ACCELERATION OF THE ROUTE — ROUTE BIOCOCCA-ARGUS (Q2017425)

From EU Knowledge Graph
Revision as of 23:39, 9 February 2022 by DG Regio (talk | contribs) (‎Changed an Item: Edited by the infer coords bot - inferring coordinates from location)
Jump to navigation Jump to search
Project Q2017425 in Italy
Language Label Description Also known as
English
ACCELERATION OF THE ROUTE — ROUTE BIOCOCCA-ARGUS
Project Q2017425 in Italy

    Statements

    0 references
    0.0 Euro
    0 references
    82,651,981.85 Euro
    0 references
    0.0 percent
    0 references
    1 January 2003
    0 references
    20 December 2022
    0 references
    RFI SPA - RETE FERROVIARIA ITALIANA
    0 references

    37°16'42.96"N, 15°10'55.70"E
    0 references
    L'INTERVENTO Ê COSTITUITO DAL 1^ LOTTO FUNZIONALE BICOCCA ¿ AUGUSTA, CHE CORRISPONDE ALLA FASE 2 DEL GP. LA REALIZZAZIONE DELLA TRATTA BICOCCA ¿ AUGUSTA PREVEDE I SEGUENTI PRINCIPALI INTERVENTI: ¿7 VARIANTI DI TRACCIATO; ¿ADEGUAMENTI DELLE OPERE ESISTENTI PER GARANTIRE LA DURABILITà DELLE STESSE;¿RIPRISTINO DELLE OPERE DI REGIMENTAZIONE IDRAULICA (FOSSI DI GUARDIA, RECAPITI, ETC.);¿INTERVENTI DI STABILIZZAZIONE DELLE SCARPATE (CHIODATURE, MURI DI PLACCAGGIO, DISGAGGIO DI BLOCCHI DI PIETRA ETC);¿SOTTOPASSO, SCALE, RAMPE NELLA STAZIONE DI LENTINI;¿REALIZZAZIONE NEGLI IMPIANTI DI STAZIONE DEI TRONCHINI DI SICUREZZA; ¿REALIZZAZIONE NICCHIONI TECNOLOGICI ALL¿INTERNO DELLA GALLERIA VALSAVOIA; ¿ADEGUAMENTO AI REQUISITI MINIMI PREVISTI DAL D.M. 28/10/2005 ¿SICUREZZA NELLE GALLERIE FERROVIARIE¿ PER L¿ESISTENTE GALLERIA VALSAVOIA DI LUNGHEZZA PARI A 1519 M; ¿REALIZZAZIONE DI N. 3 NUOVI CAVALCAFERROVIA E N. 2 PONTI CANALI. INOLTRE, SONO PREVISTI INTERVENTI NEGLI IMPIANTI DI: S (Italian)
    0 references
    THE INTERVENTION WAS MADE UP OF THE 1 ^ BICOCCA FUNCTIONAL LOT — AUGUSTA — WHICH CORRESPONDS TO THE 2 PHASE OF THE PG. THE IMPLEMENTATION OF THE BICOCCA Â VIIAUGUSTA PROVIDES FOR THE FOLLOWING MAIN MEASURES: Â BECOMES 7 VARIANTS; Â — ADAPTATIONS TO EXISTING WORKS TO ENSURE THAT THE WORKS ARE CARRIED OUT IN ORDER TO ENSURE THAT THE WORKS ARE CARRIED OUT ELECTRONICALLY (SECURITY DITCHES, CONTACT DETAILS, ETC.); Â OF STABILISATION OF THE SLOPES (CURDLING, RUNNING WALLS, DISGAGGIO OF BLOCK OF STONE ETC); Â OF THE UNDERPASS, STAIRS, RAMPS IN THE LENTINI STATION; Â TO BE CARRIED OUT IN THE STATION STATIONS FOR THE SAFETY RINGS; Â BECOMES A NICCHIPNOHIPRONIC TECHNOLOGY ATTACHMENT TO THE INTERIOR OF THE VALSAVOIA TUNNEL; Â TO ADAPT TO THE MINIMUM REQUIREMENTS LAID DOWN IN MINISTERIAL DECREE NO 28/10/2005 Â IN THE FERROVIIESREALM OF THE EXISTING VALSAVAI TUNNELS OF 1 519 M IN LENGTH. Â TOWARDS THE REALISATION OF N. 3 NEW RAIL AND N. 2 CANAL BRIDGES. THERE WILL ALSO BE INTERVENTIONS IN THE FOLLOWING PLANTS: S (English)
    0 references
    L’INTERVENTION SE COMPOSE DU LOT FONCTIONNEL 1ST BICOCCA Â’AUGUSTA, QUI CORRESPOND À LA PHASE 2 DU GP. LA RÉALISATION DE LA SECTION BICOCCA Â’AUGUSTA COMPREND LES PRINCIPALES INTERVENTIONS SUIVANTES: 7 VARIANTES D’ITINÉRAIRES; ADAPTATIONS DES OUVRAGES EXISTANTS AFIN D’ASSURER LA DURABILITÉ DES OUVRAGES EXISTANTS; RÉTABLISSEMENT DES OUVRAGES DE RÉGIMENT HYDRAULIQUE (GARDES, COORDONNÉES, ETC.); STABILISATION DES ESCARPEMENTS (E.G. CLOUAGE, MURS DE PLACAGE, BLOCS DE PIERRE, ETC.); PASSAGE INFÉRIEUR, ESCALIERS, RAMPES DANS LA GARE DE LENTINI; MISE EN ŒUVRE DES INSTALLATIONS DES STATIONS DE SÉCURITÉ; RÉALISATION DE NICHES TECHNOLOGIQUES AU SEIN DE LA GALERIE VALSAVOIA; ADAPTATION AUX EXIGENCES MINIMALES DU DÉCRET MINISTÉRIEL 28/10/2005 SUR LA SÉCURITÉ FERROVIAIRE TUNNELS POUR LE TUNNEL EXISTANT DE VALSAVOIA D’UNE LONGUEUR DE 1519 M; RÉALISATION DE N. 3 NOUVEAUX PASSAGES ET 2 PONTS DU CANAL. EN OUTRE, DES INTERVENTIONS SONT PRÉVUES DANS LES USINES DE: S (French)
    14 December 2021
    0 references
    DE INTERVENTIE BESTAAT UIT DE 1ST FUNCTIONELE PARTIJ BICOCCA Â’AUGUSTA, DIE OVEREENKOMT MET FASE 2 VAN DE GP. DE REALISATIE VAN DE SECTIE BICOCCA Â’AUGUSTA OMVAT DE VOLGENDE BELANGRIJKE INTERVENTIES: 7 ROUTEVARIANTEN; AANPASSINGEN VAN BESTAANDE WERKEN OM DE DUURZAAMHEID VAN BESTAANDE WERKEN TE WAARBORGEN;Â HERSTEL VAN HYDRAULISCHE REGIMENTWERKEN (WACHTEN, CONTACTGEGEVENS, ENZ.); STABILISATIE VAN DE STEKKEN (E.G. NAGELEN, PLATINGWANDEN, STENEN BLOKKEN ENZ.);Â ONDERDOORGANG, TRAPPEN, HELLINGEN IN HET STATION VAN LENTINI;Â IMPLEMENTATIE VAN VEILIGHEIDSLOGSTATIONINSTALLATIES; REALISATIE VAN TECHNOLOGISCHE NICHES BINNEN DE VALSAVOIA GALERIJ; AANPASSING AAN DE MINIMUMEISEN VAN MINISTERIEEL BESLUIT 28/10/2005 Â’VEILIGHEID OP DE SPOORWEG TUNNELS VOOR DE BESTAANDE VALSAVOIA TUNNEL MET EEN LENGTE VAN 1519 M; REALISATIE VAN N. 3 NIEUWE OVERBRUGGEN EN 2 KANAALBRUGGEN. DAARNAAST ZIJN INTERVENTIES GEPLAND IN DE FABRIEKEN VAN: S (Dutch)
    22 December 2021
    0 references
    DIE INTERVENTION BESTEHT AUS DEM 1ST FUNKTIONALEN LOS BICOCCA ¿AUGUSTA, DAS DER PHASE 2 DES GP ENTSPRICHT. DIE REALISIERUNG DES ABSCHNITTS BICOCCA ¿AUGUSTA UMFASST FOLGENDE HAUPTINTERVENTIONEN: ¿7 ROUTENVARIANTEN; ANPASSUNGEN BESTEHENDER ARBEITEN ZUR GEWÄHRLEISTUNG DER DAUERHAFTIGKEIT BESTEHENDER ARBEITEN; WIEDERHERSTELLUNG VON HYDRAULISCHEN REGELWERKEN (SCHUTZEINRICHTUNGEN, KONTAKTANGABEN USW.); STABILISIERUNG DER SCHNITZEREIEN (E.G. NAGELN, BESCHICHTUNGSWÄNDE, STEINBLÖCKE USW.); UNTERFÜHRUNG, TREPPEN, RAMPEN IN DER STATION LENTINI; IMPLEMENTIERUNG VON SICHERHEITS-LOG-STATION-INSTALLATIONEN; REALISIERUNG TECHNOLOGISCHER NISCHEN INNERHALB DER GALERIE VALSAVOIA; ANPASSUNG AN DIE MINDESTANFORDERUNGEN DES MINISTERIALDEKRETS 28/10/2005 ¿SICHERHEIT IN DER EISENBAHN TUNNELS FÜR DEN BESTEHENDEN TUNNEL VALSAVOIA MIT EINER LÄNGE VON 1519 M; REALISIERUNG VON N. 3 NEUEN ÜBERFÜHRUNGEN UND 2 KANALBRÜCKEN. DARÜBER HINAUS SIND INTERVENTIONEN IN FOLGENDEN ANLAGEN GEPLANT: S (German)
    24 December 2021
    0 references
    LA INTERVENCIÓN CONSISTE EN EL LOTE FUNCIONAL 1ST BICOCCA?AUGUSTA, QUE CORRESPONDE A LA FASE 2 DEL GP. LA REALIZACIÓN DE LA SECCIÓN BICOCCA?AUGUSTA INCLUYE LAS SIGUIENTES INTERVENCIONES PRINCIPALES: 7 VARIANTES DE RUTA; ADAPTACIONES DE LAS OBRAS EXISTENTES PARA GARANTIZAR LA DURABILIDAD DE LAS OBRAS EXISTENTES; RESTABLECIMIENTO DE LAS OBRAS HIDRÁULICAS DE RÉGIMEN (GUARDIAS, DATOS DE CONTACTO, ETC.); ESTABILIZACIÓN DE LOS ESCARPES (E.G. CLAVADO, PAREDES DE REVESTIMIENTO, BLOQUES DE PIEDRA, ETC.); PASO SUBTERRÁNEO, ESCALERAS, RAMPAS EN LA ESTACIÓN DE LENTINI; IMPLEMENTACIÓN DE INSTALACIONES DE ESTACIÓN DE REGISTRO DE SEGURIDAD; REALIZACIÓN DE NICHOS TECNOLÓGICOS DENTRO DE LA GALERÍA VALSAVOIA; ADAPTACIÓN A LOS REQUISITOS MÍNIMOS DEL DECRETO MINISTERIAL 28/10/2005?SEGURIDAD EN TUNNELS FERROVIARIOS PARA EL TÚNEL EXISTENTE DE VALSAVOIA DE 1519 M DE LONGITUD; REALIZACIÓN DE N. 3 NUEVOS PASOS SUPERIORES Y 2 PUENTES DEL CANAL. ADEMÁS, SE PLANIFICAN INTERVENCIONES EN LAS PLANTAS DE: S (Spanish)
    24 January 2022
    0 references
    CATANIA
    0 references
    AUGUSTA
    0 references
    CARLENTINI
    0 references
    LENTINI
    0 references

    Identifiers

    J11H03000150001
    0 references