. Szakmai standardok: a fejlesztés során az szakmai (ISO, DIN) szabványok és a beszállítói követelmények (A kat) figyelembe véve járunk el. A beszerzendő eszközök kiválasztásánál ismert szállítókat választottunk, jó szervizháttérrel. 5. a szakmai standardok megvalósulását biztosító eljárások, módszerek és a szakmai színvonal biztosítása és fenntartása a projekt végrehajtása során: A működés és megvalósítás során nagy hangsúlyt fektetünk a bevezetett minőségirányitási rendszer használatára és a beszállítók által megkövetelt eljárásokat követjük, így a projekt eredményes megvalósítása és fenntartása problémamentes lesz. 6. A technológiai beruházásokban a projekt menedzsmentnek nagy tapasztalata van, révén már több ilyen projektet valósított meg támogatás segítségével. 7. Az eszköz újdonságtartalma, többlet értéke: képesek leszünk a versenytársaknál magasabb kapacitást kínálni és nagyobb pontosság mellett jobb minőséget, tartósabb termékeket. Továbbá képesek leszünk saját termékkel megjelenni a piacon. 8. megvalósuló projektelemek bemutatása: Építés: a próbamedence tkp. a gyártási folyamat utolsó eleme, teszteljük az elkészült termékeket, így nem lesz vevőreklamáció, javul a minőség és a kapacitás. A beszerzendő eszközök két célt szolgálnak a technológiai folyamatban: 1) Szivattyú mérőberendezéssel, a szivattyú gyártás elengedhetetlen feltétele, késztermék e-nélkül nem gyártható, szervesen kapcsolódik a próbamedencéhez, a tesztelés szíve lesz 2) Élhajlító, eszterga, daruk, forgató, fűrész: a meglévőknél nagyobb szivattyúk gyártását teszi lehetővé. K+F+I tevékenység: cégünk a beszállítókkal együtt folyamatosan fejleszti, teszteli a termékéket, ennek egyik eleme volt a gyártási folyamat egyszerűsítése, a kézi utómunka megszűntetése egy nagy pontosságú lángvágó beszerzéssel. (Hungarian)
    0 references
    1: increase in production capacity: The production capacity extension for the 2813 pump machine production is achieved: With large duplex and steel pumps, existing markets can be expanded, higher value products and final products can be produced directly. 2. Preparatory activities: We are implementing development in an area where management already has a strong practice, since it has consistently implemented similar developments in recent years, partly through support. The skills of the project management members are therefore appropriate. Several manufacturing machines have been procured earlier and customer needs have been identified, and we have developed our well-founded development in the knowledge of this. Construction is not required by permission. 3. Key steps of the project: our goal is to acquire more equipment and build a trial pool in which we have great experience. The project will be implemented by 31.12.2016. 4. Professional standards: in the course of development, we act in accordance with professional (ISO, DIN) standards and supplier requirements (A kat). When selecting the equipment to be procured, we have selected known suppliers with a good service background. 5. to ensure and maintain the procedures, methods and professional standards that ensure the implementation of professional standards during the implementation of the project: During operation and implementation, we place great emphasis on the use of the established quality guidance system and follow the procedures required by the suppliers, so the effective implementation and maintenance of the project will be without problems. 6. In technology investments, project management has a lot of experience and has already implemented several of these projects with the help of grants. 7. Novelty and added value of the asset: we will be able to offer higher capacity than competitors and better quality, more durable products with higher accuracy. In addition, we will be able to enter the market with our own product. 8. Presentation of project elements: Construction: the test pool tkp. is the last part of the production process, we test the finished products, so there will be no customer complaint, quality and capacity will be improved. The assets to be procured serve two purposes in the technological process: 1) Pump measuring equipment, an essential condition for pump production, finished product without e-manufacture, organically connected to the test basin, the heart of the test will be 2) Bending, lathe, cranes, rotator, saw: allows the production of larger pumps than existing ones. R & D & I activity: our company, together with the suppliers, continuously develops and tests our products, one of the elements of this was the simplification of the production process, the elimination of manual post-production with a high precision flame cutter procurement. (English)
    8 February 2022
    0 references
    Tatabánya, Komárom-Esztergom
    0 references

    Identifiers

    GINOP-1.2.1-15-2015-00041
    0 references