REINFORCEMENT OF THE MUNICIPALITY’S SEWERAGE NETWORK — JOINT BENEFICIARY OF CASTEL MORRONE (EC) (Q4270977)
Jump to navigation
Jump to search
Project Q4270977 in Italy
Language | Label | Description | Also known as |
---|---|---|---|
English | REINFORCEMENT OF THE MUNICIPALITY’S SEWERAGE NETWORK — JOINT BENEFICIARY OF CASTEL MORRONE (EC) |
Project Q4270977 in Italy |
Statements
825,000.0 Euro
0 references
1,100,000.0 Euro
0 references
75.0 percent
0 references
COMUNE DI CASTEL MORRONE
0 references
IL PRESENTE PROGETTO RIGUARDA LA REALIZZAZIONE DEGLI INTERVENTI DI ADEGUAMENTO E COMPLETAMENTO DEL SISTEMA FOGNARIO A SERVIZIO DEL COMUNE DI CASTEL MORRONE (CE). IN PARTICOLARE, I SUDDETTI INTERVENTI RIGUARDANO LA REALIZZAZIONE DI NUOVI RAMI FOGNARI A SERVIZIO DI AMBITI URBANI ATTUALMENTE SPROVVISTI DI RETE DI RACCOLTA E SMALTIMENTO DELLE ACQUE FECALI, LUNGO I TRATTI INTERESSATI DALL'INTERVENTO ESISTE, VICEVERSA, UN SISTEMA DI DRENAGGIO PER LE ACQUE METEORICHE CHE RECAPITA NEGLI ALVEI NATURALI.I NUOVI RAMI FOGNARI FECALI TROVERANNO RECAPITO NEL SISTEMA FOGNARIO ESISTENTE (DI NATURA MISTA) E, MEDIANTE QUESTO, NEL NUOVO IMPIANTO DI DEPURAZIONE DI RECENTE REALIZZAZIONE UBICATO IN LOC. CASALE, PROGETTATO PER 2000 AB. EQ..GLI INTERVENTI PREVISTI IN PROGETTO CONSISTONO NELLA REALIZZAZIONE DI CIRCA 1700 M DI NUOVI COLLETTORI FOGNARI IN PVC, DI DIAMETRO VARIABILE DA DN200 A DN315. (Italian)
0 references
THIS PROJECT CONCERNS THE IMPLEMENTATION OF THE ADAPTATION AND COMPLETION OF THE SEWERAGE SYSTEM FOR THE MUNICIPALITY OF CASTEL MORRONE (EC). IN PARTICULAR, THE ABOVE-MENTIONED MEASURES CONCERN THE CONSTRUCTION OF NEW SEWERAGE BRANCHES SERVING URBAN AREAS CURRENTLY LACKING A FECAL WATER COLLECTION AND DISPOSAL NETWORK, ALONG THE SECTIONS CONCERNED BY THE INTERVENTION, CONVERSELY, THERE IS A DRAINAGE SYSTEM FOR RAINWATER THAT DELIVERS TO NATURALI HIVES.THE NEW FAECAL SEWERS WILL BE DELIVERED TO THE EXISTING SEWER SYSTEM (MIXED) AND, THROUGH THIS, TO THE NEW PURIFICATION PLANT RECENTLY BUILT IN LOC. CASALE, DESIGNED FOR 2000 AB. EQ..THE PLANNED INTERVENTIONS IN THE PROJECT CONSIST OF THE CONSTRUCTION OF ABOUT 1700 M OF NEW COLLECTING SYSTEMS IN PVC, WITH A DIAMETER VARYING FROM DN200 TO DN315. (English)
2 February 2022
0 references
CASTEL MORRONE
0 references