GENERAL STATION (Q2021710)

From EU Knowledge Graph
Revision as of 08:59, 7 February 2022 by DG Regio (talk | contribs) (‎Changed an Item: import item from Italy)
Jump to navigation Jump to search
Project Q2021710 in Italy
Language Label Description Also known as
English
GENERAL STATION
Project Q2021710 in Italy

    Statements

    0 references
    16,505,599.28 Euro
    0 references
    22,342,317.13 Euro
    0 references
    73.88 percent
    0 references
    27 September 2017
    0 references
    24 May 2021
    0 references
    TERNA - RETE ELETTRICA NAZIONALE
    0 references
    0 references

    40°32'54.31"N, 16°13'37.85"E
    0 references
    IL PRESENTE PROGETTO RIGUARDERà LA REALIZZAZIONE DI UNA NUOVA STAZIONE ELETTRICA DI TRASFORMAZIONE 380150KV DI GARAGUSO (MT) DA INSERIRE IN ENTRA - ESCE SULL'ESISTENTE ELETTRODOTTO LARINO - ALIANO, FUNZIONALE ALL'INCREMENTO DELL'ENERGIA IMMESSA IN RETE DA IMPIANTI FER E PER LE QUALI LE CONGESTIONI DERIVANTI DALLE RISALITE COMPORTANO L'IMPOSSIBILITà DI EVACUARE EFFICACEMENTE L'ENERGIA PRODOTTA SIA DALLA GD CHE DA IMPIANTI DIRETTAMENTE CONNESSI ALLA RTNNELLA PORZIONE DI RETE IN OGGETTO, Ê STATA RICHIESTA DAL DISTRIBUTORE LA CONNESSIONE DI UNA FUTURA CABINA PRIMARIA PER CONSENTIRE L'IMMISSIONE SULLA RETE DI AT DI NUOVO PREVENTIVI DA FONTE RINNOVABILE PER UN TOTALE DI 80 MW IN IMMISSIONE. LA RICHIESTA DA PARTE DEL DISTRIBUTORE A TERNA DI UNA SOLUZIONE DI CONNESSIONE ALLA RTN DERIVA DALL'IMPOSSIBILITà DEL DISTRIBUTORE DI ACCOGLIERE NUOVA POTENZA DA RES SULLA RETE MTBT. LA REALIZZAZIONE DELLA NUOVA SE DI GARAGUSO SI RENDE INOLTRE NECESSARIA PER CONSENTIRE L'IMMISSIONE SULLA RETE ELETTRI (Italian)
    0 references
    THE PRESENT PROJECT WILL COVER THE CONSTRUCTION OF A NEW 380150KV POWER STATION IN GARAGUSO (MT) TO BE INCLUDED IN THE ENTRY — EXITING THE EXISTING ELECTRICITY STATION LARINO — ALIANO, FUNCTIONAL TO THE INCREASE IN ENERGY FED INTO THE GRID BY RES INSTALLATIONS, AND FOR WHICH THE CONGESTION FROM THOSE PLANTS INVOLVES THE IMPOSSIBLE TO EVACUATE THE ENERGY FROM BOTH THE GD AND THE INSTALLATIONS DIRECTLY LINKED TO THE NETWORK IN QUESTION, EVEN IF THE DISTRIBUTOR HAS REQUESTED THE CONNECTION OF A FUTURE PRIMARY CABIN TO ALLOW NEW QUOTES FROM RENEWABLE SOURCES TO BE PLACED ON THE NETWORK FOR A TOTAL OF 80 MW IN STORAGE. THE REQUEST BY THE DISTRIBUTOR TO TERNA OF A SOLUTION TO RTN IS THE RESULT OF THE DISTRIBUTOR’S NEW POWER FROM RES ON THE MTBT NETWORK. IN ADDITION, THE INTRODUCTION OF THE NEW SYSTEM IS NECESSARY TO ALLOW THE INTRODUCTION OF THE ELECTRIC NETWORK. (English)
    0 references
    CE PROJET CONCERNE LA CONSTRUCTION D’UNE NOUVELLE CENTRALE DE TRANSFORMATEUR 380150KV À GARAGUSO (MT) À INSÉRER DANS L’ENTRÉE — SORTIES SUR LA LIGNE ÉLECTRIQUE EXISTANTE LARINO — ALIANO, FONCTIONNELLE POUR AUGMENTER L’ÉNERGIE INJECTÉE DANS LE RÉSEAU PAR LES CENTRALES SER ET POUR LAQUELLE LES ENCOMBREMENTS RÉSULTANT DES HAUSSES CONDUISENT À L’IMPOSSIBILITÉ D’ÉVACUER EFFICACEMENT L’ÉNERGIE PRODUITE PAR GD ET LES INSTALLATIONS DIRECTEMENT CONNECTÉES À LA PARTIE RTNNELLA DU RÉSEAU EN QUESTION, LE DISTRIBUTEUR A DEMANDÉ LA CONNEXION D’UNE FUTURE CABINE PRIMAIRE POUR PERMETTRE L’INTRODUCTION DE NOUVELLES ESTIMATIONS À PARTIR DE SOURCES RENOUVELABLES DANS LE RÉSEAU POUR UN TOTAL DE 80 MW. LA DEMANDE DU DISTRIBUTEUR À TERNA POUR UNE SOLUTION DE RACCORDEMENT RTN DÉCOULE DE L’INCAPACITÉ DU DISTRIBUTEUR À ACCUEILLIR DE NOUVELLES SOURCES D’ÉNERGIE SER SUR LE RÉSEAU MTBT. LA RÉALISATION DU NOUVEAU GARAGUSO EST MÊME NÉCESSAIRE POUR PERMETTRE L’INSERTION SUR LE RÉSEAU ÉLECTRIQUE (French)
    14 December 2021
    0 references
    DIT PROJECT ZAL BETREKKING HEBBEN OP DE BOUW VAN EEN NIEUWE TRANSFORMATORCENTRALE VAN 380150KV IN GARAGUSO (MT) DIE IN DE INGANG MOET WORDEN OPGENOMEN — UITGANGEN OP DE BESTAANDE ELEKTRICITEITSLIJN LARINO — ALIANO, DIE FUNCTIONEEL IS OM DE ENERGIE DIE DOOR RES-CENTRALES AAN HET NET WORDT GELEVERD, TE VERHOGEN EN WAARVOOR CONGESTIE ALS GEVOLG VAN DE STIJGINGEN LEIDT TOT DE ONMOGELIJKHEID OM DE ENERGIE DIE WORDT GEPRODUCEERD DOOR ZOWEL GD ALS INSTALLATIES DIE RECHTSTREEKS OP HET RTNNELLA-GEDEELTE VAN HET BETROKKEN NET ZIJN AANGESLOTEN, DAADWERKELIJK TE EVACUEREN. DE DISTRIBUTEUR HEEFT VERZOCHT OM DE AANSLUITING VAN EEN TOEKOMSTIGE PRIMAIRE CABINE OM DE INVOERING VAN NIEUWE RAMINGEN UIT HERNIEUWBARE BRONNEN IN HET NET VOOR EEN TOTAAL VAN 80 MW MOGELIJK TE MAKEN. HET VERZOEK VAN DE DISTRIBUTEUR AAN TERNA OM EEN RTN-VERBINDINGSOPLOSSING VLOEIT VOORT UIT HET ONVERMOGEN VAN DE DISTRIBUTEUR OM NIEUWE ELEKTRICITEIT UIT HERNIEUWBARE BRONNEN OP HET MTBT-NETWERK OP TE NEMEN. DE REALISATIE VAN DE NIEUWE GARAGUSO IS OOK NODIG OM HET INBRENGEN OP HET ELEKTRISCHE NETWERK MOGELIJK TE MAKEN (Dutch)
    23 December 2021
    0 references
    DIESES PROJEKT BETRIFFT DEN BAU EINES NEUEN 380150KV-TRANSFORMATORSKRAFTWERKS IN GARAGUSO (MT), DAS IN DEN EINGANG EINGEBRACHT WERDEN SOLL – AUSGÄNGE AN DER BESTEHENDEN LARINO-ALIANO-STROMLEITUNG, FUNKTIONAL ZUR ERHÖHUNG DER ENERGIE, DIE DURCH RES-ANLAGEN INS NETZ EINGESPEIST WIRD UND FÜR DIE ENGPÄSSE, DIE SICH AUS DEN ANSTIEGEN ERGEBEN, NICHT MÖGLICH SIND, DIE VON GD ERZEUGTE ENERGIE UND ANLAGEN, DIE DIREKT MIT DEM RTNNELLA-TEIL DES BETREFFENDEN NETZES VERBUNDEN SIND, EFFEKTIV ZU EVAKUIEREN. DER VERTEILER HAT DEN ANSCHLUSS EINER KÜNFTIGEN PRIMÄRKABINE BEANTRAGT, UM DIE EINFÜHRUNG NEUER SCHÄTZUNGEN AUS ERNEUERBAREN QUELLEN FÜR INSGESAMT 80 MW IN DAS NETZ ZU ERMÖGLICHEN. DER ANTRAG DES VERTRIEBSUNTERNEHMENS AN TERNA AUF EINE RTN-VERBINDUNGSLÖSUNG ERGIBT SICH AUS DER UNFÄHIGKEIT DES VERTRIEBSUNTERNEHMENS, NEUE RES-STROMVERSORGUNG IM MTBT-NETZ AUFZUNEHMEN. DIE REALISIERUNG VON DEM NEUEN GARAGUSO IST AUCH NOTWENDIG, UM DIE EINFÜGUNG AUF DEM ELEKTRISCHEN NETZ ZU ERMÖGLICHEN (German)
    24 December 2021
    0 references
    ESTE PROYECTO SE REFERIRÁ A LA CONSTRUCCIÓN DE UNA NUEVA CENTRAL DE TRANSFORMADORES DE 380150 KV EN GARAGUSO (MT) QUE SE INSERTARÁ EN LA ENTRADA — SALIDAS EN LA LÍNEA ELÉCTRICA LARINO — ALIANO EXISTENTE, FUNCIONAL PARA AUMENTAR LA ENERGÍA ALIMENTADA A LA RED POR LAS CENTRALES FER Y PARA LAS CUALES LAS CONGESTIONES RESULTANTES DE LAS SUBIDAS CONDUCEN A LA EVACUACIÓN EFECTIVA DE LA ENERGÍA PRODUCIDA TANTO POR GD COMO POR PLANTAS DIRECTAMENTE CONECTADAS A LA PARTE RTNNELLA DE LA RED EN CUESTIÓN, EL DISTRIBUIDOR HA SOLICITADO LA CONEXIÓN DE UNA FUTURA CABINA PRIMARIA PARA PERMITIR LA INTRODUCCIÓN DE NUEVAS ESTIMACIONES DE FUENTES RENOVABLES EN LA RED POR UN TOTAL DE 80 MW. LA SOLICITUD DEL DISTRIBUIDOR A TERNA DE UNA SOLUCIÓN DE CONEXIÓN RTN SE DERIVA DE LA INCAPACIDAD DEL DISTRIBUIDOR PARA ACOMODAR NUEVA POTENCIA DE FER EN LA RED MTBT. LA REALIZACIÓN DEL NUEVO GARAGUSO ES NECESARIO TAMBIÉN PERMITIR LA INSERCIÓN EN LA RED ELÉCTRICA (Spanish)
    24 January 2022
    0 references
    GARAGUSO
    0 references

    Identifiers

    G53G17001650007
    0 references