Implementation of the Rhine-Rhine Strategy (Q61264)

From EU Knowledge Graph
Revision as of 11:43, 26 February 2020 by DG Regio (talk | contribs) (‎Created claim: summary (P836): SCLLD has been established in the territory of the Local Action Group on the Republic of Poland, o.p.s., for the years 2014-2020, with an extension until 2023. The areas to be supported by the European Structural and Investment Funds (ESIF) shall be established on the basis of a territorial and public consultation. The local action group met a standard of standards, which created the necessary structure for transparent implementation. The main a...)
Jump to navigation Jump to search
Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Implementation of the Rhine-Rhine Strategy
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    3,496,997.4 Czech koruna
    0 references
    139,879.896 Euro
    1 October 2020
    0 references
    3,681,049.9 Czech koruna
    0 references
    147,241.996 Euro
    1 October 2020
    0 references
    94.9999998641692 percent
    0 references
    1 July 2015
    0 references
    31 March 2019
    0 references
    31 March 2019
    0 references
    RÝMAŘOVSKO, o.p.s.
    0 references
    0 references
    79501
    0 references
    Na území Místní akční skupiny RÝMAŘOVSKO, o.p.s. byla zpracována SCLLD pro roky 2014-2020 s přesahem do roku 2023. Na základě analýzy území a veřejném projednání jsou stanoveny oblasti, které budou podporovány prostřednictvím Evropských strukturálních a investičních fondů. Místní akční skupina splnila standartizaci, která vytvořila potřebnou strukturu pro transparentní čerpání. Hlavními aktivitami projektu je provozní činnost, animace SCLLD a školských zařízení. (Czech)
    0 references
    SCLLD has been established in the territory of the Local Action Group on the Republic of Poland, o.p.s., for the years 2014-2020, with an extension until 2023. The areas to be supported by the European Structural and Investment Funds (ESIF) shall be established on the basis of a territorial and public consultation. The local action group met a standard of standards, which created the necessary structure for transparent implementation. The main activities of the project are operational activities, animation of the SCLLD and school facilities. (English)
    0 references

    Identifiers

    CZ.06.4.59/0.0/0.0/15_003/0001856
    0 references