CONSTRUCTION SITE ORGANISATION AND MANAGEMENT TECHNIQUES — PN (Q4272765)
Jump to navigation
Jump to search
Project Q4272765 in Italy
Language | Label | Description | Also known as |
---|---|---|---|
English | CONSTRUCTION SITE ORGANISATION AND MANAGEMENT TECHNIQUES — PN |
Project Q4272765 in Italy |
Statements
55,600.0 Euro
0 references
111,200.0 Euro
0 references
50.0 percent
0 references
AT CENTRO REGIONALE IFTS EDILIZIA/MANIFATTURA E ARTIGIANATO 2017-2020
0 references
IL TECNICO PER L'ORGANIZZAZIONE E GESTIONE DEL CANTIERE EDILE EFFETTUA LA PROGRAMMAZIONE E IL COORDINAMENTO DELLE ATTIVITÃ DI CANTIERE, NEL RISPETTO DELLA NORMATIVA AMBIENTALE E DI QUELLA IN MATERIA DI SALUTE E SICUREZZA SUL LAVORO. POSSIEDE CONOSCENZE SU TUTTO IL CICLO DI PRODUZIONE EDILIZIA, GESTISCE I PIANI OPERATIVI DI SICUREZZA, LA CONTABILITÃ DEI LAVORI E IL PROCESSO DI APPROVVIGIONAMENTO. E' IN GRADO DI DOCUMENTARE IL LAVORO EFFETTUATO E DI RAPPORTARSI POSITIVAMENTE CON DIVERSI INTERLOCUTORI. LA FIGURA PROFESSIONALE SI COLLOCA FRA LA PROGETTAZIONE ARCHITETTONICA E LA REALIZZAZIONE EDILE; PROPONE E REALIZZA SOLUZIONI COSTRUTTIVE, IMPIEGA TECNICHE E TECNOLOGIE INNOVATIVE DAL PUNTO DI VISTA DELL'ECONOMICITÃ , DELL'EFFICIENZA E DELLA TUTELA DELL'AMBIENTE E DEL PATRIMONIO. LA PROPOSTA FORMATIVA INTENDE AGGIUNGERE ALLA FIGURA NAZIONALE DI RIFERIMENTO ALCUNE SPECIFICHE COMPETENZE RICHIESTE DAL MONDO DEL LAVORO E DELLE PROFESSIONI. IL BIM QUALE PROCESSO OPERATIVO ORMAI VEDE IL SUO IMP (Italian)
0 references
THE TECHNICIAN FOR THE ORGANISATION AND MANAGEMENT OF THE CONSTRUCTION SITE CARRIES OUT THE PLANNING AND COORDINATION OF SITE ACTIVITIES, IN COMPLIANCE WITH ENVIRONMENTAL AND OCCUPATIONAL HEALTH AND SAFETY REGULATIONS. HE HAS KNOWLEDGE OF THE ENTIRE CONSTRUCTION PRODUCTION CYCLE, MANAGES SAFETY OPERATIONAL PLANS, WORKS ACCOUNTING AND THE PROCUREMENT PROCESS. IT IS ABLE TO DOCUMENT THE WORK CARRIED OUT AND TO RELATE POSITIVELY WITH DIFFERENT INTERLOCUTORS. THE PROFESSIONAL FIGURE IS PLACED BETWEEN ARCHITECTURAL DESIGN AND CONSTRUCTION; IT PROPOSES AND IMPLEMENTS CONSTRUCTIVE SOLUTIONS, EMPLOYS INNOVATIVE TECHNIQUES AND TECHNOLOGIES FROM THE POINT OF VIEW OF ECONOMY, EFFICIENCY AND PROTECTION OF THE ENVIRONMENT AND HERITAGE. THE TRAINING PROPOSAL AIMS TO ADD TO THE NATIONAL REFERENCE FIGURE SOME SPECIFIC SKILLS REQUIRED BY THE WORLD OF WORK AND PROFESSIONS. THE BIM AS AN OPERATIONAL PROCESS NOW SEES ITS IMP (English)
2 February 2022
0 references
LE TECHNICIEN CHARGÉ DE L’ORGANISATION ET DE LA GESTION DU CHANTIER ASSURE LA PLANIFICATION ET LA COORDINATION DES ACTIVITÉS DU CHANTIER, DANS LE RESPECT DES RÉGLEMENTATIONS ENVIRONNEMENTALES ET DE SANTÉ ET SÉCURITÉ AU TRAVAIL. IL A UNE CONNAISSANCE DE L’ENSEMBLE DU CYCLE DE PRODUCTION DE LA CONSTRUCTION, GÈRE LES PLANS OPÉRATIONNELS DE SÉCURITÉ, LA COMPTABILITÉ DES TRAVAUX ET LE PROCESSUS D’APPROVISIONNEMENT. IL EST EN MESURE DE DOCUMENTER LE TRAVAIL EFFECTUÉ ET D’ÉTABLIR DES RELATIONS POSITIVES AVEC DIFFÉRENTS INTERLOCUTEURS. LA FIGURE PROFESSIONNELLE EST PLACÉE ENTRE LA CONCEPTION ARCHITECTURALE ET LA CONSTRUCTION; ELLE PROPOSE ET MET EN ŒUVRE DES SOLUTIONS CONSTRUCTIVES, UTILISE DES TECHNIQUES ET DES TECHNOLOGIES INNOVANTES DU POINT DE VUE DE L’ÉCONOMIE, DE L’EFFICACITÉ ET DE LA PROTECTION DE L’ENVIRONNEMENT ET DU PATRIMOINE. LA PROPOSITION DE FORMATION VISE À AJOUTER AU CHIFFRE DE RÉFÉRENCE NATIONAL CERTAINES COMPÉTENCES SPÉCIFIQUES REQUISES PAR LE MONDE DU TRAVAIL ET DES PROFESSIONS. LE BIM EN TANT QUE PROCESSUS OPÉRATIONNEL VOIT MAINTENANT SON PIM (French)
3 February 2022
0 references
PORDENONE
0 references