LEARNING WIFI INFRASTRUCTURE (Q1869803)
Jump to navigation
Jump to search
Project Q1869803 in Italy
Language | Label | Description | Also known as |
---|---|---|---|
English | LEARNING WIFI INFRASTRUCTURE |
Project Q1869803 in Italy |
Statements
18,478.02 Euro
0 references
18,478.02 Euro
0 references
100.0 percent
0 references
19 February 2016
0 references
13 October 2016
0 references
7 November 2016
0 references
ALBA CENTRO STORICO
0 references
IL PROGETTO INFRASTRUTTURA WIFI PER LA DIDATTICA COINVOLGER TUTTI I 4 PLESSI DELLISTITUTO PERMETTENDO LA COPERTURA WIFI DEL 100 DEGLI EDIFICI SCOLASTICI ATTRAVERSO LE AZIONI PREVISTE DAL PROGETTO DOCENTI E ALLIEVI AVRANNO ATTRAVERSO LABORATORI LIM E DISPOSTIVI PERSONALI LA POSSIBILIT DI ACCESSO A INTERNET E ALLE RISORSE DIGITALI CHE LA SCUOLA METTE A DISPOSIZIONE IN TEMPO REALE QUESTO SVILUPPO PERMETTER DI OTTENERE UNA RICADUTA NOTEVOLE SUL FUNZIONAMENTO DIDATTICOAMMINISTRATIVOOIMPATTO DEL PROGETTO SULLA STRUTTURA SCOLASTICALIMPIANTO CHE SI INTENDE REALIZZARE NON ANDR A MODIFICARE LA STRUTTURA DEGLI EDIFICI E NON PREVEDE ALCUNA MODIFICA STRUTTURALE DELLIMPIANTO ELETTRICO GLI ACCESS POINT VERRANNO INSTALLATI IN MODO DA GARANTIRE UNA COPERTURA OMOGENEA VERRANNO ALIMENTATI IN MODALIT POE E SARANNO CONNESSI AL CENTRO STELLA DA APPOSITO CAVO DI RETE IL CABLAGGIO NECESSARIO ALLINSTALLAZIONE DEGLI ACCESS POINT SAR REALIZZATO CON CAVO DI RETE IN RAME TIPO UTP SECONDO LE NORMATIVE VIGENTI RELAT (Italian)
0 references
THE WIFI DELLISTICAL WIFI INFRASTRUCTURE PROJECT FOR THE TEACHING OF COINVOLGER ALL 4 OF THE SCHOOL BUILDINGS OF THE SCHOOL BUILDINGS, BY ENABLING THE WIFI COVERAGE OF THE SCHOOL BUILDINGS OF 100 THROUGH THE ACTIONS FORESEEN BY THE SCHOOL TEACHERS PROJECT AND PUPILS, WILL HAVE ACCESS TO THE INTERNET AND THE DIGITAL RESOURCES THAT THE SCHOOL MAKES AVAILABLE IN REAL TIME, WITH THE POSSIBILITY OF GAINING ACCESS TO THE INTERNET AND TO THE DIGITAL RESOURCES THAT THE SCHOOL MAKES AVAILABLE IN REAL TIME, IN ORDER TO ACHIEVE A SIGNIFICANT IMPACT ON THE FUNCTIONING OF THE BUILDING STRUCTURE, AND IT DOES NOT PROVIDE FOR ANY STRUCTURAL CHANGE TO THE INSTALLATION OF THE ACCESS POINT. THE ALLINSTLATION OF THE ACCESS POINT POINT SAR CARRIED OUT WITH COPPER NETWORK CABLE IN STANDARD COPPER COPPER IN ACCORDANCE WITH THE CURRENT REGULATIONS WILL BE LINKED TO THE BUILDING STRUCTURE OF THE BUILDINGS AND DOES NOT PROVIDE FOR ANY STRUCTURAL CHANGE IN THE INSTALLATION OF THE ELECTRICAL SYSTEM. (English)
0 references
LE PROJET D’INFRASTRUCTURE WIFI POUR L’ENSEIGNEMENT IMPLIQUE TOUS LES 4 PLEX DE L’INSTITUT PERMETTANT LA COUVERTURE DE 100 DES BÂTIMENTS SCOLAIRES À TRAVERS LES ACTIONS PRÉVUES PAR LES ENSEIGNANTS ET LES ÉTUDIANTS DU PROJET AURONT À TRAVERS LES LABORATOIRES LIM ET LES APPAREILS PERSONNELS LA POSSIBILITÉ D’ACCÈS À L’INTERNET ET AUX RESSOURCES NUMÉRIQUES QUE L’ÉCOLE MET À DISPOSITION EN TEMPS RÉEL CE DÉVELOPPEMENT PERMETTRA D’OBTENIR UNE CHUTE CONSIDÉRABLE SUR L’OPÉRATION DIDATTICOADMINISTRATITIMOOIMPATTO DU PROJET SUR LA STRUCTURE SCOLASTICALIMPIANTO QUI NE VA PAS MODIFIER LA STRUCTURE DES BÂTIMENTS ET NE PRÉVOIT PAS DE STRUCTURE LA MODIFICATION DES POINTS D’ACCÈS ÉLECTRIQUES DE L’USINE SERA INSTALLÉE AFIN DE GARANTIR UNE COUVERTURE HOMOGÈNE SERA ALIMENTÉE EN MODE POE ET SERA CONNECTÉE À L’ÉTOILE CENTRALE PAR CÂBLE RÉSEAU SPÉCIAL LE CÂBLAGE NÉCESSAIRE À L’INSTALLATION DU POINT D’ACCÈS SAR FAIT AVEC CÂBLE DE RÉSEAU EN CUIVRE TYPE UTP CONFORMÉMENT À LA RÉGLEMENTATION EN VIGUEUR (French)
10 December 2021
0 references
HET PROJECT WIFI-INFRASTRUCTUUR VOOR ONDERWIJS OMVAT ALLE 4 PLEXES VAN HET INSTITUUT DIE DE DEKKING VAN 100 SCHOOLGEBOUWEN MOGELIJK MAKEN VIA DE DOOR DE PROJECTDOCENTEN EN STUDENTEN GEPLANDE ACTIES, VIA LIM-LABORATORIA EN PERSOONLIJKE APPARATEN, DE MOGELIJKHEID OM TOEGANG TE KRIJGEN TOT HET INTERNET EN TOT DE DIGITALE MIDDELEN DIE DE SCHOOL IN REALTIME TER BESCHIKKING STELT, WAARDOOR EEN AANZIENLIJKE DALING KAN WORDEN VERKREGEN OP DE OPERATIE DIDATTICOADMINISTRATIVOOIMPATTO VAN HET PROJECT OP DE STRUCTUUR SCOLASTICALIMPIANTO, DAT NIET ZAL GAAN OM DE STRUCTUUR VAN DE GEBOUWEN TE WIJZIGEN EN GEEN STRUCTURELE AANPASSING VAN DE CENTRALE ELEKTRISCHE TOEGANGSPUNTEN ZAL WORDEN GEÏNSTALLEERD OM EEN HOMOGENE DEKKING TE GARANDEREN ZAL WORDEN GEVOED IN POE-MODUS EN ZAL WORDEN AANGESLOTEN OP DE CENTRUMSTER DOOR SPECIALE NETWERKKABEL DE BEDRADING NODIG VOOR DE INSTALLATIE VAN HET SAR-TOEGANGSPUNT GEMAAKT MET KOPEREN NETWERK KABEL TYPE UTP VOLGENS DE HUIDIGE REGELGEVING (Dutch)
22 December 2021
0 references
DAS PROJEKT WIFI-INFRASTRUKTUR FÜR DEN UNTERRICHT UMFASST ALLE 4 PLEXES DES INSTITUTS, DIE DIE ABDECKUNG VON 100 DER SCHULGEBÄUDE DURCH DIE VON DEN PROJEKTLEHRERN UND SCHÜLERN VORGESEHENEN MASSNAHMEN ERMÖGLICHEN, ÜBER LIM LABORE UND PERSÖNLICHE GERÄTE DIE MÖGLICHKEIT DES ZUGANGS ZUM INTERNET UND ZU DEN DIGITALEN RESSOURCEN, DIE DIE SCHULE IN ECHTZEIT ZUR VERFÜGUNG STELLT, WIRD ES ERMÖGLICHEN, EINEN ERHEBLICHEN RÜCKGANG DER OPERATION DIDATTICOADMINISTRATIVOOIMPATTO DES PROJEKTS ÜBER DIE STRUKTUR SCOLASTICALIMPIANTO, DIE NICHT GEHEN, UM DIE STRUKTUR DER GEBÄUDE ZU ÄNDERN UND KEINE STRUKTURELLE ÄNDERUNG VORGESEHEN VON DER ANLAGE WERDEN ELEKTRISCHE ZUGANGSPUNKTE INSTALLIERT, UM EINE HOMOGENE ABDECKUNG ZU GEWÄHRLEISTEN, DIE IM POE-MODUS EINGESPEIST WIRD UND DURCH SPEZIELLES NETZWERKKABEL MIT DEM ZENTRALSTERN VERBUNDEN WIRD, DIE FÜR DIE INSTALLATION DES SAR-ZUGANGSPUNKTS MIT KUPFERNETZKABEL TYP UTP GEMÄSS DEN GELTENDEN VORSCHRIFTEN ERFORDERLICHE VERKABELUNG (German)
23 December 2021
0 references
EL PROYECTO DE INFRAESTRUCTURA WIFI PARA LA DOCENCIA IMPLICA LOS 4 COMPLEJOS DEL INSTITUTO PERMITIENDO LA COBERTURA DE 100 DE LOS EDIFICIOS ESCOLARES A TRAVÉS DE LAS ACCIONES PREVISTAS POR EL PROYECTO PROFESORES Y ESTUDIANTES TENDRÁN A TRAVÉS DE LOS LABORATORIOS LIM Y DISPOSITIVOS PERSONALES LA POSIBILIDAD DE ACCESO A INTERNET Y A LOS RECURSOS DIGITALES QUE LA ESCUELA PONE A DISPOSICIÓN EN TIEMPO REAL ESTE DESARROLLO PERMITIRÁ OBTENER UNA CONSIDERABLE CAÍDA EN LA OPERACIÓN DIDATTICOADMINISTRATIVOOIMPATTO DEL PROYECTO SOBRE LA ESTRUCTURA SCOLASTICALIMPIANTO QUE NO IRÁ A MODIFICAR LA ESTRUCTURA DE LOS EDIFICIOS Y NO PREVÉ NINGUNA MODIFICACIÓN ESTRUCTURAL DE LA PLANTA SE INSTALARÁN PUNTOS DE ACCESO ELÉCTRICO PARA GARANTIZAR UNA COBERTURA HOMOGÉNEA SE ALIMENTARÁN EN MODO POE Y SE CONECTARÁN A LA ESTRELLA CENTRAL POR CABLE DE RED ESPECIAL EL CABLEADO NECESARIO PARA LA INSTALACIÓN DEL PUNTO DE ACCESO SAR HECHO CON CABLE DE RED DE COBRE TIPO UTP SEGÚN LA NORMATIVA VIGENTE (Spanish)
23 January 2022
0 references
Identifiers
C86J15001290007
0 references